Prikaz osnovnih podataka o dokumentu
Revitalization of "Zvornik" Hydropower Plamt
Rekonstrukcija sifona u hidroelektrani „Zvornik“
dc.creator | Kuzmanović, Vladan | |
dc.creator | Koković, Veljko | |
dc.creator | Spremić, Milan | |
dc.date.accessioned | 2019-04-30T13:23:12Z | |
dc.date.available | 2019-04-30T13:23:12Z | |
dc.date.issued | 2016 | |
dc.identifier.isbn | 978-86-7892-839-0 | |
dc.identifier.uri | https://grafar.grf.bg.ac.rs/handle/123456789/1460 | |
dc.description.abstract | Sixty years after the construction of HPP Zvornik, revitalization of the agregate A1 began. An increase in the installed capacity is provided by the water flow rate rise and the replacement of turbine generators. To make this possible, it is necessary to modify the geometry of the tube cone below the unit. Civil engineering part of the reconstruction works includes: dismantling of the existing steel tube cone lining, removal of the surrounding secondary concrete, assembling the new steel draft tube cone and connecting it with the existing dam concrete structure. | en |
dc.publisher | Društvo građevinskih konstruktera Srbije, Beograd | |
dc.rights | openAccess | |
dc.rights.uri | https://creativecommons.org/licenses/by-nc-nd/4.0/ | |
dc.source | Zbornik radova / Društvо građevinskih konstruktera Srbije, Simpozijum 2016, 15-17. septembar, Zlatibor | en |
dc.title | Revitalization of "Zvornik" Hydropower Plamt | en |
dc.title | Rekonstrukcija sifona u hidroelektrani „Zvornik“ | sr |
dc.type | conferenceObject | |
dc.rights.license | BY-NC-ND | |
dc.citation.epage | 990 | |
dc.citation.other | : 983-990 | |
dc.citation.spage | 983 | |
dc.identifier.rcub | https://hdl.handle.net/21.15107/rcub_grafar_1460 | |
dc.type.version | publishedVersion |
Dokumenti
Datoteke | Veličina | Format | Pregled |
---|---|---|---|
Uz ovaj zapis nema datoteka. |