Приказ резултата 1-10 од 42
Assessment of indirect costs due to highway link severance caused by reduction of bridge functional performance / Procena indirektnih troškova usled prekida putne veze zbog smanjenja funkcionalnih performansi mosta
(Srpsko društvo za puteve VIA-VITA, Beograd, 2014)
Stability and bearing capacity of the most important engineering structures of road sections (bridges, tunnels, viaducts, etc...) have enormous influence on the functional performance of the entire highway network. The ...
Application of particle swarms for project time-cost optimization
(Union of Croatian Civil Engineers and Technicians, 2014)
The time-cost optimization of a construction project, as related to the costs of its activities and the total project realization costs, is considered in this paper. Direct and indirect costs, durations of all activities, ...
Computational design and analysis of tensegrity structures
(Serbian architectural journal, 2018)
The paper presents the application of computational tools in design and analysis of integrally tensioned (tensegrity) structures. The shaping process of this specific type of spatial structures is determined by consideration ...
Određivanje in-situ koeficijenta trenja i imperfekcije kablova za prednaprezanje / Determination of the in situ coefficient of friction and imperfection of prestressing cables
(Građevinski materijali i konstrukcije, 2017)
Prestressing structural elements allows an increase in the spans of reinforced concrete structures. In the design and dimensioning of prestressed reinforced concrete structures it is necessary to know, that is to adopt a ...
Productivity planning and control on construction projects / Planiranje i kontrola produktivnosti na građevinskim projektima
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2015)
In this paper, traditional as well as contemporary approaches to productivity planning and control are analyzed and potential improvements are suggested. A new approach is proposed. It is based on: applying separate measures ...
Optimalna politika održavanja drumskih mostova u Srbiji
(Put i saobraćaj, 2015)
Work cycle based scheduling
(Croatian Association of Civil Engineers, 2013)
The paper proposes a new approach to short-term scheduling based on spatial and technological cycles, continuous crew flows and daily scheduling, named WCBS (Work Cycle Based Scheduling). Application of WCBS is shown on a ...
An approach and software for analysis of financial and economic risks in feasibility study preparation / Pristup i računarski program za analizu finansijskih i ekonomskih rizika pri izradi studije opravdanosti
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2013)
Risk is defined as an uncertain event or a condition that, if occurs, could affect project goals. In recent literature the importance of studying uncertainty is underlined, especially in early project phases. In this paper, ...
Estimation of thermal impulse response of a multi-layer building wall through in-situ experimental measurements in a dynamic regime with applications
(Elsevier Ltd, 2018)
The dynamic thermal characteristics of the components of a building have a primary influence on the energy performance of the building's envelope under real environmental conditions. In this study, a novel approach for ...
Information systems in construction industry / Informacioni sistemi u građevinarstvu
(Savez građevinskih inženjera Srbije, Beograd, 2014)
Information system for planning and control of project realization in construction industry is analyzed in the paper. Application of information technology in the construction industry is emphasized at the beginning of ...