Campos e Matos, Jose

Link to this page

Authority KeyName Variants
237ced2e-a3b9-4ad1-8274-bc8724ea60ab
  • Campos e Matos, Jose (1)
Projects

Author's Bibliography

Quality Control оf Roadway Bridges - Reliability Assessment

Tanasić, Nikola; Isailović, Dušan; Hajdin, Rade; Campos e Matos, Jose

(European Cooperation in Science & Technology (COST), 2018)

TY  - CONF
AU  - Tanasić, Nikola
AU  - Isailović, Dušan
AU  - Hajdin, Rade
AU  - Campos e Matos, Jose
PY  - 2018
UR  - https://grafar.grf.bg.ac.rs/handle/123456789/2167
AB  - The elaboration of adequate quality control plans is one of the crucial tasks in bridge management
today. This is the topic of the ongoing COST TU1406 action, where it is proposed to control quality focus by means of
key performance indicators. To this date, the qualitative methodology for the assessment of the indicators is suggested,
with a framework that can be upgraded to a full quantitative approach in future. The methodology is envisioned to
enhance current management practices, which predominantly rely on visual inspections, and use only the essential data
from bridge inventory and inspections for decision-making. The pivotal key performance indicator is suggested to be
reliability, the assessment of which is performed for likely bridge failure modes. Here, it is required to include the
impact of physical features (e.g. damages, symptoms) observed in inspections, especially those which may considerably
affect the reliability. The two approaches suggested within COST Working Group 3 report to assess the reliability and
the possibilities for their application in practice are presented in this paper.
PB  - European Cooperation in Science & Technology (COST)
C3  - TU1406 COST Action meeting eBook
T1  - Quality Control оf Roadway Bridges - Reliability Assessment
EP  - 331
SP  - 325
UR  - https://hdl.handle.net/21.15107/rcub_grafar_2167
ER  - 
@conference{
author = "Tanasić, Nikola and Isailović, Dušan and Hajdin, Rade and Campos e Matos, Jose",
year = "2018",
abstract = "The elaboration of adequate quality control plans is one of the crucial tasks in bridge management
today. This is the topic of the ongoing COST TU1406 action, where it is proposed to control quality focus by means of
key performance indicators. To this date, the qualitative methodology for the assessment of the indicators is suggested,
with a framework that can be upgraded to a full quantitative approach in future. The methodology is envisioned to
enhance current management practices, which predominantly rely on visual inspections, and use only the essential data
from bridge inventory and inspections for decision-making. The pivotal key performance indicator is suggested to be
reliability, the assessment of which is performed for likely bridge failure modes. Here, it is required to include the
impact of physical features (e.g. damages, symptoms) observed in inspections, especially those which may considerably
affect the reliability. The two approaches suggested within COST Working Group 3 report to assess the reliability and
the possibilities for their application in practice are presented in this paper.",
publisher = "European Cooperation in Science & Technology (COST)",
journal = "TU1406 COST Action meeting eBook",
title = "Quality Control оf Roadway Bridges - Reliability Assessment",
pages = "331-325",
url = "https://hdl.handle.net/21.15107/rcub_grafar_2167"
}
Tanasić, N., Isailović, D., Hajdin, R.,& Campos e Matos, J.. (2018). Quality Control оf Roadway Bridges - Reliability Assessment. in TU1406 COST Action meeting eBook
European Cooperation in Science & Technology (COST)., 325-331.
https://hdl.handle.net/21.15107/rcub_grafar_2167
Tanasić N, Isailović D, Hajdin R, Campos e Matos J. Quality Control оf Roadway Bridges - Reliability Assessment. in TU1406 COST Action meeting eBook. 2018;:325-331.
https://hdl.handle.net/21.15107/rcub_grafar_2167 .
Tanasić, Nikola, Isailović, Dušan, Hajdin, Rade, Campos e Matos, Jose, "Quality Control оf Roadway Bridges - Reliability Assessment" in TU1406 COST Action meeting eBook (2018):325-331,
https://hdl.handle.net/21.15107/rcub_grafar_2167 .