Специфични проблеми код челичних конструкција ветропаркова
Apstrakt
Today, wind power is second largest available renewable resource of energy, after sun and before geothermal and hidrologic energy resources. According to data from 2008. for expected bulding of wind farms with capacity 27 GW it is required to pay 1,35 million euro per MW. The construction of steel tower is about 15-20% of total investment so construction of wind farms is great opportunity for development of civil engineering industry. The aim of this paper is to introduce civil engineers with the specific problems of design of steel towers for wind turbines.
Ključne reči:
wind farms / steel structures / joints / buckling / fatigueIzvor:
8. међународни научни скуп Савремена теорија и пракса у градитељству. 26-28 април 2012. Бања Лука, 2012, 273-288Kolekcije
Institucija/grupa
GraFarTY - CONF AU - Marković, Zlatko AU - Фриц, Ненад AU - Добрић, Јелена PY - 2012 UR - https://grafar.grf.bg.ac.rs/handle/123456789/1954 AB - Today, wind power is second largest available renewable resource of energy, after sun and before geothermal and hidrologic energy resources. According to data from 2008. for expected bulding of wind farms with capacity 27 GW it is required to pay 1,35 million euro per MW. The construction of steel tower is about 15-20% of total investment so construction of wind farms is great opportunity for development of civil engineering industry. The aim of this paper is to introduce civil engineers with the specific problems of design of steel towers for wind turbines. C3 - 8. међународни научни скуп Савремена теорија и пракса у градитељству. 26-28 април 2012. Бања Лука T1 - Специфични проблеми код челичних конструкција ветропаркова EP - 288 SP - 273 UR - https://hdl.handle.net/21.15107/rcub_grafar_1954 ER -
@conference{ author = "Marković, Zlatko and Фриц, Ненад and Добрић, Јелена", year = "2012", abstract = "Today, wind power is second largest available renewable resource of energy, after sun and before geothermal and hidrologic energy resources. According to data from 2008. for expected bulding of wind farms with capacity 27 GW it is required to pay 1,35 million euro per MW. The construction of steel tower is about 15-20% of total investment so construction of wind farms is great opportunity for development of civil engineering industry. The aim of this paper is to introduce civil engineers with the specific problems of design of steel towers for wind turbines.", journal = "8. међународни научни скуп Савремена теорија и пракса у градитељству. 26-28 април 2012. Бања Лука", title = "Специфични проблеми код челичних конструкција ветропаркова", pages = "288-273", url = "https://hdl.handle.net/21.15107/rcub_grafar_1954" }
Marković, Z., Фриц, Н.,& Добрић, Ј.. (2012). Специфични проблеми код челичних конструкција ветропаркова. in 8. међународни научни скуп Савремена теорија и пракса у градитељству. 26-28 април 2012. Бања Лука, 273-288. https://hdl.handle.net/21.15107/rcub_grafar_1954
Marković Z, Фриц Н, Добрић Ј. Специфични проблеми код челичних конструкција ветропаркова. in 8. међународни научни скуп Савремена теорија и пракса у градитељству. 26-28 април 2012. Бања Лука. 2012;:273-288. https://hdl.handle.net/21.15107/rcub_grafar_1954 .
Marković, Zlatko, Фриц, Ненад, Добрић, Јелена, "Специфични проблеми код челичних конструкција ветропаркова" in 8. међународни научни скуп Савремена теорија и пракса у градитељству. 26-28 април 2012. Бања Лука (2012):273-288, https://hdl.handle.net/21.15107/rcub_grafar_1954 .