Methodology of Design Organization Structure for Management Team at a Large Project
(Univerzitet Crne Gore, Građevinski fakultet, 2010)
The realization of large investment projects is an extremely complex undertaking both from technical and technological, as well as the organizational, legal and financial standpoint. Certainly that approach to the realization ...
Integrisani informacioni sistem za upravljanje građevinskim projektima / Integrated information system for construction project management
(Univerzitet Crne Gore Građevinski fakultet, 2016)
U ovome radu je prikazan model integrisanog informacionog sistema za planiranje i kontrolu realizacije građevinskog projekta. Za predloženi sistem je prikazan model podataka. Na osnovu izabranog modela podataka vrši se ...
Primena AHP metode višekriterijumske optimizacije za izbor krana na velikim investicionim projektima
(Univerzitet u Beogradu, Saobraćajni fakultet, 2020)
Izbor krana na velikim investicionim projektima predstavlja rizičnu aktivnost za postizanje osnovnih
ciljeva projeka. Kao posledica lošeg izbora krana mogu se javiti kašnjenja zbog loše organizacije, kao i prekoračenje ...
Critical risks in Serbian infrastructure projects
(Proceedings of 11th International Conference: "Organization, Technology and Management in Construction", September 2013, Dubrovnik, Croatia, 2013)
Infrastructure projects are usually followed by numerous standard, but also specific risks associated with project cost, schedule, quality, performance, health and safety aspects, environmental aspects, as well as with ...
Experimental determination of dynamic parameters of heat passage through the facade wall of a weekend cottage on mountain Kopaonik, Serbia
(Faculty of civil engineering and architecture / University of Niš and Serbian academy of sciences and arts - branch in Niš, 2023)
In this paper, using a dynamic RC model for heat transfer in a room on the ground floor,
the three-time constants of heat transfer that corresponds to the different parts of a
weekend cottage on Kopaonik were determined. ...
The Impact of the Daily Temperatures Variation on Dynamic Parameters of Thermal Envelope / Uticaj perioda dnevnih varijacija temperatura na dinamičke parametre termičkog omotača zgrade
(Univerzitet Crne Gore, Građevinski fakultet, Podgorica, 2016)
Digitalna obrada četrdesetogodišnjih srednjih dnevnih temperatura u Beogradu
(Savremena dostignuća u građevinarstvu, 2016)
Estimation of temperature transfer function in facade wall heat transport / Određivanje transfer funkcije temperature pri prolasku toplote kroz fasadni zid
(Građevinski fakultet, Subotica, 2017)
Urban Energy Mapping: Best Practices and Perspectives of Implementation and Application in Serbia
(The University of Niš, Faculty of Mechanical Engineering, Department of Thermal Engineering and Society of Thermal Engineers of Serbia, 2022)
Method in planning construction machinery replacement
(Građevinski fakultet u Subotici, 2018)
One basic criteria for determining the replacement time of construction
machinery is based on the age , that is, the increase in operating costs of the machine
with time. The key factor which determines and justifies ...