Revitalization of "Zvornik" Hydropower Plamt
Rekonstrukcija sifona u hidroelektrani „Zvornik“
Apstrakt
Sixty years after the construction of HPP Zvornik, revitalization of the agregate A1 began. An increase in the installed capacity is provided by the water flow rate rise and the replacement of turbine generators. To make this possible, it is necessary to modify the geometry of the tube cone below the unit. Civil engineering part of the reconstruction works includes: dismantling of the existing steel tube cone lining, removal of the surrounding secondary concrete, assembling the new steel draft tube cone and connecting it with the existing dam concrete structure.
Izvor:
Zbornik radova / Društvо građevinskih konstruktera Srbije, Simpozijum 2016, 15-17. septembar, Zlatibor, 2016, 983-990Izdavač:
- Društvo građevinskih konstruktera Srbije, Beograd
Kolekcije
Institucija/grupa
GraFarTY - CONF AU - Kuzmanović, Vladan AU - Koković, Veljko AU - Spremić, Milan PY - 2016 UR - https://grafar.grf.bg.ac.rs/handle/123456789/1460 AB - Sixty years after the construction of HPP Zvornik, revitalization of the agregate A1 began. An increase in the installed capacity is provided by the water flow rate rise and the replacement of turbine generators. To make this possible, it is necessary to modify the geometry of the tube cone below the unit. Civil engineering part of the reconstruction works includes: dismantling of the existing steel tube cone lining, removal of the surrounding secondary concrete, assembling the new steel draft tube cone and connecting it with the existing dam concrete structure. PB - Društvo građevinskih konstruktera Srbije, Beograd C3 - Zbornik radova / Društvо građevinskih konstruktera Srbije, Simpozijum 2016, 15-17. septembar, Zlatibor T1 - Revitalization of "Zvornik" Hydropower Plamt T1 - Rekonstrukcija sifona u hidroelektrani „Zvornik“ EP - 990 SP - 983 UR - https://hdl.handle.net/21.15107/rcub_grafar_1460 ER -
@conference{ author = "Kuzmanović, Vladan and Koković, Veljko and Spremić, Milan", year = "2016", abstract = "Sixty years after the construction of HPP Zvornik, revitalization of the agregate A1 began. An increase in the installed capacity is provided by the water flow rate rise and the replacement of turbine generators. To make this possible, it is necessary to modify the geometry of the tube cone below the unit. Civil engineering part of the reconstruction works includes: dismantling of the existing steel tube cone lining, removal of the surrounding secondary concrete, assembling the new steel draft tube cone and connecting it with the existing dam concrete structure.", publisher = "Društvo građevinskih konstruktera Srbije, Beograd", journal = "Zbornik radova / Društvо građevinskih konstruktera Srbije, Simpozijum 2016, 15-17. septembar, Zlatibor", title = "Revitalization of "Zvornik" Hydropower Plamt, Rekonstrukcija sifona u hidroelektrani „Zvornik“", pages = "990-983", url = "https://hdl.handle.net/21.15107/rcub_grafar_1460" }
Kuzmanović, V., Koković, V.,& Spremić, M.. (2016). Revitalization of "Zvornik" Hydropower Plamt. in Zbornik radova / Društvо građevinskih konstruktera Srbije, Simpozijum 2016, 15-17. septembar, Zlatibor Društvo građevinskih konstruktera Srbije, Beograd., 983-990. https://hdl.handle.net/21.15107/rcub_grafar_1460
Kuzmanović V, Koković V, Spremić M. Revitalization of "Zvornik" Hydropower Plamt. in Zbornik radova / Društvо građevinskih konstruktera Srbije, Simpozijum 2016, 15-17. septembar, Zlatibor. 2016;:983-990. https://hdl.handle.net/21.15107/rcub_grafar_1460 .
Kuzmanović, Vladan, Koković, Veljko, Spremić, Milan, "Revitalization of "Zvornik" Hydropower Plamt" in Zbornik radova / Društvо građevinskih konstruktera Srbije, Simpozijum 2016, 15-17. septembar, Zlatibor (2016):983-990, https://hdl.handle.net/21.15107/rcub_grafar_1460 .