GraFar - Repository of the Faculty of Civil Engineering
Faculty of Civil Engineering of the University of Belgrade
    • English
    • Српски
    • Српски (Serbia)
  • English 
    • English
    • Serbian (Cyrilic)
    • Serbian (Latin)
  • Login
View Item 
  •   GraFar
  • GraFar
  • Radovi istraživača / Researcher's publications
  • View Item
  •   GraFar
  • GraFar
  • Radovi istraživača / Researcher's publications
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Railway road bridge in Novi Sad - rationality of the bridge structure

Železničko-drumski most u Novom Sadu - racionalnost konstrukcije mosta

Thumbnail
2014
1255.pdf (1.731Mb)
Authors
Bojović, Aleksandar
Marković, Zlatko
Mora, A.
Casosala, L.
Aleksić, Dimitrije
Pavlović, Marko
Spremić, Milan
Novaković, Novak
Conference object (Published version)
Metadata
Show full item record
Abstract
The construction of Railway Road Bridge across the Danube in Novi Sad is in progress. The bridge is designed for two railway tracks, two road lanes and two footpaths, with total width of 31,440 m. The distances of the piers are 27+178,5+220,5+48 m and total bridge length is 474 m. On the cetral two spans are steel tied arches with network hangers and composite decks. In the article is presented the rationality of the bridge structure – main bearing systems, hangers and deck structures – according to steel material quantities and total construction costs.
Železničko-drumski most preko Dunava u Novom Sadu je u toku gradnje. Most ima dva koloseka, dve drumske trake i dve pešačke staze i širok je 31,440 m. Razmaci stubova su 27+178,5+220,5+ 48 m, pa je ukupna dužina mosta 474 m. Na dva centralna raspona su čelični lukovi sa zategom, dijagonalnim vešaljkama i spregnutom kolovoznom konstrukcijom. Konstrukcija mosta (glavni noseći sistemi, vešaljke i kolovozne konstrukcije) je vrlo racionalna po količini materijala i koštanju izgradnje.
Source:
Zbornik radova / DGKS Društvo građevinskih konstruktera Srbije, 14. kongres, Novi Sad, 24-26. oktobar, 2014., 2014, 59-70
Publisher:
  • Društvo građevinskih konstruktera Srbije, Beograd

ISBN: 978-86-85073-19-9

[ Google Scholar ]
URI
http://grafar.grf.bg.ac.rs/handle/123456789/1257
Collections
  • Radovi istraživača / Researcher's publications
  • Катедра за материјале и конструкције
Institution
GraFar
TY  - CONF
AU  - Bojović, Aleksandar
AU  - Marković, Zlatko
AU  - Mora, A.
AU  - Casosala, L.
AU  - Aleksić, Dimitrije
AU  - Pavlović, Marko
AU  - Spremić, Milan
AU  - Novaković, Novak
PY  - 2014
UR  - http://grafar.grf.bg.ac.rs/handle/123456789/1257
AB  - The construction of Railway Road Bridge across the Danube in Novi Sad is in progress. The bridge is designed for two railway tracks, two road lanes and two footpaths, with total width of 31,440 m. The distances of the piers are 27+178,5+220,5+48 m and total bridge length is 474 m. On the cetral two spans are steel tied arches with network hangers and composite decks. In the article is presented the rationality of the bridge structure – main bearing systems, hangers and deck structures – according to steel material quantities and total construction costs.
AB  - Železničko-drumski most preko Dunava u Novom Sadu je u toku gradnje. Most ima dva koloseka, dve drumske trake i dve pešačke staze i širok je 31,440 m. Razmaci stubova su 27+178,5+220,5+ 48 m, pa je ukupna dužina mosta 474 m. Na dva centralna raspona su čelični lukovi sa zategom, dijagonalnim vešaljkama i spregnutom kolovoznom konstrukcijom. Konstrukcija mosta (glavni noseći sistemi, vešaljke i kolovozne konstrukcije) je vrlo racionalna po količini materijala i koštanju izgradnje.
PB  - Društvo građevinskih konstruktera Srbije, Beograd
C3  - Zbornik radova / DGKS Društvo građevinskih konstruktera Srbije, 14. kongres, Novi Sad, 24-26. oktobar, 2014.
T1  - Railway road bridge in Novi Sad - rationality of the bridge structure
T1  - Železničko-drumski most u Novom Sadu - racionalnost konstrukcije mosta
EP  - 70
SP  - 59
ER  - 
@conference{
author = "Bojović, Aleksandar and Marković, Zlatko and Mora, A. and Casosala, L. and Aleksić, Dimitrije and Pavlović, Marko and Spremić, Milan and Novaković, Novak",
year = "2014",
url = "http://grafar.grf.bg.ac.rs/handle/123456789/1257",
abstract = "The construction of Railway Road Bridge across the Danube in Novi Sad is in progress. The bridge is designed for two railway tracks, two road lanes and two footpaths, with total width of 31,440 m. The distances of the piers are 27+178,5+220,5+48 m and total bridge length is 474 m. On the cetral two spans are steel tied arches with network hangers and composite decks. In the article is presented the rationality of the bridge structure – main bearing systems, hangers and deck structures – according to steel material quantities and total construction costs., Železničko-drumski most preko Dunava u Novom Sadu je u toku gradnje. Most ima dva koloseka, dve drumske trake i dve pešačke staze i širok je 31,440 m. Razmaci stubova su 27+178,5+220,5+ 48 m, pa je ukupna dužina mosta 474 m. Na dva centralna raspona su čelični lukovi sa zategom, dijagonalnim vešaljkama i spregnutom kolovoznom konstrukcijom. Konstrukcija mosta (glavni noseći sistemi, vešaljke i kolovozne konstrukcije) je vrlo racionalna po količini materijala i koštanju izgradnje.",
publisher = "Društvo građevinskih konstruktera Srbije, Beograd",
journal = "Zbornik radova / DGKS Društvo građevinskih konstruktera Srbije, 14. kongres, Novi Sad, 24-26. oktobar, 2014.",
title = "Railway road bridge in Novi Sad - rationality of the bridge structure, Železničko-drumski most u Novom Sadu - racionalnost konstrukcije mosta",
pages = "70-59"
}
Bojović A, Marković Z, Mora A, Casosala L, Aleksić D, Pavlović M, Spremić M, Novaković N. Železničko-drumski most u Novom Sadu - racionalnost konstrukcije mosta. Zbornik radova / DGKS Društvo građevinskih konstruktera Srbije, 14. kongres, Novi Sad, 24-26. oktobar, 2014.. 2014;:59-70
Bojović, A., Marković, Z., Mora, A., Casosala, L., Aleksić, D., Pavlović, M., Spremić, M.,& Novaković, N. (2014). Železničko-drumski most u Novom Sadu - racionalnost konstrukcije mosta.
Zbornik radova / DGKS Društvo građevinskih konstruktera Srbije, 14. kongres, Novi Sad, 24-26. oktobar, 2014.Društvo građevinskih konstruktera Srbije, Beograd., 59-70.
Bojović Aleksandar, Marković Zlatko, Mora A., Casosala L., Aleksić Dimitrije, Pavlović Marko, Spremić Milan, Novaković Novak, "Železničko-drumski most u Novom Sadu - racionalnost konstrukcije mosta" (2014):59-70

DSpace software copyright © 2002-2015  DuraSpace
About GraFar - Repository of the Faculty of Civil Engineering | Send Feedback

OpenAIRERCUB
 

 

All of DSpaceInstitutionsAuthorsTitlesSubjectsThis institutionAuthorsTitlesSubjects

Statistics

View Usage Statistics

DSpace software copyright © 2002-2015  DuraSpace
About GraFar - Repository of the Faculty of Civil Engineering | Send Feedback

OpenAIRERCUB