GraFar - Repository of the Faculty of Civil Engineering
Faculty of Civil Engineering of the University of Belgrade
    • English
    • Српски
    • Српски (Serbia)
  • English 
    • English
    • Serbian (Cyrillic)
    • Serbian (Latin)
  • Login
View Item 
  •   GraFar
  • GraFar
  • Radovi istraživača / Researcher's publications
  • View Item
  •   GraFar
  • GraFar
  • Radovi istraživača / Researcher's publications
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Current strategy for highway construction in the Republic of Serbia

Aktuelna strategija realizacije izgradnje autoputeva u Republici Srbiji

Thumbnail
2014
1248.pdf (2.584Mb)
Authors
Ivanišević, Nenad
Arizanović, Dragan
Petronijević, Predrag
Mikić, Miljan
Conference object (Published version)
Metadata
Show full item record
Abstract
In order to achieve the economic development of the Republic of Serbia, it is necessary to provide adequate traffic infrastructure, particularly highways. The second lane on the northern branch of Corridor X (E-75) from Horgoš to Belgrade has been completed, and the construction works on the eastern branch (E-80) from Niš to the Bulgarian border and on the southern branch (E-75) from Leskovac to the Macedonian border are ongoing. Works are also in progress on the Belgrade bypass. Works on the E-763 ("Corridor 11") are executed between Obrenovac and Preljina. Continuation of this road towards Montenegro is being prepared. Also preparations for the highway on the E-761 from Pojate to Preljina are ongoing.
U cilju ostvarivanja ekonomskog razvoja Republike Srbije neophodno je obezbediti odgovarajuću saobraćanu infrastrukturu, a naročito autoputsku. Završena je izgradnja druge trake na severnom kraku Koridora X (E-75) od Horgoša do Beograda, a u toku je izvođenje radova na istočnom kraku (E-80) od Niša do granice sa Bugarskom i južnom kraku (E-75) od Leskovca do granice sa Makedonijom. Takođe su u toku radovi na obilaznici Beograda. Radovi na E-763 (“Koridor 11”) se izvode od Obrenovca do Preljine, a u pripremi je nastavak ovog puta prema Crnoj Gori kao i autoput na E-761 od Pojata do Preljine
Source:
Zbornik radova / DGKS Društvo građevinskih konstruktera Srbije, 14. kongres, Novi Sad, 24-26. oktobar, 2014, 2014, 109-120
Publisher:
  • Društvo građevinskih konstruktera, Beograd

ISBN: 978-86-85073-19-9

[ Google Scholar ]
Handle
https://hdl.handle.net/21.15107/rcub_grafar_1250
URI
https://grafar.grf.bg.ac.rs/handle/123456789/1250
Collections
  • Radovi istraživača / Researcher's publications
  • Катедра за управљање пројектима у грађевинарству
Institution/Community
GraFar
TY  - CONF
AU  - Ivanišević, Nenad
AU  - Arizanović, Dragan
AU  - Petronijević, Predrag
AU  - Mikić, Miljan
PY  - 2014
UR  - https://grafar.grf.bg.ac.rs/handle/123456789/1250
AB  - In order to achieve the economic development of the Republic of Serbia, it is necessary to provide adequate traffic infrastructure, particularly highways. The second lane on the northern branch of Corridor X (E-75) from Horgoš to Belgrade has been completed, and the construction works on the eastern branch (E-80) from Niš to the Bulgarian border and on the southern branch (E-75) from Leskovac to the Macedonian border are ongoing. Works are also in progress on the Belgrade bypass. Works on the E-763 ("Corridor 11") are executed between Obrenovac and Preljina. Continuation of this road towards Montenegro is being prepared. Also preparations for the highway on the E-761 from Pojate to Preljina are ongoing.
AB  - U cilju ostvarivanja ekonomskog razvoja Republike Srbije neophodno je obezbediti odgovarajuću saobraćanu infrastrukturu, a naročito autoputsku. Završena je izgradnja druge trake na severnom kraku Koridora X (E-75) od Horgoša do Beograda, a u toku je izvođenje radova na istočnom kraku (E-80) od Niša do granice sa Bugarskom i južnom kraku (E-75) od Leskovca do granice sa Makedonijom. Takođe su u toku radovi na obilaznici Beograda. Radovi na E-763 (“Koridor 11”) se izvode od Obrenovca do Preljine, a u pripremi je nastavak ovog puta prema Crnoj Gori kao i autoput na E-761 od Pojata do Preljine
PB  - Društvo građevinskih konstruktera, Beograd
C3  - Zbornik radova / DGKS Društvo građevinskih konstruktera Srbije, 14. kongres, Novi Sad, 24-26. oktobar, 2014
T1  - Current strategy for highway construction in the Republic of Serbia
T1  - Aktuelna strategija realizacije izgradnje autoputeva u Republici Srbiji
EP  - 120
SP  - 109
UR  - https://hdl.handle.net/21.15107/rcub_grafar_1250
ER  - 
@conference{
author = "Ivanišević, Nenad and Arizanović, Dragan and Petronijević, Predrag and Mikić, Miljan",
year = "2014",
abstract = "In order to achieve the economic development of the Republic of Serbia, it is necessary to provide adequate traffic infrastructure, particularly highways. The second lane on the northern branch of Corridor X (E-75) from Horgoš to Belgrade has been completed, and the construction works on the eastern branch (E-80) from Niš to the Bulgarian border and on the southern branch (E-75) from Leskovac to the Macedonian border are ongoing. Works are also in progress on the Belgrade bypass. Works on the E-763 ("Corridor 11") are executed between Obrenovac and Preljina. Continuation of this road towards Montenegro is being prepared. Also preparations for the highway on the E-761 from Pojate to Preljina are ongoing., U cilju ostvarivanja ekonomskog razvoja Republike Srbije neophodno je obezbediti odgovarajuću saobraćanu infrastrukturu, a naročito autoputsku. Završena je izgradnja druge trake na severnom kraku Koridora X (E-75) od Horgoša do Beograda, a u toku je izvođenje radova na istočnom kraku (E-80) od Niša do granice sa Bugarskom i južnom kraku (E-75) od Leskovca do granice sa Makedonijom. Takođe su u toku radovi na obilaznici Beograda. Radovi na E-763 (“Koridor 11”) se izvode od Obrenovca do Preljine, a u pripremi je nastavak ovog puta prema Crnoj Gori kao i autoput na E-761 od Pojata do Preljine",
publisher = "Društvo građevinskih konstruktera, Beograd",
journal = "Zbornik radova / DGKS Društvo građevinskih konstruktera Srbije, 14. kongres, Novi Sad, 24-26. oktobar, 2014",
title = "Current strategy for highway construction in the Republic of Serbia, Aktuelna strategija realizacije izgradnje autoputeva u Republici Srbiji",
pages = "120-109",
url = "https://hdl.handle.net/21.15107/rcub_grafar_1250"
}
Ivanišević, N., Arizanović, D., Petronijević, P.,& Mikić, M.. (2014). Current strategy for highway construction in the Republic of Serbia. in Zbornik radova / DGKS Društvo građevinskih konstruktera Srbije, 14. kongres, Novi Sad, 24-26. oktobar, 2014
Društvo građevinskih konstruktera, Beograd., 109-120.
https://hdl.handle.net/21.15107/rcub_grafar_1250
Ivanišević N, Arizanović D, Petronijević P, Mikić M. Current strategy for highway construction in the Republic of Serbia. in Zbornik radova / DGKS Društvo građevinskih konstruktera Srbije, 14. kongres, Novi Sad, 24-26. oktobar, 2014. 2014;:109-120.
https://hdl.handle.net/21.15107/rcub_grafar_1250 .
Ivanišević, Nenad, Arizanović, Dragan, Petronijević, Predrag, Mikić, Miljan, "Current strategy for highway construction in the Republic of Serbia" in Zbornik radova / DGKS Društvo građevinskih konstruktera Srbije, 14. kongres, Novi Sad, 24-26. oktobar, 2014 (2014):109-120,
https://hdl.handle.net/21.15107/rcub_grafar_1250 .

DSpace software copyright © 2002-2015  DuraSpace
About the GraFar Repository | Send Feedback

OpenAIRERCUB
 

 

All of DSpaceCommunitiesAuthorsTitlesSubjectsThis institutionAuthorsTitlesSubjects

Statistics

View Usage Statistics

DSpace software copyright © 2002-2015  DuraSpace
About the GraFar Repository | Send Feedback

OpenAIRERCUB