Претраживање
Приказ резултата 1-4 од 4
Developing Cost Estimation Models for Road Rehabilitation and Reconstruction: Case Study of Projects in Europe and Central Asia
(Journal of Construction Engineering and Management, 2014)
This paper presents the development of prediction models for the unit costs of road works that could be applied to strategic planning of road works at the network level. A specialized data set was used, which was generated ...
Shaft spillway with deflector downstream of vertical bend
(Thomas Telford Services Ltd, 2014)
This study considers the hydraulic design of a shaft spillway with a constriction at the upstream end of the vertical bend. The effect of key factors relating to the capacity of the crest, shaft and tunnel is assessed using ...
On the extension of the Erdös-Mordell type inequalities
(Mathematical Inequalities & Applications, 2014)
We discuss the extension of inequality R_A >= c/a * r_b + b/a * r_c to the plane of triangle ABC. Based on the obtained extension, in regard to all three vertices of the triangle, we get the extension of Erdos-Mordell ...
Managing rail service life
(Croatian Metallurgical Society, 2014)
The service life Of tails depends especially on the operational loads and speeds on the railway lines; as well as on the rail maintenance policy. There are multiple aspects of rail maintenance optimization. The following ...