Search
Now showing items 21-30 of 136
Current Serbian design codes: Transferring from a deterministic to a semi- probabilistic approach / Trenutni srpski propisi za proračun - prelazak sa determinističkog na polu-probabilistički pristup
(Savez inženjera i tehničara Srbije, Beograd, 2015)
The Serbian design code for reinforced concrete structures is somewhat out-of-date in its approach to structural design. In this paper, a study into the possible transition to a semi-probabilistic approach is presented. ...
Application of modified fuzzy TOPSIS method for multicriteria decisions in civil engineering / Primena modifikovanog rasplinutog TOPSIS metoda za višekriterijumske odluke u građevinarstvu
(Društvo za ispitivanje i istraživanje materijala i konstrukcija Srbije, Beograd, 2014)
In this paper is presented and applied one fuzzy TOPSIS method for the multicriteria ranking of objects for reconstruction and maintenance. At the beginning is given short review on the genesis and development of this ...
Investment strategy for ensuring quality of finishing works on residential buildings
(Union of Croatian Civil Engineers and Technicians, 2015)
The relationship between the quality of finishing works, costs, market value, and profit, is presented and explained for residential buildings. The results show that the higher quality of finishing works increases profit ...
Ground improvement - mixed in place (MIP) technique
(Macedonian Association of Structural Engineers, Skopje, 2015)
Work cycle based scheduling
(Croatian Association of Civil Engineers, 2013)
The paper proposes a new approach to short-term scheduling based on spatial and technological cycles, continuous crew flows and daily scheduling, named WCBS (Work Cycle Based Scheduling). Application of WCBS is shown on a ...
BIM a tool not a principle
(Univerzitet u Beogradu - Arhitektonski fakultet, Beograd, 2015)
Application of fuzzy AHP for ranking and selection of alternatives in construction project management
(Taylor and Francis Ltd., 2017)
The construction project management (CPM) is very important and large segment of entire project management (PM). Realisation of construction projects is usually long term process which requests significant financial, ...
Building a Construction Project Key-Phrase Network from Unstructured Text Documents
(American Society of Civil Engineers (ASCE), 2017)
During a construction project lifecycle, an extensive corpus of unstructured or semistructured text documents is generated. The nature of unstructured sources impedes users' acquisition, analysis, and reuse of relevant ...
Uticaj konstruktivnog sistema na troškove i trajanje građenja stambenih objekata / The influence of superstructure type on cost and duration of residential projects
(Gradjevinar, 2019)
The aim of the research is to investigate the impact of the superstructure system type on cost and duration of residential projects, as well as the identification and quantification of the key parameters that affect them ...