Motorway Horgos Novi Sad (second phase) Serbia
(London ; New York: Routledge, 2017)
Productivity planning and control on construction projects / Planiranje i kontrola produktivnosti na građevinskim projektima
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2015)
In this paper, traditional as well as contemporary approaches to productivity planning and control are analyzed and potential improvements are suggested. A new approach is proposed. It is based on: applying separate measures ...
Optimalna politika održavanja drumskih mostova u Srbiji
(Put i saobraćaj, 2015)
Work cycle based scheduling
(Croatian Association of Civil Engineers, 2013)
The paper proposes a new approach to short-term scheduling based on spatial and technological cycles, continuous crew flows and daily scheduling, named WCBS (Work Cycle Based Scheduling). Application of WCBS is shown on a ...
BIM a tool not a principle
(Univerzitet u Beogradu - Arhitektonski fakultet, Beograd, 2015)
The Extension of IFC For Supporting 3D Cadastre LADM Geometry
(MDPI, 2021)
The growth of densely populated urban areas has caused traditional cadastral registration systems to face many difficulties in representing complex and multilevel property situations on 2D maps. These challenges, combined ...
An approach and software for analysis of financial and economic risks in feasibility study preparation / Pristup i računarski program za analizu finansijskih i ekonomskih rizika pri izradi studije opravdanosti
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2013)
Risk is defined as an uncertain event or a condition that, if occurs, could affect project goals. In recent literature the importance of studying uncertainty is underlined, especially in early project phases. In this paper, ...
Estimation of thermal impulse response of a multi-layer building wall through in-situ experimental measurements in a dynamic regime with applications
(Elsevier Ltd, 2018)
The dynamic thermal characteristics of the components of a building have a primary influence on the energy performance of the building's envelope under real environmental conditions. In this study, a novel approach for ...
Kvalitativna analiza rizika sa mogućim uticajem na finansijsku, ekonomsku, društvenu i ekološku održivost projekta studija slučaja izgradnje autoputa E-80, Niš-Dimitrovgrad
(Srpsko društvo za puteve ''Via-Vita'', Beograd, 2016)
Previous research shows that, despite the importance of large infrastructure projects, their implementation is often unsuccessful, both in terms of failure to meet the traditional project success criteria (cost, time, ...
Information systems in construction industry / Informacioni sistemi u građevinarstvu
(Savez građevinskih inženjera Srbije, Beograd, 2014)
Information system for planning and control of project realization in construction industry is analyzed in the paper. Application of information technology in the construction industry is emphasized at the beginning of ...