Human resource performance measurement framework for construction projects and companies
(Faculty of Mechanical Engineering in Slavonski Brod, Faculty of Electrical Engineering in Osijek, Faculty of Civil Engineering in Osijek, 2014)
A new approach for measuring the performance of employees in construction companies is presented. Two different methods are proposed. For employees directly engaged on a project, performance is measured by using different ...
Application of semi-Markov decision process in bridge management
(International Association for Bridge and Structural Engineering (IABSE), 2015)
The state-of-the-art Bridge Management Systems (BMSs) feature tightly coupled deterioration and preservation optimization model that enable determining the most cost-effective maintenance strategies at both the project and ...
Vulnerability Assessment of Bridges Exposed to Scour
(Transportation Research Record, 2013)
To improve the allocation of funds for the maintenance and risk mitigation of transportation infrastructure, there is a dire need for a simplified, yet sufficiently accurate, methodology to estimate bridge vulnerability ...
Methods of calculating depreciation expenses of construction machinery / Metode proračuna troškova depresijacija građevinskih mašina
(Institut za istraživanja i projektovanja u privredi, Beograd, 2012)
Depreciation expenses represent a significant part of total expenses of construction machinery. Precise calculation of depreciation expenses is often difficult or impossible. Straight line method of depreciation, which is ...
Current strategy for highway construction in the Republic of Serbia / Aktuelna strategija realizacije izgradnje autoputeva u Republici Srbiji
(Društvo građevinskih konstruktera, Beograd, 2014)
In order to achieve the economic development of the Republic of Serbia, it is necessary to provide adequate traffic infrastructure, particularly highways. The second lane on the northern branch of Corridor X (E-75) from ...
Application of Fuzzy Logic on Selection of Contractors for Construction of High Rise Buildings
(Institute of Physics Publishing, 2019)
Selection process of a construction contractor is highly important and successful implementation of a project and realization of sustainability are largely dependent on it. Computer programs - expert systems - may be used ...
Ex post analysis of road projects: resilience to crisis
(Editorial Board EJTIR, 2018)
This investigation aimed to reveal a mechanism of how different road projects' settings respond to macro-economic crisis. Qualitative and quantitative analyses were performed over a sample of 31 European road projects, in ...
Tehnologija građevinskih radova
(Građevinski fakultet u Beogradu, 2015)
Genetic algorithms for assigning tasks to construction machine operators / Genetski algoritmi za rasporedivanje rukovatelja gradevinskih strojeva
(Croatian Association of Civil Engineers, 2011)
The authors describe the methodology for using genetic algorithms in solving problems of optimum assignment of tasks to construction machinery operators, aimed at achieving maximum efficiency. A special emphasis is placed ...
ODŠTETNI ZAHTEVI NA GRAĐEVINSKIM PROJEKTIMA – KVANTIFIKACIJA I PREVENCIJA / CLAIMS ON CONSTRUCTION PROJECTS – QUANTIFICATION AND PREVENTION
(Contemporary Construction Practice 2018, 2018)
Odštetni zahtevi predstavljaju veoma značajnu temu zato što njihova novčana vrednost može biti vrlo velika dok kvantifikacija nije egzaktna i kreće se u praksi u rasponu 1:3 u zavisnosti od primenjenih metoda koje su redom ...