Претраживање
Приказ резултата 41-50 од 321
Timoshenko's beam element / Timošenkov gredni element
(Univerzitet u Novom Sadu - Građevinski fakultet, Subotica, 2007)
Two-dimesional beam finite element based on Timoshenko 's beam theory is presented. Using hierarchycall approach, bending and shear stiffness matrices with linear and constant shear drformation acros the knght of the beam ...
Physical methods for waste water treatment: The use of freeze/thaw method with the assistance of microwave radiation for oily water treatment / Fizičke metode za prečišćavanje otpadnih voda - primena metode naizmeničnog mržnjenja i hlađenja i mikrotalasnog zagrevanja za obradu zauljenih voda
(Jugoslovensko društvo za odvodnjavanje i navodnjavanje, Beograd, 2005)
The main sources of oily waste water are oil- refineries, metal industry and food industry. Any technological process that uses emulsions has to take into consideration also the treatment of the used emulsions. The ultimate ...
Technical and Environmental Aspects of Infrastructure Restoration after Destruction of Bridges in the City of Novi Sad
(International Conference on Environmental Recovery of Yugoslavia – ENRY2001, 2001)
This paper deals with the riverbed morphological and environmental changes induced by destruction of bridges in the city of Novi Sad. Different aspects of infrastructure restoration are discussed. The problem of gas pipeline ...
Analytical solution for multilayer plates using general layerwise plate theory / Analitičko rešenje višeslojnih ploča zasnovano na opštoj laminatnoj teoriji ploča
(Univerzitet u Nišu, Niš, 2005)
This paper deals with closed-form solution for static analysis of simply supported composite plate, based on generalized laminate plate theory (GLPT). The mathematical model assumes piece-wise linear variation of in-plane ...
Business plan of the geodetic enterprise in the foundation / Biznis plan geodetskog preduzeća u osnivanju
(Republički geodetski zavod Srbije, Beograd, 2003)
In this work is described the procedure of the production of the business plan. On the concrete small geodetic enterprise in the foundation has been done the projection of the indispensable financial funds to the beginning ...
Uncertainties in flood frequency estimation by partial duration series / Neizvesnosti u analizi velikih voda metodom parcijalnih serija
(Jugoslovensko društvo za odvodnjavanje i navodnjavanje, Beograd, 2006)
In hydrologic practice, flood frequency analysis is usually based on fitting a theoretical distribution to observed data series. Flood frequency analysis in hydrologic practice is essentially based on fitting of a theoretical ...
Modified rainfall-runoff model for bifurcations caused by channels embedded in catchments
(Univerzitet u Kragujevcu - Fakultet inženjerskih nauka, Kragujevac, 2009)
The particularity of 'Vlasina' hydropower plants catchment is a big number of gravitation channels used to collect the water from neighboring natural catchments. The overall catchment size is thus increased, compared to ...
COST 354: European harmonization of Performance Indicators for Road Pavements / COST 354 - evropska harmonizacija indikatora stanja kolovoznih konstrukcija na putevima
(Srpsko društvo za puteve VIA-VITA, Beograd, 2008)
In 2004 the COST Action 354 'Performance Indicators for Road Pavements' was initiated by the European intergovernmental scientific network COST (European Cooperation in the Field of Scientific and Technical Research) with ...
The usage of optical fibers for damage detection in ballistic protection composite laminates / Upotreba optičkih vlakana za detekciju oštećenja kompozitnih laminata namenjenih za balističku zaštitu
(Savez hemijskih inženjera, Beograd, 2006)
This paper describes the procedure of embedding fiber optic sensors in laminar thermoplastic composite material, as well as damage investigation after ballistic loading. Thermoplastic-reinforced composite materials were ...
The Belgrade waste water system during severe rainfall / Beogradski kanalizacioni sistem u uslovima ekstremnih padavina
(Udruženje za tehnologiju vode i sanitarno inžinjerstvo, Beograd, 2009)
The Belgrade waste water system started being built more than 100 years ago. It is getting larger in accordance to urban development aimed at collecting most of waste water including rainfall runoff and communal and ...