The importance of Daylight Savings Time for energy savings in Belgrade latitude and climate

Grujić, Marija D.; Knežević, Nikola

(2023)

TY  - CONF
AU  - Grujić, Marija D.
AU  - Knežević, Nikola
PY  - 2023
UR  - https://grafar.grf.bg.ac.rs/handle/123456789/3252
AB  - The idea of Daylight Saving Time (DST) was introduced before electrification era in order to prolong diurnal use of daylight during summer. DST has been imposed in European legislation since year 2000, but the legislation left open a back door for its suspension if the overall effect did not show positive results. During past decade it has been debated very often about effects of DST. Although many studies have concluded that DST has positive effect on energy savings in buildings in middle latitudes, there are still arguments that DST is causing loses in other areas of economy.  
Many literature surveys have concluded that positive effect of DST on energy consumption in buildings is very small and highly dependable on latitude. This paper investigates how the application of DST in Belgrade climate and latitude influences the change of energy demand in highly glazed office spaces. Office buildings are used for work mainly during daytime, so it might be assumed that the influence of clock shift during summer period has high potential for change in utilisation of environmental energy resources.
C3  - 8th International Academic Conference on Places and Technologies, Belgrade, Serbia, 19th to 21st October 2023
T1  - The importance of Daylight Savings Time for energy savings in Belgrade latitude and climate
UR  - https://hdl.handle.net/21.15107/rcub_grafar_3252
ER  - 
@conference{
author = "Grujić, Marija D. and Knežević, Nikola",
year = "2023",
abstract = "The idea of Daylight Saving Time (DST) was introduced before electrification era in order to prolong diurnal use of daylight during summer. DST has been imposed in European legislation since year 2000, but the legislation left open a back door for its suspension if the overall effect did not show positive results. During past decade it has been debated very often about effects of DST. Although many studies have concluded that DST has positive effect on energy savings in buildings in middle latitudes, there are still arguments that DST is causing loses in other areas of economy.  
Many literature surveys have concluded that positive effect of DST on energy consumption in buildings is very small and highly dependable on latitude. This paper investigates how the application of DST in Belgrade climate and latitude influences the change of energy demand in highly glazed office spaces. Office buildings are used for work mainly during daytime, so it might be assumed that the influence of clock shift during summer period has high potential for change in utilisation of environmental energy resources.",
journal = "8th International Academic Conference on Places and Technologies, Belgrade, Serbia, 19th to 21st October 2023",
title = "The importance of Daylight Savings Time for energy savings in Belgrade latitude and climate",
url = "https://hdl.handle.net/21.15107/rcub_grafar_3252"
}
Grujić, M. D.,& Knežević, N.. (2023). The importance of Daylight Savings Time for energy savings in Belgrade latitude and climate. in 8th International Academic Conference on Places and Technologies, Belgrade, Serbia, 19th to 21st October 2023.
https://hdl.handle.net/21.15107/rcub_grafar_3252
Grujić MD, Knežević N. The importance of Daylight Savings Time for energy savings in Belgrade latitude and climate. in 8th International Academic Conference on Places and Technologies, Belgrade, Serbia, 19th to 21st October 2023. 2023;.
https://hdl.handle.net/21.15107/rcub_grafar_3252 .
Grujić, Marija D., Knežević, Nikola, "The importance of Daylight Savings Time for energy savings in Belgrade latitude and climate" in 8th International Academic Conference on Places and Technologies, Belgrade, Serbia, 19th to 21st October 2023 (2023),
https://hdl.handle.net/21.15107/rcub_grafar_3252 .

BIM for effective project menagement during the execution phase

Knežević, Nikola; Grujić, Marija D.

(2023)

TY  - CONF
AU  - Knežević, Nikola
AU  - Grujić, Marija D.
PY  - 2023
UR  - https://grafar.grf.bg.ac.rs/handle/123456789/3251
AB  - Construction projects always involve a large number of participants, and managing a vast amount of information is necessary. Additionally, each project is unique, further complicating management challenges. Construction projects are exposed to a wide range of risks. These problems have been recognized, leading to the emergence of the need for new project management systems using information technology. The fundamental idea of Building Information Modeling (BIM) is to create a digital model of a building, which also serves as a centralized database to be used in all project lifecycle stages. This paper aims to present the achievements so far in the context of 4D and 5D BIM, demonstrating its capabilities through an example in the construction phase of a building.
C3  - 27th International project management congress “Interdisciplinarity as a key link of the project profession” Vrnjačka Banja, Serbia, June 8th-10th, 2023
T1  - BIM for effective project menagement during the execution phase
UR  - https://hdl.handle.net/21.15107/rcub_grafar_3251
ER  - 
@conference{
author = "Knežević, Nikola and Grujić, Marija D.",
year = "2023",
abstract = "Construction projects always involve a large number of participants, and managing a vast amount of information is necessary. Additionally, each project is unique, further complicating management challenges. Construction projects are exposed to a wide range of risks. These problems have been recognized, leading to the emergence of the need for new project management systems using information technology. The fundamental idea of Building Information Modeling (BIM) is to create a digital model of a building, which also serves as a centralized database to be used in all project lifecycle stages. This paper aims to present the achievements so far in the context of 4D and 5D BIM, demonstrating its capabilities through an example in the construction phase of a building.",
journal = "27th International project management congress “Interdisciplinarity as a key link of the project profession” Vrnjačka Banja, Serbia, June 8th-10th, 2023",
title = "BIM for effective project menagement during the execution phase",
url = "https://hdl.handle.net/21.15107/rcub_grafar_3251"
}
Knežević, N.,& Grujić, M. D.. (2023). BIM for effective project menagement during the execution phase. in 27th International project management congress “Interdisciplinarity as a key link of the project profession” Vrnjačka Banja, Serbia, June 8th-10th, 2023.
https://hdl.handle.net/21.15107/rcub_grafar_3251
Knežević N, Grujić MD. BIM for effective project menagement during the execution phase. in 27th International project management congress “Interdisciplinarity as a key link of the project profession” Vrnjačka Banja, Serbia, June 8th-10th, 2023. 2023;.
https://hdl.handle.net/21.15107/rcub_grafar_3251 .
Knežević, Nikola, Grujić, Marija D., "BIM for effective project menagement during the execution phase" in 27th International project management congress “Interdisciplinarity as a key link of the project profession” Vrnjačka Banja, Serbia, June 8th-10th, 2023 (2023),
https://hdl.handle.net/21.15107/rcub_grafar_3251 .