Претраживање
Приказ резултата 31-40 од 129
Ground improvement - mixed in place (MIP) technique
(Macedonian Association of Structural Engineers, Skopje, 2015)
Application of geosyntetics in the function of environmental protection
(Zbornik radova 5. međunarodne konferencije Savremena dostignuća u građevinarstvu 2017, 2017)
The processes of industrialization and urbanization, apart from positively reflecting on the overall progress of a society, also have the increase of communal waste as a consequence. At the same time, these processes ...
Application of modified fuzzy TOPSIS method for multicriteria decisions in civil engineering / Primena modifikovanog rasplinutog TOPSIS metoda za višekriterijumske odluke u građevinarstvu
(Društvo za ispitivanje i istraživanje materijala i konstrukcija Srbije, Beograd, 2014)
In this paper is presented and applied one fuzzy TOPSIS method for the multicriteria ranking of objects for reconstruction and maintenance. At the beginning is given short review on the genesis and development of this ...
Estimation of thermal impulse response of a multi-layer building wall through in-situ experimental measurements in a dynamic regime with applications
(Elsevier Ltd, 2018)
The dynamic thermal characteristics of the components of a building have a primary influence on the energy performance of the building's envelope under real environmental conditions. In this study, a novel approach for ...
Management of bridges with shallow foundations exposed to local scour
(Taylor and Francis Ltd., 2018)
The Serbian road network includes a large portion of bridges with shallow foundations vulnerable to local scour as tragically demonstrated during the extreme flooding in May 2014. Currently, the bridge management procedures ...
Kvalitativna analiza rizika sa mogućim uticajem na finansijsku, ekonomsku, društvenu i ekološku održivost projekta studija slučaja izgradnje autoputa E-80, Niš-Dimitrovgrad
(Srpsko društvo za puteve ''Via-Vita'', Beograd, 2016)
Previous research shows that, despite the importance of large infrastructure projects, their implementation is often unsuccessful, both in terms of failure to meet the traditional project success criteria (cost, time, ...
Information systems in construction industry / Informacioni sistemi u građevinarstvu
(Savez građevinskih inženjera Srbije, Beograd, 2014)
Information system for planning and control of project realization in construction industry is analyzed in the paper. Application of information technology in the construction industry is emphasized at the beginning of ...
Implementation of value engineering on residential projects / Primena vrednosnog inženjerstva na projektima izgradnje stambeno-poslovnih objekata
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2015)
For the purpose of further affirmation of value engineering (VE), this paper gives a contribution in developing procedures for the practical application of VE on residential projects. In accordance with the theoretical ...
Landslide assessment of the Starca basin (Croatia) using machine learning algorithms
(Acta Geotechnica Slovenica, 2011)
In this research, machine learning algorithms were compared in a landslide-susceptibility assessment. Given the input set of GIS layers for the Starca Basin, which included geological, hydrogeological, morphometric, and ...
Assessment of indirect costs due to highway link severance caused by reduction of bridge functional performance / Procena indirektnih troškova usled prekida putne veze zbog smanjenja funkcionalnih performansi mosta
(Srpsko društvo za puteve VIA-VITA, Beograd, 2014)
Stability and bearing capacity of the most important engineering structures of road sections (bridges, tunnels, viaducts, etc...) have enormous influence on the functional performance of the entire highway network. The ...