Претраживање
Приказ резултата 1-10 од 70
Assessment of indirect costs due to highway link severance caused by reduction of bridge functional performance / Procena indirektnih troškova usled prekida putne veze zbog smanjenja funkcionalnih performansi mosta
(Srpsko društvo za puteve VIA-VITA, Beograd, 2014)
Stability and bearing capacity of the most important engineering structures of road sections (bridges, tunnels, viaducts, etc...) have enormous influence on the functional performance of the entire highway network. The ...
Bridge damage: Detection, IFC-based semantic enrichment and visualization
(Elsevier, 2020)
Building Information Modeling (BIM) representations of bridges enriched by inspection data will add tremendous value to future Bridge Management Systems (BMSs). This paper presents an approach for point cloud-based detection ...
Application of particle swarms for project time-cost optimization
(Union of Croatian Civil Engineers and Technicians, 2014)
The time-cost optimization of a construction project, as related to the costs of its activities and the total project realization costs, is considered in this paper. Direct and indirect costs, durations of all activities, ...
Computational design and analysis of tensegrity structures
(Serbian architectural journal, 2018)
The paper presents the application of computational tools in design and analysis of integrally tensioned (tensegrity) structures. The shaping process of this specific type of spatial structures is determined by consideration ...
Određivanje in-situ koeficijenta trenja i imperfekcije kablova za prednaprezanje / Determination of the in situ coefficient of friction and imperfection of prestressing cables
(Građevinski materijali i konstrukcije, 2017)
Prestressing structural elements allows an increase in the spans of reinforced concrete structures. In the design and dimensioning of prestressed reinforced concrete structures it is necessary to know, that is to adopt a ...
Providing answers to questions from automatically collected web pages for intelligent decision making in the construction sector
(Journal of Computing in Civil Engineering, 2008)
The construction sector is notorious for the dichotomy between (a) its intensive use of information in its decision-making processes and (b) its limited access to, and insufficient use of, the pertinent information that ...
Productivity planning and control on construction projects / Planiranje i kontrola produktivnosti na građevinskim projektima
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2015)
In this paper, traditional as well as contemporary approaches to productivity planning and control are analyzed and potential improvements are suggested. A new approach is proposed. It is based on: applying separate measures ...
Optimalna politika održavanja drumskih mostova u Srbiji
(Put i saobraćaj, 2015)
Work cycle based scheduling
(Croatian Association of Civil Engineers, 2013)
The paper proposes a new approach to short-term scheduling based on spatial and technological cycles, continuous crew flows and daily scheduling, named WCBS (Work Cycle Based Scheduling). Application of WCBS is shown on a ...
The Extension of IFC For Supporting 3D Cadastre LADM Geometry
(MDPI, 2021)
The growth of densely populated urban areas has caused traditional cadastral registration systems to face many difficulties in representing complex and multilevel property situations on 2D maps. These challenges, combined ...