Претраживање
Приказ резултата 21-28 од 28
An integrated solution for increased circularity in buidlings. A methodological framework
(15th International conference organization, technology and management in construction (OTMC), 21—24 September, 2022, Dubrovnik, Croatia, 2022)
Linking BrIM to BMS for bridges – concepts
(IABSE, 2023)
Bridge Information Model (BrIM) is currently replacing drawings as main deliverable in new bridge project.
Several use cases for BrIM over its lifetime is identified, as well as a discussion of the use case potential. ...
The first municipal solid waste incinerator project in Southeast Europe
(4th International Conference on Sustainable Solid Waste Management, 23—25 June, 2016 Limassol, Cyprus, 2016)
Purpose
The City of Belgrade, the capital of Serbia, is in the project preparation phase for a publicprivate
partnership (PPP) project for the provision of services of treatment and disposal of
residual municipal solid ...
Multicriteria optimizing of construction equipment selection by AHP method
(Hrvatska udruga za organizaciju građenja, 2011)
Construction equipment is a key resource in the realization of construction projects.
Correct and careful planning in the usage of construction equipment plays a vital role in the
economic success of every construction ...
A digital solution for unlocking the urban mining potential of the residential building stock through the integration of BIM and GIS
(Conference on interdisciplinary and transdisciplinary research for sustainable development, 2022)
The construction industry consumes up to half of the excavated primary resources and
generates one-third of total waste annually, impacting the environment and society. To
reduce this impact, maintaining the primary ...
Geometry as a common ground for BMS and BIM
(IABSE Symposium, Prague 2022: Challenges for Existing and Oncoming Structures, 2022)
Bridge Management Systems (BMSs) are sophisticated software tools, widely used for managing bridges. Comprising a centralized database of all relevant information for the entire bridge stock and analytics to forecast ...
2010 Kraljevo Earthquake Recovery Process Metrics Derived from Recorded Reconstruction Data
(16th European Conference on Earthquake Engineering, 2018)
Earthquake resilience starts with a sudden drop of performance when an earthquake strikes followed by a relatively long recovery phase. The dynamics and volume of investment directly affect the rate and level of recovery. ...
Compensating the lack of big data in construction industry with expert knowledge: a case study
(1st Serbian International Conference on Applied Artificial Intelligence (SICAAI) Kragujevac, Serbia, May 19-20, 2022, 2022)
Due to various reasons, there is a lack of big data in the construction industry, one of the main obstacles to a broader implementation of AI. Another obstacle is adhering to analytical methods in fields more suitable for ...