Ivković, Branislav

Link to this page

Authority KeyName Variants
687bd793-ef80-43d3-90d7-1aaddd535e52
  • Ivković, Branislav (2)
Projects

Author's Bibliography

Project Risk Management and BIM Application in Serbia – Survey Results

Mikić, Miljan; Petojević, Zorana; Ivanišević, Nenad; Ivković, Branislav

(University of Belgrade, Faculty of Architecture, 2012)

TY  - CONF
AU  - Mikić, Miljan
AU  - Petojević, Zorana
AU  - Ivanišević, Nenad
AU  - Ivković, Branislav
PY  - 2012
UR  - https://grafar.grf.bg.ac.rs/handle/123456789/2994
AB  - Although risk towards construction project success may occur in any of project life cycle phase, it is most important for risks to be analyzed and assessed in project development process, where Building Information Modelling (BIM) could improve Project Risk Management (PRM). Risks, if not timely identified, treated and controlled cause that project actual performance significantly varies from planned values. This paper presents results of an still ongoing infrastructure construction project risks survey for projects settled in Serbia. The survey includes: Analysis of usage, necessity and problems with construction PRM practice and BIM practice in Serbia.
PB  - University of Belgrade, Faculty of Architecture
C3  - Proceedings of the International Congress: "Installation and architecture", November 2012, Belgrade
T1  - Project Risk Management and BIM Application in Serbia – Survey Results
EP  - 123
UR  - https://hdl.handle.net/21.15107/rcub_grafar_2994
ER  - 
@conference{
author = "Mikić, Miljan and Petojević, Zorana and Ivanišević, Nenad and Ivković, Branislav",
year = "2012",
abstract = "Although risk towards construction project success may occur in any of project life cycle phase, it is most important for risks to be analyzed and assessed in project development process, where Building Information Modelling (BIM) could improve Project Risk Management (PRM). Risks, if not timely identified, treated and controlled cause that project actual performance significantly varies from planned values. This paper presents results of an still ongoing infrastructure construction project risks survey for projects settled in Serbia. The survey includes: Analysis of usage, necessity and problems with construction PRM practice and BIM practice in Serbia.",
publisher = "University of Belgrade, Faculty of Architecture",
journal = "Proceedings of the International Congress: "Installation and architecture", November 2012, Belgrade",
title = "Project Risk Management and BIM Application in Serbia – Survey Results",
pages = "123",
url = "https://hdl.handle.net/21.15107/rcub_grafar_2994"
}
Mikić, M., Petojević, Z., Ivanišević, N.,& Ivković, B.. (2012). Project Risk Management and BIM Application in Serbia – Survey Results. in Proceedings of the International Congress: "Installation and architecture", November 2012, Belgrade
University of Belgrade, Faculty of Architecture..
https://hdl.handle.net/21.15107/rcub_grafar_2994
Mikić M, Petojević Z, Ivanišević N, Ivković B. Project Risk Management and BIM Application in Serbia – Survey Results. in Proceedings of the International Congress: "Installation and architecture", November 2012, Belgrade. 2012;:null-123.
https://hdl.handle.net/21.15107/rcub_grafar_2994 .
Mikić, Miljan, Petojević, Zorana, Ivanišević, Nenad, Ivković, Branislav, "Project Risk Management and BIM Application in Serbia – Survey Results" in Proceedings of the International Congress: "Installation and architecture", November 2012, Belgrade (2012),
https://hdl.handle.net/21.15107/rcub_grafar_2994 .

Methodology of Design Organization Structure for Management Team at a Large Project

Ivković, Branislav; Jovanović, Zorana; Mikić, Miljan

(Univerzitet Crne Gore, Građevinski fakultet, 2010)

TY  - CONF
AU  - Ivković, Branislav
AU  - Jovanović, Zorana
AU  - Mikić, Miljan
PY  - 2010
UR  - https://grafar.grf.bg.ac.rs/handle/123456789/2993
AB  - The realization of large investment projects is an extremely complex undertaking both from technical and technological, as well as the organizational, legal and financial standpoint. Certainly that approach to the realization of such a project depends on a position which the participant has in it, whether the client or general contractor. Of course, other participants such as designers, supervisions etc. have their own specific approach. In any position, that is a participant in the project, for him it is of utmost importance to define the organizational structure of the team that will manage the project from his point of view. In this paper it is analyzed the approach to the formation of General contractor organizational structure for the realization of a large project.
PB  - Univerzitet Crne Gore, Građevinski fakultet
C3  - International Scientific Conference: Construction – Science and Practice, Žabljak, Montenegro, Februry 2010.
T1  - Methodology of Design Organization Structure for Management Team at a Large Project
EP  - 1720
UR  - https://hdl.handle.net/21.15107/rcub_grafar_2993
ER  - 
@conference{
author = "Ivković, Branislav and Jovanović, Zorana and Mikić, Miljan",
year = "2010",
abstract = "The realization of large investment projects is an extremely complex undertaking both from technical and technological, as well as the organizational, legal and financial standpoint. Certainly that approach to the realization of such a project depends on a position which the participant has in it, whether the client or general contractor. Of course, other participants such as designers, supervisions etc. have their own specific approach. In any position, that is a participant in the project, for him it is of utmost importance to define the organizational structure of the team that will manage the project from his point of view. In this paper it is analyzed the approach to the formation of General contractor organizational structure for the realization of a large project.",
publisher = "Univerzitet Crne Gore, Građevinski fakultet",
journal = "International Scientific Conference: Construction – Science and Practice, Žabljak, Montenegro, Februry 2010.",
title = "Methodology of Design Organization Structure for Management Team at a Large Project",
pages = "1720",
url = "https://hdl.handle.net/21.15107/rcub_grafar_2993"
}
Ivković, B., Jovanović, Z.,& Mikić, M.. (2010). Methodology of Design Organization Structure for Management Team at a Large Project. in International Scientific Conference: Construction – Science and Practice, Žabljak, Montenegro, Februry 2010.
Univerzitet Crne Gore, Građevinski fakultet..
https://hdl.handle.net/21.15107/rcub_grafar_2993
Ivković B, Jovanović Z, Mikić M. Methodology of Design Organization Structure for Management Team at a Large Project. in International Scientific Conference: Construction – Science and Practice, Žabljak, Montenegro, Februry 2010.. 2010;:null-1720.
https://hdl.handle.net/21.15107/rcub_grafar_2993 .
Ivković, Branislav, Jovanović, Zorana, Mikić, Miljan, "Methodology of Design Organization Structure for Management Team at a Large Project" in International Scientific Conference: Construction – Science and Practice, Žabljak, Montenegro, Februry 2010. (2010),
https://hdl.handle.net/21.15107/rcub_grafar_2993 .