Претраживање
Приказ резултата 3301-3310 од 3335
Retrofitting of multifamily housing: life-cycle costing aspects
(Cardiff: The Welsh School of Architecture, Cardiff University, 2016)
Modeliranje stohastičke strukture karakteristika velikih voda dobijenih iz serija pikova iznad praga / Modelling of Stohastic Structure of Flood Characteristics Derived From Peaks Over Threshold Series
(Univerzitet u Beogradu, Građevinski fakultet, 2013)
Na formiranje velikih voda utiču mnogobrojni i međusobno uslovljeni ćinioci,
pa se one najčešće opisuju u domenu verovatnoće pojave. Merodavne velike vode,
izražene kroz protoke, zapremine, trajanja talasa i slično, ...
The Impact on Karst Aquifer Regimes Induced by a Surface Reservoir in Karst through Multiparametric Analyses (Reservoir Bileća—Herzegovina)
(MDPI, 2023)
The results of long-term groundwater monitoring in the Bileća reservoir adjacent (eastern Herzegovina, Bosnia and Herzegovina) indicate that there is a good hydraulic connection between the reservoir and the karst aquifer ...
Geotehnički aspekti izgradnje visećeg pešačkog mosta u starom gradu u Užicu / Geotechnical aspects of construction of stressed ribbon bridge in Užice old town
(Savez građevinskih inženjera Srbije, 2023)
U radu su prikazani rezultati geotehničkih istraživanja za potrebe izgradnje visećeg pešačkog mosta preko klisure reke Đetinje u Užicu. Predviđeno je da most, sistema prednapregnute trake, omogući prelaz pešacima sa desne ...
Primena BIM-a u upravljanju projektima - kako boljim projektovanjem smanjiti probleme u izvođenju
(Konferencija - 16. kongres DGKS 2022, 28 - 30. 9, Aranđelovac, 2022)
Uspešno upravljanje projektima podrazumeva maksimalno ostvarenje ciljeva projekta uz minimalne probleme u realizaciji. Preduslov za prvo je kreativni a za drugo tehnički kvalitet projektovanja. U radu je predstavljen model ...
Compensating the lack of big data in construction industry with expert knowledge: a case study
(1st Serbian International Conference on Applied Artificial Intelligence (SICAAI) Kragujevac, Serbia, May 19-20, 2022, 2022)
Due to various reasons, there is a lack of big data in the construction industry, one of the main obstacles to a broader implementation of AI. Another obstacle is adhering to analytical methods in fields more suitable for ...
Metodologija proračuna helikopterske buke primenom INM modela
(Beograd: Srpsko društvo za puteve "Via-Vita", 2019)
Jedan od uzroka sve višeg nivoa stresa među gradskom populacijom jeste buka od saobraćaja. Pored buke čiji je najčešći uzrok drumski ili železnički saobraćaj, karakterističnu vrstu buke proizvodi vazdušni saobraćaj. U ovom ...
A class of univalent functions with real coefficients
(Springer, 2019)
Keyphrases analysis of BIM standards through occurrence of most common BIM uses
(The 8th PSU-UNS International Conference on Engineering and Technology (ICET-2017), Novi Sad, Serbia, June 8-10, 2017 University of Novi Sad, Faculty of Technical Sciences, 2017)
The 8th PSU-UNS International Conference on Engineering and
Technology (ICET-2017), Novi Sad, Serbia, June 8-10, 2017
University of Novi Sad, Faculty of Technical Sciences
Abstract: Building Information Modeling (BIM) ...
Development of DIY rain gauge of reasonable cost / Kako napraviti pouzdan kišomer prihvatljive cene
(University of Novi Sad, Faculty of Civil Engineering Subotica, Subotica, 2018)
Data regarding the quantity and the intensity of rainfall is needed for the purposes of the hydrotechnical practice. The Republic Hydrometeorological Service of Serbia is the organization responsible ...