Computational Intelligence Techniques in Transportation and Communication Planning and Traffic Control

Link to this page

info:eu-repo/grantAgreement/MESTD/Technological Development (TD or TR)/36002/RS//

Computational Intelligence Techniques in Transportation and Communication Planning and Traffic Control (en)
Планирање и управљање саобраћајем и комуникацијама применом метода рачунарске интелигенције (sr)
Planiranje i upravljanje saobraćajem i komunikacijama primenom metoda računarske inteligencije (sr_RS)
Authors

Publications

Risk management in civil engineering

Mašović, Snežana; Pecić, Nenad; Stošić, Saša; Hajdin, Rade; Tanasić, Nikola

(Society for Materials and Structures Testing of Serbia Faculty of Civil Engineering, University of Belgrade, Serbia Association of Structural Engineers of Serbia, 2023)

TY  - JOUR
AU  - Mašović, Snežana
AU  - Pecić, Nenad
AU  - Stošić, Saša
AU  - Hajdin, Rade
AU  - Tanasić, Nikola
PY  - 2023
UR  - https://grafar.grf.bg.ac.rs/handle/123456789/3189
AB  - Risk is involved in the whole lifecycle of a structure: design, construction, utilization and demolition. There is a close connection between reliability and risk. Contemporary building codes introduce consideration of the reliability in structural design. Here, the concept of risk takes into account the level of consequences of a failure. Structural engineers, used to deterministic calculation procedures, are often unfamiliar with the uncertainties associated with risk analysis. An overview of the basic principles of risk management in civil engineering is presented in this paper.
PB  - Society for Materials and Structures Testing of Serbia Faculty of Civil Engineering, University of Belgrade, Serbia Association of Structural Engineers of Serbia
T2  - Građevinski materijali i konstrukcije/Building Materials and Structures
T1  - Risk management in civil engineering
EP  - 126
IS  - 2
SP  - 115
VL  - 66
UR  - https://hdl.handle.net/21.15107/rcub_grafar_3189
ER  - 
@article{
author = "Mašović, Snežana and Pecić, Nenad and Stošić, Saša and Hajdin, Rade and Tanasić, Nikola",
year = "2023",
abstract = "Risk is involved in the whole lifecycle of a structure: design, construction, utilization and demolition. There is a close connection between reliability and risk. Contemporary building codes introduce consideration of the reliability in structural design. Here, the concept of risk takes into account the level of consequences of a failure. Structural engineers, used to deterministic calculation procedures, are often unfamiliar with the uncertainties associated with risk analysis. An overview of the basic principles of risk management in civil engineering is presented in this paper.",
publisher = "Society for Materials and Structures Testing of Serbia Faculty of Civil Engineering, University of Belgrade, Serbia Association of Structural Engineers of Serbia",
journal = "Građevinski materijali i konstrukcije/Building Materials and Structures",
title = "Risk management in civil engineering",
pages = "126-115",
number = "2",
volume = "66",
url = "https://hdl.handle.net/21.15107/rcub_grafar_3189"
}
Mašović, S., Pecić, N., Stošić, S., Hajdin, R.,& Tanasić, N.. (2023). Risk management in civil engineering. in Građevinski materijali i konstrukcije/Building Materials and Structures
Society for Materials and Structures Testing of Serbia Faculty of Civil Engineering, University of Belgrade, Serbia Association of Structural Engineers of Serbia., 66(2), 115-126.
https://hdl.handle.net/21.15107/rcub_grafar_3189
Mašović S, Pecić N, Stošić S, Hajdin R, Tanasić N. Risk management in civil engineering. in Građevinski materijali i konstrukcije/Building Materials and Structures. 2023;66(2):115-126.
https://hdl.handle.net/21.15107/rcub_grafar_3189 .
Mašović, Snežana, Pecić, Nenad, Stošić, Saša, Hajdin, Rade, Tanasić, Nikola, "Risk management in civil engineering" in Građevinski materijali i konstrukcije/Building Materials and Structures, 66, no. 2 (2023):115-126,
https://hdl.handle.net/21.15107/rcub_grafar_3189 .

Novo tehničko rešenje baze podataka o mostovima u Republici Srbiji

Mašović, Snežana; Borislav, Lazić; Hajdin, Rade; Nikola, Tanasić

(2020)

TY  - JOUR
AU  - Mašović, Snežana
AU  - Borislav, Lazić
AU  - Hajdin, Rade
AU  - Nikola, Tanasić
PY  - 2020
UR  - https://grafar.grf.bg.ac.rs/handle/123456789/2224
AB  - Radi   efikasnog   održavanja   mostova,   u   svetu   su   razvijeni   sistemi održavanja   mostova(Bridge   management   system –BMS). U   cilju unapređenja i daljeg razvoja, JP Putevi Srbije su inicirali projekat pod nazivom: Ažuriranje  metodologije  za  pregled  i vrednovanje  stanja mostova  i  izrada  novih  aplikacija  za  upravljanje  bazom  podataka  o mostovima. U  radu  je  prikazano  novo  tehničko  rešenje  baze  podataka  o mostovima, na osnovu koga je uspostavljena i nova aplikacija.
AB  - For    efficient    bridge    maintenance,    bridge management    systems    (BMS)    have    been    developed worldwide. In order to improve and further develop, PE Roads of  Serbia  has  initiated  a  project  entitled:  Updating  the methodology  for  reviewing  and  evaluating  the  condition  of bridges  and  developing  new  applications  for  managing  the database  of  bridges.  The  paper  presents  a  new  technical solution for the database on bridges, based on whicha new application was established.
T2  - Put i saobracaj
T1  - Novo tehničko rešenje baze podataka o mostovima u Republici Srbiji
EP  - 34
IS  - 4
SP  - 19
VL  - 66
DO  - 10.31075/PIS.66.04.03
ER  - 
@article{
author = "Mašović, Snežana and Borislav, Lazić and Hajdin, Rade and Nikola, Tanasić",
year = "2020",
abstract = "Radi   efikasnog   održavanja   mostova,   u   svetu   su   razvijeni   sistemi održavanja   mostova(Bridge   management   system –BMS). U   cilju unapređenja i daljeg razvoja, JP Putevi Srbije su inicirali projekat pod nazivom: Ažuriranje  metodologije  za  pregled  i vrednovanje  stanja mostova  i  izrada  novih  aplikacija  za  upravljanje  bazom  podataka  o mostovima. U  radu  je  prikazano  novo  tehničko  rešenje  baze  podataka  o mostovima, na osnovu koga je uspostavljena i nova aplikacija., For    efficient    bridge    maintenance,    bridge management    systems    (BMS)    have    been    developed worldwide. In order to improve and further develop, PE Roads of  Serbia  has  initiated  a  project  entitled:  Updating  the methodology  for  reviewing  and  evaluating  the  condition  of bridges  and  developing  new  applications  for  managing  the database  of  bridges.  The  paper  presents  a  new  technical solution for the database on bridges, based on whicha new application was established.",
journal = "Put i saobracaj",
title = "Novo tehničko rešenje baze podataka o mostovima u Republici Srbiji",
pages = "34-19",
number = "4",
volume = "66",
doi = "10.31075/PIS.66.04.03"
}
Mašović, S., Borislav, L., Hajdin, R.,& Nikola, T.. (2020). Novo tehničko rešenje baze podataka o mostovima u Republici Srbiji. in Put i saobracaj, 66(4), 19-34.
https://doi.org/10.31075/PIS.66.04.03
Mašović S, Borislav L, Hajdin R, Nikola T. Novo tehničko rešenje baze podataka o mostovima u Republici Srbiji. in Put i saobracaj. 2020;66(4):19-34.
doi:10.31075/PIS.66.04.03 .
Mašović, Snežana, Borislav, Lazić, Hajdin, Rade, Nikola, Tanasić, "Novo tehničko rešenje baze podataka o mostovima u Republici Srbiji" in Put i saobracaj, 66, no. 4 (2020):19-34,
https://doi.org/10.31075/PIS.66.04.03 . .

Analitička metoda za kontrolu prohodnosti i proračun elemenata situacionog plana površinskih raskrsnica

Ilić, Vladan

(Универзитет у Београду, Грађевински факултет, 2019-07-10)

TY  - THES
AU  - Ilić, Vladan
PY  - 2019-07-10
UR  - https://nardus.mpn.gov.rs/handle/123456789/11893
UR  - http://eteze.bg.ac.rs/application/showtheses?thesesId=7235
UR  - https://fedorabg.bg.ac.rs/fedora/get/o:20975/bdef:Content/download
UR  - http://vbs.rs/scripts/cobiss?command=DISPLAY&base=70036&RID=
UR  - https://grafar.grf.bg.ac.rs/handle/123456789/2754
AB  - Osnovni motiv za izradu ove disertacije je potreba za većim stepenom automatizacije procesa projektovanja situacionog plana površinskih raskrsnica kroz eliminaciju iterativnog procesa ponavljanja nekoliko serija simulacija kretanja merodavnog vozila prilikom analiza prohodnosti. Disertacija je podeljena na tri dela.U prvom delu određene su realne trajektorije povlačenja vozila pomoću GNSS RTK kinematičke metode diferencijalnog pozicioniranja u realnom vremenu. Razvijena je originalna metodologija za precizno utvrđivanje niza položaja i orijentacija testnih vozila na osnovu GPS koordinata snimljenih tokom praćenja zadatih putanja na test poligonu. Predložena metodologija smanjuje greške pri snimanju trajektorija nastale usled zanemarivanja nivelacionih karakteristika kolovoza i nemogućnosti preciznog postavljanja GPS rovera u odnosu na zaobljene karoserije vozila.U drugom delu, razvijeni su matematički modeli za proračun položaja vozila sa jednim, dva i tri sloga koja prate vodeće kružne putanje, kao i nov analitički postupak za proračun položaja vozila u kome se dostiže maksimalni offtracking, odnosno, maksimalno odstupanje centra poslednje osovine vozila od vodeće putanje. Utvrđeno je da su trajektorije povlačenja vozila sračunate pomoću matematičkih modela na "strani sigurnosti" u odnosu na trajektorije iz opšteprihvaćene Halter-ove simulacije, koje su istovremeno na "strani sigurnosti" u odnosu na realne trajektorije povlačenja dobijene na osnovu eksperimentalnih merenja.U trećem delu, razvijen je softverski alat za pronalaženje optimalnih kombinacija geometrijskih parametara trocentričnih krivina koje najbolje aproksimiraju trajektorije povlačenja iz matematičkih modela. Najvažniji rezultat dobijen primenom razvijenog softverskog alata je nova geometrijska forma trocentrične krivine sa optimalnom kombinacijom geometrijskih parametara za aproksimaciju trajektorija povlačenja vozila.
AB  - The aim of this dissertation is to achieve a higher level of automation when developing crossroad plans. The immediate goal is to develop and improve methods for vehicle trajectories mathematical modeling, thus eliminating repetitive vehicle movement simulations.In its first part, a new method of recording vehicles' trajectories by using a real-time kinematic differential positioning technique was developed and presented. It was revealed that the existing methods of vehicle tracking based on Global Positioning System (GPS) technology are prone to errors. Not taking into account realistic pavement morphology (grading characteristics) while converting the raw data and inaccurate positioning of GPS receivers on modern streamlined vehicle bodies have been the major sources of errors. New methods of converting recorded trajectories into real-world coordinates overcame these deficiencies.In the second part, mathematical models for calculating the positions of one, two and three unit vehicles following circular steering paths were developed. In relation to existing mathematical models, accuracy has been improved and new methods for calculating maximum offtracking were developed. It was also demonstrated that all mathematically modeled vehicle movement trajectories were on the safe side in relation to the ones obtained from the widely accepted Halter's graphoanalitical method which were, in turn, on the safe side in relation to the experimentally recorded trajectories.In the third part, software for automatic retrieval of optimal 3-centered compound curves, producing minimal offsets on the safe side from the mathematically modeled trajectories, was developed. Unlike sophisticated formulas underpinning the modeling of vehicles' trajectories, optimal 3-centered compound curves are simple shapes, well suited for an average crossroad designer.
PB  - Универзитет у Београду, Грађевински факултет
T2  - Универзитет у Београду
T1  - Analitička metoda za kontrolu prohodnosti i proračun elemenata situacionog plana površinskih raskrsnica
UR  - https://hdl.handle.net/21.15107/rcub_nardus_11893
ER  - 
@phdthesis{
author = "Ilić, Vladan",
year = "2019-07-10",
abstract = "Osnovni motiv za izradu ove disertacije je potreba za većim stepenom automatizacije procesa projektovanja situacionog plana površinskih raskrsnica kroz eliminaciju iterativnog procesa ponavljanja nekoliko serija simulacija kretanja merodavnog vozila prilikom analiza prohodnosti. Disertacija je podeljena na tri dela.U prvom delu određene su realne trajektorije povlačenja vozila pomoću GNSS RTK kinematičke metode diferencijalnog pozicioniranja u realnom vremenu. Razvijena je originalna metodologija za precizno utvrđivanje niza položaja i orijentacija testnih vozila na osnovu GPS koordinata snimljenih tokom praćenja zadatih putanja na test poligonu. Predložena metodologija smanjuje greške pri snimanju trajektorija nastale usled zanemarivanja nivelacionih karakteristika kolovoza i nemogućnosti preciznog postavljanja GPS rovera u odnosu na zaobljene karoserije vozila.U drugom delu, razvijeni su matematički modeli za proračun položaja vozila sa jednim, dva i tri sloga koja prate vodeće kružne putanje, kao i nov analitički postupak za proračun položaja vozila u kome se dostiže maksimalni offtracking, odnosno, maksimalno odstupanje centra poslednje osovine vozila od vodeće putanje. Utvrđeno je da su trajektorije povlačenja vozila sračunate pomoću matematičkih modela na "strani sigurnosti" u odnosu na trajektorije iz opšteprihvaćene Halter-ove simulacije, koje su istovremeno na "strani sigurnosti" u odnosu na realne trajektorije povlačenja dobijene na osnovu eksperimentalnih merenja.U trećem delu, razvijen je softverski alat za pronalaženje optimalnih kombinacija geometrijskih parametara trocentričnih krivina koje najbolje aproksimiraju trajektorije povlačenja iz matematičkih modela. Najvažniji rezultat dobijen primenom razvijenog softverskog alata je nova geometrijska forma trocentrične krivine sa optimalnom kombinacijom geometrijskih parametara za aproksimaciju trajektorija povlačenja vozila., The aim of this dissertation is to achieve a higher level of automation when developing crossroad plans. The immediate goal is to develop and improve methods for vehicle trajectories mathematical modeling, thus eliminating repetitive vehicle movement simulations.In its first part, a new method of recording vehicles' trajectories by using a real-time kinematic differential positioning technique was developed and presented. It was revealed that the existing methods of vehicle tracking based on Global Positioning System (GPS) technology are prone to errors. Not taking into account realistic pavement morphology (grading characteristics) while converting the raw data and inaccurate positioning of GPS receivers on modern streamlined vehicle bodies have been the major sources of errors. New methods of converting recorded trajectories into real-world coordinates overcame these deficiencies.In the second part, mathematical models for calculating the positions of one, two and three unit vehicles following circular steering paths were developed. In relation to existing mathematical models, accuracy has been improved and new methods for calculating maximum offtracking were developed. It was also demonstrated that all mathematically modeled vehicle movement trajectories were on the safe side in relation to the ones obtained from the widely accepted Halter's graphoanalitical method which were, in turn, on the safe side in relation to the experimentally recorded trajectories.In the third part, software for automatic retrieval of optimal 3-centered compound curves, producing minimal offsets on the safe side from the mathematically modeled trajectories, was developed. Unlike sophisticated formulas underpinning the modeling of vehicles' trajectories, optimal 3-centered compound curves are simple shapes, well suited for an average crossroad designer.",
publisher = "Универзитет у Београду, Грађевински факултет",
journal = "Универзитет у Београду",
title = "Analitička metoda za kontrolu prohodnosti i proračun elemenata situacionog plana površinskih raskrsnica",
url = "https://hdl.handle.net/21.15107/rcub_nardus_11893"
}
Ilić, V.. (2019-07-10). Analitička metoda za kontrolu prohodnosti i proračun elemenata situacionog plana površinskih raskrsnica. in Универзитет у Београду
Универзитет у Београду, Грађевински факултет..
https://hdl.handle.net/21.15107/rcub_nardus_11893
Ilić V. Analitička metoda za kontrolu prohodnosti i proračun elemenata situacionog plana površinskih raskrsnica. in Универзитет у Београду. 2019;.
https://hdl.handle.net/21.15107/rcub_nardus_11893 .
Ilić, Vladan, "Analitička metoda za kontrolu prohodnosti i proračun elemenata situacionog plana površinskih raskrsnica" in Универзитет у Београду (2019-07-10),
https://hdl.handle.net/21.15107/rcub_nardus_11893 .

New pedagogical approaches in digital media - enhanced traffic safety training for children

Trifunović, Aleksandar; Čičević, Svetlana; Žunjić, Aleksandar; Mitrović, Slobodan; Dragović, Magdalena

(University of Niš, Faculty of Occupational Safety, 2018)

TY  - CONF
AU  - Trifunović, Aleksandar
AU  - Čičević, Svetlana
AU  - Žunjić, Aleksandar
AU  - Mitrović, Slobodan
AU  - Dragović, Magdalena
PY  - 2018
UR  - https://grafar.grf.bg.ac.rs/handle/123456789/3074
AB  - According to World Health Organization (WHO) estimates, 186,300 children die annually from road traffic crashes globally, equivalent to over 500 child deaths daily. Road traffic injuries are among the top four global causes of death in children between the ages of 5 and 14 years. Among these deaths, children as pedestrians accounted for about 38%. To create effective intervention programs, the research on pedestrian safety risks associated with age is needed. For these reasons, an experiment was conducted to explore the impact of using tablet PC devices for learning purposes in the field of traffic safety. The results indicate that children show better performances when working with tablet PC, than in simulated traffic situations. Thus, it is important to take these findings into account when aiming to train children for road safety.
PB  - University of Niš, Faculty of Occupational Safety
C3  - Proceedings of the 18th Int. Conf. of the series Man & Working Environment. 50 Years of Higher Education Science and Research of the Occupational Safety Engineering
T1  - New pedagogical approaches in digital media - enhanced traffic safety training for children
EP  - 196
SP  - 193
UR  - https://hdl.handle.net/21.15107/rcub_grafar_3074
ER  - 
@conference{
author = "Trifunović, Aleksandar and Čičević, Svetlana and Žunjić, Aleksandar and Mitrović, Slobodan and Dragović, Magdalena",
year = "2018",
abstract = "According to World Health Organization (WHO) estimates, 186,300 children die annually from road traffic crashes globally, equivalent to over 500 child deaths daily. Road traffic injuries are among the top four global causes of death in children between the ages of 5 and 14 years. Among these deaths, children as pedestrians accounted for about 38%. To create effective intervention programs, the research on pedestrian safety risks associated with age is needed. For these reasons, an experiment was conducted to explore the impact of using tablet PC devices for learning purposes in the field of traffic safety. The results indicate that children show better performances when working with tablet PC, than in simulated traffic situations. Thus, it is important to take these findings into account when aiming to train children for road safety.",
publisher = "University of Niš, Faculty of Occupational Safety",
journal = "Proceedings of the 18th Int. Conf. of the series Man & Working Environment. 50 Years of Higher Education Science and Research of the Occupational Safety Engineering",
title = "New pedagogical approaches in digital media - enhanced traffic safety training for children",
pages = "196-193",
url = "https://hdl.handle.net/21.15107/rcub_grafar_3074"
}
Trifunović, A., Čičević, S., Žunjić, A., Mitrović, S.,& Dragović, M.. (2018). New pedagogical approaches in digital media - enhanced traffic safety training for children. in Proceedings of the 18th Int. Conf. of the series Man & Working Environment. 50 Years of Higher Education Science and Research of the Occupational Safety Engineering
University of Niš, Faculty of Occupational Safety., 193-196.
https://hdl.handle.net/21.15107/rcub_grafar_3074
Trifunović A, Čičević S, Žunjić A, Mitrović S, Dragović M. New pedagogical approaches in digital media - enhanced traffic safety training for children. in Proceedings of the 18th Int. Conf. of the series Man & Working Environment. 50 Years of Higher Education Science and Research of the Occupational Safety Engineering. 2018;:193-196.
https://hdl.handle.net/21.15107/rcub_grafar_3074 .
Trifunović, Aleksandar, Čičević, Svetlana, Žunjić, Aleksandar, Mitrović, Slobodan, Dragović, Magdalena, "New pedagogical approaches in digital media - enhanced traffic safety training for children" in Proceedings of the 18th Int. Conf. of the series Man & Working Environment. 50 Years of Higher Education Science and Research of the Occupational Safety Engineering (2018):193-196,
https://hdl.handle.net/21.15107/rcub_grafar_3074 .

Vulnerability of reinforced concrete bridges to local scour in bridge management

Tanasić, Nikola S.

(Универзитет у Београду, Грађевински факултет, 2015-04-28)

TY  - THES
AU  - Tanasić, Nikola S.
PY  - 2015-04-28
UR  - https://nardus.mpn.gov.rs/handle/123456789/5955
UR  - http://eteze.bg.ac.rs/application/showtheses?thesesId=3344
UR  - https://fedorabg.bg.ac.rs/fedora/get/o:11816/bdef:Content/download
UR  - http://vbs.rs/scripts/cobiss?command=DISPLAY&base=70036&RID=513689234
UR  - https://grafar.grf.bg.ac.rs/handle/123456789/2734
AB  - The road infrastructure around the world is impaired by natural hazards, inparticular with extreme flooding, which sever the road links and lead to serioussocio-economic consequences. The bridges, which are the most critical parts of roadlinks, are threatened even by less extreme floods with high occurrence rates. The localscour at bridge substructures associated with floods is regarded as the predominantcause of hazard triggered failures. Although the management of bridges exposed toflooding is not a new topic and has been extensively elaborated in the last 20 years, thecurrent Bridge Management Systems still cannot account for sudden events such as thelocal scour. The current procedures, which usually rest on qualitative approaches andregular inspections, do not give satisfactory results in scheduling the appropriate riskreducing interventions. The evaluation of real-time risk changes associated to thishazard is deemed necessary.The topic of the thesis is to present the basis of the novel methodology forquantitative vulnerability assessment of reinforced concrete bridges with shallowfoundations exposed to local scour. Here, the accent is set on the estimation of theconditional probability of a bridge failure due to a scouring event, while the relatedconsequences are beyond the scope of the thesis. Based on the scour critical bridges inthe Serbian road network, the reinforced concrete bridge types which are considered inthe analysis have multiple span double-tee main girders on common pier-foundationsystems.In order to solve the multidisciplinary problem of local scour action at bridgepiers and associated failures, it was essential to develop a typical bridge model andframework with a modest data set for its simple yet accurate analysis. As the generalapproach to analyze possible failure modes and consequently obtain the probability ofbridge failure, the water-soil-bridge interaction is suggested. In addition, the perfectlyrigid plastic behavior of soil and bridge is assumed to apply the upper bound theorem ofthe theory of plasticity.iiiThe first step in the analysis is the approximation of the local scour action andhere the choice of the appropriate local scour formula is discussed based on thestate-of-the-art research on pier scour, giving the advantage to the formulas that mayconsider temporal aspect. The scour cavities beneath the common pier-foundationsystems are given by the time-dependant local scour depth and their geometry isapproximated in order to simplify the local scour action to a plane strain problem.The second step in the analysis is evaluation of supporting soil and bridge resistances tothe approximated scour cavities. The cavities` influence on the decrease of a bearingcapacity of the supporting soil at an affected pier is considered with basic kinematicmechanisms which are based on soil properties. The bridge resistance is given by plasticstrengths of its elements, which is based on structural system properties andreinforcement detailing.The soil-bridge model is defined, and separately for its longitudinal and lateraldirection, the adopted kinematic mechanisms in the supporting soil are coupled with thepossible failure modes of the bridge superstructure to reveal combinedfailure modes. These are consequently used in the optimization procedure, where theresistance of the model to local scour action is obtained as the ultimate horizontal scourextent beneath a shallow foundation.The uncertainties related to parameters used in the local scour evaluation, soilproperties and bridge elements’ properties are discussed as the essential topic incalculation of the conditional probability of a bridge failure relying on the state-of-theartresearch. In the example of a four span continuous bridge over a river channel, theconditional probabilities of the bridge failure are estimated in Monte Carlo simulationsfor four scenarios. Here, the limit state function accounts time-dependant local scourdepths and the resistance of the assumed soil-bridge model to local scour action at theaffected bridge pier.The presented soil-bridge model clarifies the behavior of multiple spanreinforced concrete girder bridges with shallow foundations in a scouring event. It setsthe upper bound of the local scour extent at bridge piers necessary to trigger a failure.Here, in the calculation of the conditional probability of a bridge failure due to localscour, the combined resistance of the supporting soil and the bridge structure to localscour action is included as the essential ingredient, which has not been done in theup-to-date research. The suggested methodology for quantitative vulnerabilityassessment provides a basis for development of vulnerability maps for road networks inrespect to extreme flooding. These maps are going to be especially useful forunambiguous allocation of resources for mitigating the threat from future floodingevents and issuing timely warnings in the regions where intensive flooding is expected.
AB  - Путна инфраструктура широм света је угрожена природним непoгодама,посебно са ектремним поплавама, које доводе до прекида путних праваца а самимтим и до озбиљних социо-економских последица. Мостови као најкритичнијисегменти путних праваца су угрожени чак и са не тако екстреминм поплавама којеимају велику учесталост догађања. Локална ерозија речног дна код доњег стројамостова која се догађа у поплавама је највећи узрок отказа и оштећења мостоваизазваних природним непогодама. Иако тема управљања мостовима који суизложени поплавама није нова и значајно је обрађивана у предходних 20 година,данашњи Системи Управљања Мостовима и даље не узимају у обзир изненаднеекстремне догађаје као што је локална ерозија речног дна. Овај проблем се уданашњој прaкси углавном третира квалитативним приступом који се ослања набазу података мостова и регуларне инспекције, међутим то не даје задовољавајућерезултате и оценa промене ризика од екстеремних поплава у реалном времену сесматра неопходним.Тема ове тезе је представљање основе за нову методологију заквантитативну оцену угрожености армиранобетонских мостова са плиткофундираним темељима изложених локалној ерозији речног дна. Акценат јестављен на одређивање условне вероватноће лома моста услед локалне ерозијеречног дна док последице оваквог догађаја нису разматране у оквирима тезе.Базирајући се на мостовима који су угрожени ерозијом речног дна у путној мрежиСрбије, разматрани су континуални гредни армиранобетонски мостови са главнимносачем који има попречни пресек дуплог слова Т.Приликом решавања мултидисциплинарног проблема отказа моста уследлокалне ерозије речног дна код стубова, било је неопходно дефинисати типичнимодел тло-мост и поступак са ограниченим бројем улазних података потребних зањегову упрошћену али довољно прецизну анализу. Овде је као општи приступ заанализу могућих механизама лома модела и одређивање условне вероватноћелома разматрана интеракција вода-тло-мост и претпостављено је круто-пластичноviпонашање елемената модела како би се применила горња теорематеорије пластичности.Први корак у анализи је поједностављење начина деловања локалнеерозије речног дна око мостовских стубова и овде је разматрана могућостпримене формула за евалуацију локалне речне ерозије у оцени угроженостимостова, ослањајући се на савремена истраживања. Предност је дата онимформулама које могу узети у обзир раст дубине ерозије у току времена.Геометрија еродираног тла око и испод мостовских стубова је упрошћена тако дасе начин деловања локалне ерозије на кострукцију може посматрати крозравански проблем. Други корак у анализи је прорачун отпорности ослоначког тлаи мостовске конструкције на усвојену упрошћену геометрију поткопавањакод стубова. Овде је смањење граничне носивости тла моделирано уз помоћосновних кинематичких механизама који се заснивају на геотехничким својствиматла и узимају у обзир геометрију поткопавања. Отпорност мостовскеконструкције је узета у обзир преко пластичне носивости њених елемената,одређене на основу карактеристика конструктивног система моста идетаља армирања.За дефинисан модел тло-мост, посебно за подужни и попречни правацмоста, одређују се комбиновани механизми отказа тако што се доводе у везуусвојени кинематички механизми за тло и механизми лома горњег строја моста.Комбиновани механизми се потом користе у оптимизационој процедури где јемаксимална отпорност модела тло-мост одређена као највећи хоризонтални дометпоткопавања локалне ерозије речног дна код мостовског стуба.Неизвесности код одређивања параметара потребних код евалуацијелокалне речне ерозије, карактеристика тла и носивости елемената мостовскеконструкције су разматране на бази савремених истраживања као главна тема припрорачуну условне вероватноће отказа моста. На примеру континуалног моста начетири поља који прелази преко реке, срачунате су условне вероватноће ломамоста у Монте Карло симулацијама за четири сценарија. Овде је у граничнојфункцији узета у обзир временски зависна дубина локалне ерозије и отпорностмодела тло-мост на ширење зоне поткопавања код мостовског стуба.Представљени модел тло-мост разјашњава понашање плитко фундиранихконтинуалних гредних армиранобетонских мостова изложених деловању локалнеерозије речног дна и даје горњу границу простирања ерозије код мостовскихстубова која доводи до отказа конструкције. Као есенцијална компонента заанализу угрожености, разматрана је комбинована отпорност ослоначког тла имостовске конструкције на локалну ерозију речног дна, што није било темапредходних научних истраживања. Представљена методологија за квантитативнуоцену угрожености представља основу за развој мапа угрожености путних мрежау екстремним поплавама. Ове мапе ће посебно бити корисне код управљањаресурсима за ублажавање ризика од поплава као и за издавања раних упозорењана опасност у подручијима где се очекују поплаве великог интензитета.
PB  - Универзитет у Београду, Грађевински факултет
T2  - Универзитет у Београду
T1  - Vulnerability of reinforced concrete bridges to local scour in bridge management
T1  - Upravljanje armiranobetonskim mostovima u kontekstu njihove ugroženosti lokalnom erozijom rečnog dna.
UR  - https://hdl.handle.net/21.15107/rcub_nardus_5955
ER  - 
@phdthesis{
author = "Tanasić, Nikola S.",
year = "2015-04-28",
abstract = "The road infrastructure around the world is impaired by natural hazards, inparticular with extreme flooding, which sever the road links and lead to serioussocio-economic consequences. The bridges, which are the most critical parts of roadlinks, are threatened even by less extreme floods with high occurrence rates. The localscour at bridge substructures associated with floods is regarded as the predominantcause of hazard triggered failures. Although the management of bridges exposed toflooding is not a new topic and has been extensively elaborated in the last 20 years, thecurrent Bridge Management Systems still cannot account for sudden events such as thelocal scour. The current procedures, which usually rest on qualitative approaches andregular inspections, do not give satisfactory results in scheduling the appropriate riskreducing interventions. The evaluation of real-time risk changes associated to thishazard is deemed necessary.The topic of the thesis is to present the basis of the novel methodology forquantitative vulnerability assessment of reinforced concrete bridges with shallowfoundations exposed to local scour. Here, the accent is set on the estimation of theconditional probability of a bridge failure due to a scouring event, while the relatedconsequences are beyond the scope of the thesis. Based on the scour critical bridges inthe Serbian road network, the reinforced concrete bridge types which are considered inthe analysis have multiple span double-tee main girders on common pier-foundationsystems.In order to solve the multidisciplinary problem of local scour action at bridgepiers and associated failures, it was essential to develop a typical bridge model andframework with a modest data set for its simple yet accurate analysis. As the generalapproach to analyze possible failure modes and consequently obtain the probability ofbridge failure, the water-soil-bridge interaction is suggested. In addition, the perfectlyrigid plastic behavior of soil and bridge is assumed to apply the upper bound theorem ofthe theory of plasticity.iiiThe first step in the analysis is the approximation of the local scour action andhere the choice of the appropriate local scour formula is discussed based on thestate-of-the-art research on pier scour, giving the advantage to the formulas that mayconsider temporal aspect. The scour cavities beneath the common pier-foundationsystems are given by the time-dependant local scour depth and their geometry isapproximated in order to simplify the local scour action to a plane strain problem.The second step in the analysis is evaluation of supporting soil and bridge resistances tothe approximated scour cavities. The cavities` influence on the decrease of a bearingcapacity of the supporting soil at an affected pier is considered with basic kinematicmechanisms which are based on soil properties. The bridge resistance is given by plasticstrengths of its elements, which is based on structural system properties andreinforcement detailing.The soil-bridge model is defined, and separately for its longitudinal and lateraldirection, the adopted kinematic mechanisms in the supporting soil are coupled with thepossible failure modes of the bridge superstructure to reveal combinedfailure modes. These are consequently used in the optimization procedure, where theresistance of the model to local scour action is obtained as the ultimate horizontal scourextent beneath a shallow foundation.The uncertainties related to parameters used in the local scour evaluation, soilproperties and bridge elements’ properties are discussed as the essential topic incalculation of the conditional probability of a bridge failure relying on the state-of-theartresearch. In the example of a four span continuous bridge over a river channel, theconditional probabilities of the bridge failure are estimated in Monte Carlo simulationsfor four scenarios. Here, the limit state function accounts time-dependant local scourdepths and the resistance of the assumed soil-bridge model to local scour action at theaffected bridge pier.The presented soil-bridge model clarifies the behavior of multiple spanreinforced concrete girder bridges with shallow foundations in a scouring event. It setsthe upper bound of the local scour extent at bridge piers necessary to trigger a failure.Here, in the calculation of the conditional probability of a bridge failure due to localscour, the combined resistance of the supporting soil and the bridge structure to localscour action is included as the essential ingredient, which has not been done in theup-to-date research. The suggested methodology for quantitative vulnerabilityassessment provides a basis for development of vulnerability maps for road networks inrespect to extreme flooding. These maps are going to be especially useful forunambiguous allocation of resources for mitigating the threat from future floodingevents and issuing timely warnings in the regions where intensive flooding is expected., Путна инфраструктура широм света је угрожена природним непoгодама,посебно са ектремним поплавама, које доводе до прекида путних праваца а самимтим и до озбиљних социо-економских последица. Мостови као најкритичнијисегменти путних праваца су угрожени чак и са не тако екстреминм поплавама којеимају велику учесталост догађања. Локална ерозија речног дна код доњег стројамостова која се догађа у поплавама је највећи узрок отказа и оштећења мостоваизазваних природним непогодама. Иако тема управљања мостовима који суизложени поплавама није нова и значајно је обрађивана у предходних 20 година,данашњи Системи Управљања Мостовима и даље не узимају у обзир изненаднеекстремне догађаје као што је локална ерозија речног дна. Овај проблем се уданашњој прaкси углавном третира квалитативним приступом који се ослања набазу података мостова и регуларне инспекције, међутим то не даје задовољавајућерезултате и оценa промене ризика од екстеремних поплава у реалном времену сесматра неопходним.Тема ове тезе је представљање основе за нову методологију заквантитативну оцену угрожености армиранобетонских мостова са плиткофундираним темељима изложених локалној ерозији речног дна. Акценат јестављен на одређивање условне вероватноће лома моста услед локалне ерозијеречног дна док последице оваквог догађаја нису разматране у оквирима тезе.Базирајући се на мостовима који су угрожени ерозијом речног дна у путној мрежиСрбије, разматрани су континуални гредни армиранобетонски мостови са главнимносачем који има попречни пресек дуплог слова Т.Приликом решавања мултидисциплинарног проблема отказа моста уследлокалне ерозије речног дна код стубова, било је неопходно дефинисати типичнимодел тло-мост и поступак са ограниченим бројем улазних података потребних зањегову упрошћену али довољно прецизну анализу. Овде је као општи приступ заанализу могућих механизама лома модела и одређивање условне вероватноћелома разматрана интеракција вода-тло-мост и претпостављено је круто-пластичноviпонашање елемената модела како би се применила горња теорематеорије пластичности.Први корак у анализи је поједностављење начина деловања локалнеерозије речног дна око мостовских стубова и овде је разматрана могућостпримене формула за евалуацију локалне речне ерозије у оцени угроженостимостова, ослањајући се на савремена истраживања. Предност је дата онимформулама које могу узети у обзир раст дубине ерозије у току времена.Геометрија еродираног тла око и испод мостовских стубова је упрошћена тако дасе начин деловања локалне ерозије на кострукцију може посматрати крозравански проблем. Други корак у анализи је прорачун отпорности ослоначког тлаи мостовске конструкције на усвојену упрошћену геометрију поткопавањакод стубова. Овде је смањење граничне носивости тла моделирано уз помоћосновних кинематичких механизама који се заснивају на геотехничким својствиматла и узимају у обзир геометрију поткопавања. Отпорност мостовскеконструкције је узета у обзир преко пластичне носивости њених елемената,одређене на основу карактеристика конструктивног система моста идетаља армирања.За дефинисан модел тло-мост, посебно за подужни и попречни правацмоста, одређују се комбиновани механизми отказа тако што се доводе у везуусвојени кинематички механизми за тло и механизми лома горњег строја моста.Комбиновани механизми се потом користе у оптимизационој процедури где јемаксимална отпорност модела тло-мост одређена као највећи хоризонтални дометпоткопавања локалне ерозије речног дна код мостовског стуба.Неизвесности код одређивања параметара потребних код евалуацијелокалне речне ерозије, карактеристика тла и носивости елемената мостовскеконструкције су разматране на бази савремених истраживања као главна тема припрорачуну условне вероватноће отказа моста. На примеру континуалног моста начетири поља који прелази преко реке, срачунате су условне вероватноће ломамоста у Монте Карло симулацијама за четири сценарија. Овде је у граничнојфункцији узета у обзир временски зависна дубина локалне ерозије и отпорностмодела тло-мост на ширење зоне поткопавања код мостовског стуба.Представљени модел тло-мост разјашњава понашање плитко фундиранихконтинуалних гредних армиранобетонских мостова изложених деловању локалнеерозије речног дна и даје горњу границу простирања ерозије код мостовскихстубова која доводи до отказа конструкције. Као есенцијална компонента заанализу угрожености, разматрана је комбинована отпорност ослоначког тла имостовске конструкције на локалну ерозију речног дна, што није било темапредходних научних истраживања. Представљена методологија за квантитативнуоцену угрожености представља основу за развој мапа угрожености путних мрежау екстремним поплавама. Ове мапе ће посебно бити корисне код управљањаресурсима за ублажавање ризика од поплава као и за издавања раних упозорењана опасност у подручијима где се очекују поплаве великог интензитета.",
publisher = "Универзитет у Београду, Грађевински факултет",
journal = "Универзитет у Београду",
title = "Vulnerability of reinforced concrete bridges to local scour in bridge management, Upravljanje armiranobetonskim mostovima u kontekstu njihove ugroženosti lokalnom erozijom rečnog dna.",
url = "https://hdl.handle.net/21.15107/rcub_nardus_5955"
}
Tanasić, N. S.. (2015-04-28). Vulnerability of reinforced concrete bridges to local scour in bridge management. in Универзитет у Београду
Универзитет у Београду, Грађевински факултет..
https://hdl.handle.net/21.15107/rcub_nardus_5955
Tanasić NS. Vulnerability of reinforced concrete bridges to local scour in bridge management. in Универзитет у Београду. 2015;.
https://hdl.handle.net/21.15107/rcub_nardus_5955 .
Tanasić, Nikola S., "Vulnerability of reinforced concrete bridges to local scour in bridge management" in Универзитет у Београду (2015-04-28),
https://hdl.handle.net/21.15107/rcub_nardus_5955 .

Assessment of indirect costs due to highway link severance caused by reduction of bridge functional performance

Ilić, Vladan; Tanasić, Nikola; Hajdin, Rade

(Srpsko društvo za puteve VIA-VITA, Beograd, 2014)

TY  - JOUR
AU  - Ilić, Vladan
AU  - Tanasić, Nikola
AU  - Hajdin, Rade
PY  - 2014
UR  - https://grafar.grf.bg.ac.rs/handle/123456789/557
AB  - Stability and bearing capacity of the most important engineering structures of road sections (bridges, tunnels, viaducts, etc...) have enormous influence on the functional performance of the entire highway network. The bridges over torrential rivers are the most vulnerable, which unfortunately has been manifested in May floods in 2014 on the large part of the Serbian national highway network. Structural damage on bridges, inflicted in floods, reduce bearing capacity and designed traffic flow performance of bridges, as well as their capacity to provide safe traffic for all road users. In addition to the direct costs related to the reconstruction of the bridge structure, a partial restriction or in the worst case total traffic suspension due to bridge collapse, leads to a significant increase of indirect costs of road users. In fact, topic of this paper is efficient assessment of the indirect costs due to partial or complete closure of highway section due to damage on bridge structural elements. The VISUM simulation model of one part of the Serbian national highway network was used as a basis for the vulnerability assessment of links that cross over the bridges endangered by floods.
AB  - Stabilnost i nosivost najvažnijih inženjerskih objekata na deonicama puta (mostovi, tuneli, vijadukti, itd.) imaju ogroman uticaj na funkcionalne performanse cele putne mreže. Najviše su ugroženi mostovi preko bujičnih reka, što je na žalost i potvrđeno tokom majskih poplava 2014. na većem delu putne mreže Srbije. Oštećenja na konstrukciji mosta, nastala u poplavama, smanjuju nosivost i projektovani kapacitet mostova, kao i njihovu sposobnost da obezbede siguran saobraćaj za sve korisnike putne deonice na kojoj se oni nalaze. Delimična obustava ili u najgorem slučaju potpuni prekid saobraćaja usled rušenja mosta, pored direktnih troškova vezanih za obnovu mostovske konstrukcije, dovode do značajnog rasta indirektnih troškova korisnika puta. Tema ovog rada je upravo efikasna procena indirektnih troškova usled delimičnog ili potpunog zatvaranja deonice puta zbog oštećenja na konstrukciji mosta. Simulacioni model u VISUM-u jednog dela nacionalne mreže Srbije korišćen je kao osnova za procenu ‘‘ranjivosti’’ linkova koji prelaze preko mostova ugroženih poplavama.
PB  - Srpsko društvo za puteve VIA-VITA, Beograd
T2  - Put i saobraćaj
T1  - Assessment of indirect costs due to highway link severance caused by reduction of bridge functional performance
T1  - Procena indirektnih troškova usled prekida putne veze zbog smanjenja funkcionalnih performansi mosta
EP  - 69
IS  - 4
SP  - 61
VL  - 60
UR  - https://hdl.handle.net/21.15107/rcub_grafar_557
ER  - 
@article{
author = "Ilić, Vladan and Tanasić, Nikola and Hajdin, Rade",
year = "2014",
abstract = "Stability and bearing capacity of the most important engineering structures of road sections (bridges, tunnels, viaducts, etc...) have enormous influence on the functional performance of the entire highway network. The bridges over torrential rivers are the most vulnerable, which unfortunately has been manifested in May floods in 2014 on the large part of the Serbian national highway network. Structural damage on bridges, inflicted in floods, reduce bearing capacity and designed traffic flow performance of bridges, as well as their capacity to provide safe traffic for all road users. In addition to the direct costs related to the reconstruction of the bridge structure, a partial restriction or in the worst case total traffic suspension due to bridge collapse, leads to a significant increase of indirect costs of road users. In fact, topic of this paper is efficient assessment of the indirect costs due to partial or complete closure of highway section due to damage on bridge structural elements. The VISUM simulation model of one part of the Serbian national highway network was used as a basis for the vulnerability assessment of links that cross over the bridges endangered by floods., Stabilnost i nosivost najvažnijih inženjerskih objekata na deonicama puta (mostovi, tuneli, vijadukti, itd.) imaju ogroman uticaj na funkcionalne performanse cele putne mreže. Najviše su ugroženi mostovi preko bujičnih reka, što je na žalost i potvrđeno tokom majskih poplava 2014. na većem delu putne mreže Srbije. Oštećenja na konstrukciji mosta, nastala u poplavama, smanjuju nosivost i projektovani kapacitet mostova, kao i njihovu sposobnost da obezbede siguran saobraćaj za sve korisnike putne deonice na kojoj se oni nalaze. Delimična obustava ili u najgorem slučaju potpuni prekid saobraćaja usled rušenja mosta, pored direktnih troškova vezanih za obnovu mostovske konstrukcije, dovode do značajnog rasta indirektnih troškova korisnika puta. Tema ovog rada je upravo efikasna procena indirektnih troškova usled delimičnog ili potpunog zatvaranja deonice puta zbog oštećenja na konstrukciji mosta. Simulacioni model u VISUM-u jednog dela nacionalne mreže Srbije korišćen je kao osnova za procenu ‘‘ranjivosti’’ linkova koji prelaze preko mostova ugroženih poplavama.",
publisher = "Srpsko društvo za puteve VIA-VITA, Beograd",
journal = "Put i saobraćaj",
title = "Assessment of indirect costs due to highway link severance caused by reduction of bridge functional performance, Procena indirektnih troškova usled prekida putne veze zbog smanjenja funkcionalnih performansi mosta",
pages = "69-61",
number = "4",
volume = "60",
url = "https://hdl.handle.net/21.15107/rcub_grafar_557"
}
Ilić, V., Tanasić, N.,& Hajdin, R.. (2014). Assessment of indirect costs due to highway link severance caused by reduction of bridge functional performance. in Put i saobraćaj
Srpsko društvo za puteve VIA-VITA, Beograd., 60(4), 61-69.
https://hdl.handle.net/21.15107/rcub_grafar_557
Ilić V, Tanasić N, Hajdin R. Assessment of indirect costs due to highway link severance caused by reduction of bridge functional performance. in Put i saobraćaj. 2014;60(4):61-69.
https://hdl.handle.net/21.15107/rcub_grafar_557 .
Ilić, Vladan, Tanasić, Nikola, Hajdin, Rade, "Assessment of indirect costs due to highway link severance caused by reduction of bridge functional performance" in Put i saobraćaj, 60, no. 4 (2014):61-69,
https://hdl.handle.net/21.15107/rcub_grafar_557 .