Radić, Zorana

Link to this page

Authority KeyName Variants
9051b204-b911-4a11-acf5-19eb83d865a2
  • Radić, Zorana (3)
Projects
No records found.

Author's Bibliography

Primeri troškova sanacije klizišta na putevima

Radić, Zoran; Đurić, Uroš; Radić, Zorana

(Beograd: Srpsko društvo za puteve "Via Vita", 2018)

TY  - CONF
AU  - Radić, Zoran
AU  - Đurić, Uroš
AU  - Radić, Zorana
PY  - 2018
UR  - https://grafar.grf.bg.ac.rs/handle/123456789/1891
AB  - Pri sanaciji klizišta, pojave koja je veoma česta na putevima Srbije, brojne su nepoznanice kod procene
troškova radova predviđenih za njihovu stabilizaciju. Veoma su važni uticajni činioci većeg broja promenljivih (kojima se
opisuju svojstva terena i dimenzije kliznog tela) na cenu konstrukcije pri saniranju klizišta. Takođe, građevinski zahvati
koji se izvode u cilju poboljšanja stabilnosti padina su dosta raznovrsni, što uz različite uzroke pojave klizišta i njihove
elemente, ima za posledicu široke raspone utrošenih sredstava po sanaciji. Kako je apsolutno neophodno stabilizovati
ugrožene saobraćajnice ili druge objekte na nestabilnim terenima, veoma je važno, svakako i za našu državu, racionalno
korišćenje sredstava koja se opravdano izdvajaju u tu svrhu.
AB  - Landslides are frequent natural hazard occurrence on the road network in Serbia. During their stabilization,
there are usually uncertainties regarding stabilization work price evaluation. Conditioning factors of numerous variables
(that are describing the terrain properties and landslides dimensions) which are affecting the final price of stabilization
are of great importance. Also, construction works that are usually performed for the purpose of slope stabilization are
various, and when they are combined with different landslide triggering factors and their elements - as a consequence
we have a significant discrepancy of funds that are spent for stabilization. Since absolute stabilization of landslides that
are occurring across infrastructure and other objects on unstable slopes is necessary, it is very important for each
country and Serbia as well to rationalize the use of budget funds that are allocated for that purpose.
PB  - Beograd: Srpsko društvo za puteve "Via Vita"
C3  - Zbornik radova, Treći srpski kongres o putevima
T1  - Primeri troškova sanacije klizišta na putevima
T1  - Examples of landslide stabilization costs on the road infrastructure
EP  - 285
SP  - 279
UR  - https://hdl.handle.net/21.15107/rcub_grafar_1891
ER  - 
@conference{
author = "Radić, Zoran and Đurić, Uroš and Radić, Zorana",
year = "2018",
abstract = "Pri sanaciji klizišta, pojave koja je veoma česta na putevima Srbije, brojne su nepoznanice kod procene
troškova radova predviđenih za njihovu stabilizaciju. Veoma su važni uticajni činioci većeg broja promenljivih (kojima se
opisuju svojstva terena i dimenzije kliznog tela) na cenu konstrukcije pri saniranju klizišta. Takođe, građevinski zahvati
koji se izvode u cilju poboljšanja stabilnosti padina su dosta raznovrsni, što uz različite uzroke pojave klizišta i njihove
elemente, ima za posledicu široke raspone utrošenih sredstava po sanaciji. Kako je apsolutno neophodno stabilizovati
ugrožene saobraćajnice ili druge objekte na nestabilnim terenima, veoma je važno, svakako i za našu državu, racionalno
korišćenje sredstava koja se opravdano izdvajaju u tu svrhu., Landslides are frequent natural hazard occurrence on the road network in Serbia. During their stabilization,
there are usually uncertainties regarding stabilization work price evaluation. Conditioning factors of numerous variables
(that are describing the terrain properties and landslides dimensions) which are affecting the final price of stabilization
are of great importance. Also, construction works that are usually performed for the purpose of slope stabilization are
various, and when they are combined with different landslide triggering factors and their elements - as a consequence
we have a significant discrepancy of funds that are spent for stabilization. Since absolute stabilization of landslides that
are occurring across infrastructure and other objects on unstable slopes is necessary, it is very important for each
country and Serbia as well to rationalize the use of budget funds that are allocated for that purpose.",
publisher = "Beograd: Srpsko društvo za puteve "Via Vita"",
journal = "Zbornik radova, Treći srpski kongres o putevima",
title = "Primeri troškova sanacije klizišta na putevima, Examples of landslide stabilization costs on the road infrastructure",
pages = "285-279",
url = "https://hdl.handle.net/21.15107/rcub_grafar_1891"
}
Radić, Z., Đurić, U.,& Radić, Z.. (2018). Primeri troškova sanacije klizišta na putevima. in Zbornik radova, Treći srpski kongres o putevima
Beograd: Srpsko društvo za puteve "Via Vita"., 279-285.
https://hdl.handle.net/21.15107/rcub_grafar_1891
Radić Z, Đurić U, Radić Z. Primeri troškova sanacije klizišta na putevima. in Zbornik radova, Treći srpski kongres o putevima. 2018;:279-285.
https://hdl.handle.net/21.15107/rcub_grafar_1891 .
Radić, Zoran, Đurić, Uroš, Radić, Zorana, "Primeri troškova sanacije klizišta na putevima" in Zbornik radova, Treći srpski kongres o putevima (2018):279-285,
https://hdl.handle.net/21.15107/rcub_grafar_1891 .

Sanacija klizišta na putevima Srbije sredstvima iz Fonda solidarnosti EU i budžeta Republike Srbije

Radić, Zoran; Radić, Zorana; Đurić, Uroš

(2017)

TY  - JOUR
AU  - Radić, Zoran
AU  - Radić, Zorana
AU  - Đurić, Uroš
PY  - 2017
UR  - https://grafar.grf.bg.ac.rs/handle/123456789/1089
T2  - Put i saobraćaj
T1  - Sanacija klizišta na putevima Srbije sredstvima iz Fonda solidarnosti EU i budžeta Republike Srbije
EP  - 20
IS  - 3
SP  - 13
VL  - 63
UR  - https://hdl.handle.net/21.15107/rcub_grafar_1089
ER  - 
@article{
author = "Radić, Zoran and Radić, Zorana and Đurić, Uroš",
year = "2017",
journal = "Put i saobraćaj",
title = "Sanacija klizišta na putevima Srbije sredstvima iz Fonda solidarnosti EU i budžeta Republike Srbije",
pages = "20-13",
number = "3",
volume = "63",
url = "https://hdl.handle.net/21.15107/rcub_grafar_1089"
}
Radić, Z., Radić, Z.,& Đurić, U.. (2017). Sanacija klizišta na putevima Srbije sredstvima iz Fonda solidarnosti EU i budžeta Republike Srbije. in Put i saobraćaj, 63(3), 13-20.
https://hdl.handle.net/21.15107/rcub_grafar_1089
Radić Z, Radić Z, Đurić U. Sanacija klizišta na putevima Srbije sredstvima iz Fonda solidarnosti EU i budžeta Republike Srbije. in Put i saobraćaj. 2017;63(3):13-20.
https://hdl.handle.net/21.15107/rcub_grafar_1089 .
Radić, Zoran, Radić, Zorana, Đurić, Uroš, "Sanacija klizišta na putevima Srbije sredstvima iz Fonda solidarnosti EU i budžeta Republike Srbije" in Put i saobraćaj, 63, no. 3 (2017):13-20,
https://hdl.handle.net/21.15107/rcub_grafar_1089 .

Implementation of projects related to landslide repair in Serbia in 2016

Radić, Zoran; Radić, Zorana

(Društvo geoloških inženjera i tehničara Srbije; Komitet za Inženjersku geologiju i Geotehniku, Beograd, 2016)

TY  - CONF
AU  - Radić, Zoran
AU  - Radić, Zorana
PY  - 2016
UR  - https://grafar.grf.bg.ac.rs/handle/123456789/1384
AB  - After activation of numerous landslides in Serbia in the spring of 2006 and especially after the floods in May 2014, as well as after occurrences of new and reactivation of older landslides, there was an evident need for the national authorities to choose the systematic approach. This enabled, along with providing financial resources and after finalising project proposals, the start of the implementation of various engineering works on remediation of landslides across Serbia and especially in urbanised areas and where transport infrastructure was at the highest risk. The current dynamics of the implementation of projects related to landslide remediation, implemented through The Public Investment Management Office is presented in this paper. The endeavor of the state is evident to use financial support received from international community for the purpose of water damage recovery after the floods in May 2014 in a most possible effective and useful way, with the entire process completely transparent. Through Serbian Government's Public Investment Management Office (former Office for Flood Affected Areas Assistance and Rehabilitation) the implementation of remediation of over thirty landslides in different areas in Serbia is in its final phase. More precise data on the degree of implementation of the works on stabilisation of the terrain and prices of construction works are presented in this paper in detail, concerning that the data is being updated almost daily. Some of the landslides were repaired during the spring; for some supplementary project documentation had been develope; for all landslides tendering procedures were implemented in order to select the contractor with the most favorable offer. For projects and conduction of remedial works (mostly related to slope stabilization in zones of transport routes) financial resources were obtained through EU Solidarity Fund. Remedial works at the location of all the included landslides have to be finished by the middle of September 2016. Dozens of experts in the field of engineering geology and geotechnical engineering from the entire country participated in the development of necessary geotechnical basis for the appropriate design of remediation measures. Directly under the UNOPS-ROADS project within the next year, around 30 more landslides of different sizes, activated on the roads of Serbia will be repaired.
PB  - Društvo geoloških inženjera i tehničara Srbije; Komitet za Inženjersku geologiju i Geotehniku, Beograd
C3  - Zbornik radova XV simpozijuma iz inženjerske geologije i geotehnike, Beograd, 22-23.09.2016. = Proceedings of the XV Symposium on Engineering Geology and Geotechnics, Belgrade
T1  - Implementation of projects related to landslide repair in Serbia in 2016
T1  - Realizacija projekata sanacije klizišta u Srbiji u 2016. g.
EP  - 96
SP  - 85
UR  - https://hdl.handle.net/21.15107/rcub_grafar_1384
ER  - 
@conference{
author = "Radić, Zoran and Radić, Zorana",
year = "2016",
abstract = "After activation of numerous landslides in Serbia in the spring of 2006 and especially after the floods in May 2014, as well as after occurrences of new and reactivation of older landslides, there was an evident need for the national authorities to choose the systematic approach. This enabled, along with providing financial resources and after finalising project proposals, the start of the implementation of various engineering works on remediation of landslides across Serbia and especially in urbanised areas and where transport infrastructure was at the highest risk. The current dynamics of the implementation of projects related to landslide remediation, implemented through The Public Investment Management Office is presented in this paper. The endeavor of the state is evident to use financial support received from international community for the purpose of water damage recovery after the floods in May 2014 in a most possible effective and useful way, with the entire process completely transparent. Through Serbian Government's Public Investment Management Office (former Office for Flood Affected Areas Assistance and Rehabilitation) the implementation of remediation of over thirty landslides in different areas in Serbia is in its final phase. More precise data on the degree of implementation of the works on stabilisation of the terrain and prices of construction works are presented in this paper in detail, concerning that the data is being updated almost daily. Some of the landslides were repaired during the spring; for some supplementary project documentation had been develope; for all landslides tendering procedures were implemented in order to select the contractor with the most favorable offer. For projects and conduction of remedial works (mostly related to slope stabilization in zones of transport routes) financial resources were obtained through EU Solidarity Fund. Remedial works at the location of all the included landslides have to be finished by the middle of September 2016. Dozens of experts in the field of engineering geology and geotechnical engineering from the entire country participated in the development of necessary geotechnical basis for the appropriate design of remediation measures. Directly under the UNOPS-ROADS project within the next year, around 30 more landslides of different sizes, activated on the roads of Serbia will be repaired.",
publisher = "Društvo geoloških inženjera i tehničara Srbije; Komitet za Inženjersku geologiju i Geotehniku, Beograd",
journal = "Zbornik radova XV simpozijuma iz inženjerske geologije i geotehnike, Beograd, 22-23.09.2016. = Proceedings of the XV Symposium on Engineering Geology and Geotechnics, Belgrade",
title = "Implementation of projects related to landslide repair in Serbia in 2016, Realizacija projekata sanacije klizišta u Srbiji u 2016. g.",
pages = "96-85",
url = "https://hdl.handle.net/21.15107/rcub_grafar_1384"
}
Radić, Z.,& Radić, Z.. (2016). Implementation of projects related to landslide repair in Serbia in 2016. in Zbornik radova XV simpozijuma iz inženjerske geologije i geotehnike, Beograd, 22-23.09.2016. = Proceedings of the XV Symposium on Engineering Geology and Geotechnics, Belgrade
Društvo geoloških inženjera i tehničara Srbije; Komitet za Inženjersku geologiju i Geotehniku, Beograd., 85-96.
https://hdl.handle.net/21.15107/rcub_grafar_1384
Radić Z, Radić Z. Implementation of projects related to landslide repair in Serbia in 2016. in Zbornik radova XV simpozijuma iz inženjerske geologije i geotehnike, Beograd, 22-23.09.2016. = Proceedings of the XV Symposium on Engineering Geology and Geotechnics, Belgrade. 2016;:85-96.
https://hdl.handle.net/21.15107/rcub_grafar_1384 .
Radić, Zoran, Radić, Zorana, "Implementation of projects related to landslide repair in Serbia in 2016" in Zbornik radova XV simpozijuma iz inženjerske geologije i geotehnike, Beograd, 22-23.09.2016. = Proceedings of the XV Symposium on Engineering Geology and Geotechnics, Belgrade (2016):85-96,
https://hdl.handle.net/21.15107/rcub_grafar_1384 .