Work cycle based scheduling
Апстракт
The paper proposes a new approach to short-term scheduling based on spatial and technological cycles, continuous crew flows and daily scheduling, named WCBS (Work Cycle Based Scheduling). Application of WCBS is shown on a case study of constructing seven multi-storey structures. It was concluded that WCBS helps overcome restrictions of existing approaches to micro scheduling (daily tasks and crew coordination), enhances the scheduling process and increases productivity of works.
Кључне речи:
short-term schedules / workflow / work cycle / productivityИзвор:
Građevinar, 2013, 65, 11, 993-1002Издавач:
- Croatian Association of Civil Engineers
DOI: 10.14256/JCE.845.2013
ISSN: 0350-2465
WoS: 000329019300003
Scopus: 2-s2.0-84891813484
Колекције
Институција/група
GraFarTY - JOUR AU - Marinković, Dejan AU - Stojadinović, Zoran AU - Ivanišević, Nenad PY - 2013 UR - https://grafar.grf.bg.ac.rs/handle/123456789/540 AB - The paper proposes a new approach to short-term scheduling based on spatial and technological cycles, continuous crew flows and daily scheduling, named WCBS (Work Cycle Based Scheduling). Application of WCBS is shown on a case study of constructing seven multi-storey structures. It was concluded that WCBS helps overcome restrictions of existing approaches to micro scheduling (daily tasks and crew coordination), enhances the scheduling process and increases productivity of works. PB - Croatian Association of Civil Engineers T2 - Građevinar T1 - Work cycle based scheduling EP - 1002 IS - 11 SP - 993 VL - 65 DO - 10.14256/JCE.845.2013 ER -
@article{ author = "Marinković, Dejan and Stojadinović, Zoran and Ivanišević, Nenad", year = "2013", abstract = "The paper proposes a new approach to short-term scheduling based on spatial and technological cycles, continuous crew flows and daily scheduling, named WCBS (Work Cycle Based Scheduling). Application of WCBS is shown on a case study of constructing seven multi-storey structures. It was concluded that WCBS helps overcome restrictions of existing approaches to micro scheduling (daily tasks and crew coordination), enhances the scheduling process and increases productivity of works.", publisher = "Croatian Association of Civil Engineers", journal = "Građevinar", title = "Work cycle based scheduling", pages = "1002-993", number = "11", volume = "65", doi = "10.14256/JCE.845.2013" }
Marinković, D., Stojadinović, Z.,& Ivanišević, N.. (2013). Work cycle based scheduling. in Građevinar Croatian Association of Civil Engineers., 65(11), 993-1002. https://doi.org/10.14256/JCE.845.2013
Marinković D, Stojadinović Z, Ivanišević N. Work cycle based scheduling. in Građevinar. 2013;65(11):993-1002. doi:10.14256/JCE.845.2013 .
Marinković, Dejan, Stojadinović, Zoran, Ivanišević, Nenad, "Work cycle based scheduling" in Građevinar, 65, no. 11 (2013):993-1002, https://doi.org/10.14256/JCE.845.2013 . .