Pretraživanje
Prikaz rezultata 191-197 od 197
Primena AHP metode višekriterijumske optimizacije za izbor krana na velikim investicionim projektima
(Univerzitet u Beogradu, Saobraćajni fakultet, 2020)
Izbor krana na velikim investicionim projektima predstavlja rizičnu aktivnost za postizanje osnovnih
ciljeva projeka. Kao posledica lošeg izbora krana mogu se javiti kašnjenja zbog loše organizacije, kao i prekoračenje ...
Critical risks in Serbian infrastructure projects
(Proceedings of 11th International Conference: "Organization, Technology and Management in Construction", September 2013, Dubrovnik, Croatia, 2013)
Infrastructure projects are usually followed by numerous standard, but also specific risks associated with project cost, schedule, quality, performance, health and safety aspects, environmental aspects, as well as with ...
Experimental determination of dynamic parameters of heat passage through the facade wall of a weekend cottage on mountain Kopaonik, Serbia
(Faculty of civil engineering and architecture / University of Niš and Serbian academy of sciences and arts - branch in Niš, 2023)
In this paper, using a dynamic RC model for heat transfer in a room on the ground floor,
the three-time constants of heat transfer that corresponds to the different parts of a
weekend cottage on Kopaonik were determined. ...
Multicriteria optimizing of construction equipment selection by AHP method
(Hrvatska udruga za organizaciju građenja, 2011)
Construction equipment is a key resource in the realization of construction projects.
Correct and careful planning in the usage of construction equipment plays a vital role in the
economic success of every construction ...
The Impact of the Daily Temperatures Variation on Dynamic Parameters of Thermal Envelope / Uticaj perioda dnevnih varijacija temperatura na dinamičke parametre termičkog omotača zgrade
(Univerzitet Crne Gore, Građevinski fakultet, Podgorica, 2016)
Integrisani informacioni sistem za upravljanje građevinskim projektima / Integrated information system for construction project management
(Univerzitet Crne Gore Građevinski fakultet, 2016)
U ovome radu je prikazan model integrisanog informacionog sistema za planiranje i kontrolu realizacije građevinskog projekta. Za predloženi sistem je prikazan model podataka. Na osnovu izabranog modela podataka vrši se ...
Detection and In-Depth Analysis of Causes of Delay in Construction Projects: Synergy between Machine Learning and Expert Knowledge
(Sustainability, 2022)
Due to numerous reasons, construction projects often fail to achieve the planned duration. Detecting causes of delays (CoD) is the first step in eliminating or mitigating potential delays in future projects. The goal of ...