Assessment of indirect costs due to highway link severance caused by reduction of bridge functional performance / Procena indirektnih troškova usled prekida putne veze zbog smanjenja funkcionalnih performansi mosta
(Srpsko društvo za puteve VIA-VITA, Beograd, 2014)
Stability and bearing capacity of the most important engineering structures of road sections (bridges, tunnels, viaducts, etc...) have enormous influence on the functional performance of the entire highway network. The ...
Moisture content influence on thermal conductivity of concrete / Uticaj sadržaja vlage na koeficijent toplotne provodnosti betona
(Građevinski fakultet Subotica, Subotica, 2016)
In this paper, physical processes of adsorption and transport of humidity, which has dominant influence on the physical and thermal characteristics of concrete, has been described. The impact of structure of concrete ...
Application of particle swarms for project time-cost optimization
(Union of Croatian Civil Engineers and Technicians, 2014)
The time-cost optimization of a construction project, as related to the costs of its activities and the total project realization costs, is considered in this paper. Direct and indirect costs, durations of all activities, ...
Planiranje održavanja putnih mostova
(Beograd, 2014)
Global Perception of Sustainable Construction Project Risks
(Selected Papers From the 27th Ipma (International Project Management Association), 2014)
Sustainability goals move projects away from narrowly focused traditional management oriented ambitions of time, cost and quality, giving attention to economic, environmental and social impacts of construction projects. ...
Određivanje in-situ koeficijenta trenja i imperfekcije kablova za prednaprezanje / Determination of the in situ coefficient of friction and imperfection of prestressing cables
(Građevinski materijali i konstrukcije, 2017)
Prestressing structural elements allows an increase in the spans of reinforced concrete structures. In the design and dimensioning of prestressed reinforced concrete structures it is necessary to know, that is to adopt a ...
Metodologija za proračun troškova neuposlene mehanizacije u okviru odštetnih zahteva
(Društvo građevinskih konstruktera Srbije, Beograd, 2016)
Productivity planning and control on construction projects / Planiranje i kontrola produktivnosti na građevinskim projektima
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2015)
In this paper, traditional as well as contemporary approaches to productivity planning and control are analyzed and potential improvements are suggested. A new approach is proposed. It is based on: applying separate measures ...
Optimalna politika održavanja drumskih mostova u Srbiji
(Put i saobraćaj, 2015)
Work cycle based scheduling
(Croatian Association of Civil Engineers, 2013)
The paper proposes a new approach to short-term scheduling based on spatial and technological cycles, continuous crew flows and daily scheduling, named WCBS (Work Cycle Based Scheduling). Application of WCBS is shown on a ...