Претраживање
Приказ резултата 11-15 од 15
Upotreba 3D štampača i savremenih materijala u građevinarstvu
(Građevinski kalendar, 2018)
Tehnički uslovi za prijem radova na koloseku
(Građevinski kalendar, 2016)
Railway systems and the noise protection of the urban environment / Šinski sistemi i zaštita urbanog okruženja od buke
(Naučno-stručno društvo za zaštitu životne sredine Srbije - Ecologica, Beograd, 2011)
This paper defines special requirements which railway track superstructure must fulfill in order to protect the urban environment from noise and vibrations. Possibilities of using ballasted and ballastless superstructure ...
Model development for the preliminary cost estimates of road rehabilitation and reconstruction works / Procena troškova rehabilitacije i rekonstrukcije u sistemima za upravljanje održavanjem puteva
(Srpsko društvo za puteve VIA-VITA, Beograd, 2012)
The average unit project cost for road rehabilitation and reconstruction (RRR) works vary substantially across countries and over time, but variation also exists within the country in the same year due to a number of ...
Connection between superstructure and substructure concrete bridges with aspect seismic isolation of construction / Veza donjeg i gornjeg stroja betonskih mostova sa aspekta seizmičke izolacije konstrukcije
(Građevinski fakultet, Subotica, 2017)
This paper presents the basic principles seismic isolation of concrete bridgesusing different types connections between superstructure and substructure of construction.In the particular case of the bridge over river Dičina ...