Претраживање
Приказ резултата 1-2 од 2
Introduction of rain gauges into monitoring of sewer systems: Experiences in choosing, testing and installing the measuring equipment / Uvođenje kišomera u sistem praćenja rada kanalizacionog sistema - iskustva iz faze nabavke, provere i postavljanja
(Udruženje za tehnologiju vode i sanitarno inžinjerstvo, Beograd, 2005)
Improvement of the Belgrade sewer system performance, necessitated by increasing urbanization, calls for more precise assessment of water balance in the system. In this respect, three rain gauge stations are established ...
The Belgrade waste water system during severe rainfall / Beogradski kanalizacioni sistem u uslovima ekstremnih padavina
(Udruženje za tehnologiju vode i sanitarno inžinjerstvo, Beograd, 2009)
The Belgrade waste water system started being built more than 100 years ago. It is getting larger in accordance to urban development aimed at collecting most of waste water including rainfall runoff and communal and ...