Search
Now showing items 1-10 of 141
Heritage Building Information Modeling (HBIM) of the Katholikon of the Studenica Monastery / Digitalno modelovanje objekata kulturnog nasleđa - HBIM na primeru manastira Studenice
(University of Belgrade - Faculty of Architecture, 2022)
Studenica Monastery is the Serbian medieval monument of highest architectural and cultural value, also enlisted on the UNESCO World Heritage Site. This paper presents the role of architectural knowledge and sophisticated ...
AI in Agriculture
(1st Serbian International Conference on Applied Artificial Intelligence (SICAAI), Kragujevac, Serbia, 2022)
Soil organic carbon represents the main nutrient source for crop yields, which is of great importance to agricultural production. This research investigates the usage of a transfer learning-based neural network model to ...
Review of the method for extension of time on project with a case study
(14th International Scientific Conference “iNDiS 2018”, Novi Sad, November 21-23, 2018, 2018)
Tokom realiazacije projekta česta su kašnjenja od strane svih učesnika na projektu. Analiza kašnjenja ima za cilj ne samo kvantifikaciju ukupnog kašnjenja na projektu, već i determinaciju i raspodelu uticaja svakog od ...
Post-projektna analiza – studija slučaja za linijski infrastrukturni objekat
(Šesti međunarodni naučno-stručni simpozijum Instalacije i arhitektura, Beograd, 10. decembar 2015., 2015)
Post-projektnu analizu čine sve aktivnosti čiji je cilj sagledavanje parametara kako je objekat izveden, uključujući i to u kojoj meri on ispunjava projektovane zahteve, kao i to u kom stepenu su sami korisnici zadovoljni ...
Primena metode za analizu kašnjenja na projektu sa studijom slučaja
(15. kongres Društva građevinskih konstruktera Srbije, Zlatibor, 6-8. 9. 2018, 2018)
Vreme za izvođenje radova je parametar koji je od suštinskog značaja i za izvođača i za investitora. Za vlasnika projekta to je izgubljeni profit koji proizilazi iz nemogućnosti eksploatacije objekta u planiranom roku, dok ...
The impact of architectural conceptual design on profit / Značaj arhitektonskog koncepta za rentabilnost projekata
(Građevinski fakultet, Subotica, 2014)
Application of unstructured text based features in prediction of real estate prices: A comparative study
(2nd Serbian International Conference on Applied Artificial Intelligence (SICAAI) Kragujevac, Serbia, May 19-20, 2023, 2023)
This study demonstrates the potential of application of unstructured textual data for predicting
real estate prices and compares different protocols for extracting features from textual data.
Performance of the different ...
Primena BIM-a u upravljanju projektima - kako boljim projektovanjem smanjiti probleme u izvođenju
(Konferencija - 16. kongres DGKS 2022, 28 - 30. 9, Aranđelovac, 2022)
Uspešno upravljanje projektima podrazumeva maksimalno ostvarenje ciljeva projekta uz minimalne probleme u realizaciji. Preduslov za prvo je kreativni a za drugo tehnički kvalitet projektovanja. U radu je predstavljen model ...
Upravljanje procesom izbora ugovorne strategije u građevinarstvu uz promenu teorije fazi (rasplinutih) skupova / Management of Construction Contract Strategy Selection by Applying the Theory of Fuzzy Sets
(2007)
Cilj doktorske disertacije je da se ukaže na značaj izbora ugovome strategy e za
uspešnu realizaciju investicionih projekata i da se predloži postupak za izbor
odgovarajuée strategie primenom fazi logike i fazi ekspertnih ...
Highway Construction Cost Estimation: Identification and Analysis of the Owners’ Perceptions on Cost Drivers
(Department of Civil Engineering and Geodesy, Faculty of Technical Sciences, University of Novi Sad, 2023)
Highway construction cost estimates in the early stages of the project can be characterized as quite challenging and risky. Determination of the cost drivers on which the cost estimates are based requires a certain effort ...