Bridge deck runoff control trough drainage, treatment and irrigation system: The case study of the bridge Ostruznica over the Sava river

2016
Authors
Despotović, JovanJaćimović, Nenad

Plavšić, Jasna

Stanić, Miloš

Đukić, Aleksandar

Todorović, Andrijana

Biondi, S.
Sambo, F.
Conference object (Published version)
Metadata
Show full item recordAbstract
The paper presents main design project of the bridge Ostruznica deck drainage and runoff treatment. An integral solution of drainage and irrigation and/or discharge water into the Sava river of pre - treated runoff from the portion of highway Dobanovci – Bubanj Potok and the bridge The treated water is taken for irrigation into the groundwater as a recharge, along the series of wells for potable water within sanitary protection zone of the Belgrade Water supply system. The first flush of the criteria rainfall runoff volume is to be pre - treated using a StormwaterR barrels. Such a solution is considered as an additional water source at the aquifer by the rivers’ banks. Also, it is a measure of water cycle improvement. The project is completed by a SwermR preventing system for accidental situation, such as leakage or accidents of vehicles and potential pollution and risks of vulnerability for the potablewater wells.
Source:
Novatech 2016, 2016Publisher:
- GRAIE, Lyon, France (FRA), Lyon
Collections
Institution/Community
GraFarTY - CONF AU - Despotović, Jovan AU - Jaćimović, Nenad AU - Plavšić, Jasna AU - Stanić, Miloš AU - Đukić, Aleksandar AU - Todorović, Andrijana AU - Biondi, S. AU - Sambo, F. PY - 2016 UR - https://grafar.grf.bg.ac.rs/handle/123456789/1461 AB - The paper presents main design project of the bridge Ostruznica deck drainage and runoff treatment. An integral solution of drainage and irrigation and/or discharge water into the Sava river of pre - treated runoff from the portion of highway Dobanovci – Bubanj Potok and the bridge The treated water is taken for irrigation into the groundwater as a recharge, along the series of wells for potable water within sanitary protection zone of the Belgrade Water supply system. The first flush of the criteria rainfall runoff volume is to be pre - treated using a StormwaterR barrels. Such a solution is considered as an additional water source at the aquifer by the rivers’ banks. Also, it is a measure of water cycle improvement. The project is completed by a SwermR preventing system for accidental situation, such as leakage or accidents of vehicles and potential pollution and risks of vulnerability for the potablewater wells. PB - GRAIE, Lyon, France (FRA), Lyon C3 - Novatech 2016 T1 - Bridge deck runoff control trough drainage, treatment and irrigation system: The case study of the bridge Ostruznica over the Sava river UR - https://hdl.handle.net/21.15107/rcub_grafar_1461 ER -
@conference{ author = "Despotović, Jovan and Jaćimović, Nenad and Plavšić, Jasna and Stanić, Miloš and Đukić, Aleksandar and Todorović, Andrijana and Biondi, S. and Sambo, F.", year = "2016", abstract = "The paper presents main design project of the bridge Ostruznica deck drainage and runoff treatment. An integral solution of drainage and irrigation and/or discharge water into the Sava river of pre - treated runoff from the portion of highway Dobanovci – Bubanj Potok and the bridge The treated water is taken for irrigation into the groundwater as a recharge, along the series of wells for potable water within sanitary protection zone of the Belgrade Water supply system. The first flush of the criteria rainfall runoff volume is to be pre - treated using a StormwaterR barrels. Such a solution is considered as an additional water source at the aquifer by the rivers’ banks. Also, it is a measure of water cycle improvement. The project is completed by a SwermR preventing system for accidental situation, such as leakage or accidents of vehicles and potential pollution and risks of vulnerability for the potablewater wells.", publisher = "GRAIE, Lyon, France (FRA), Lyon", journal = "Novatech 2016", title = "Bridge deck runoff control trough drainage, treatment and irrigation system: The case study of the bridge Ostruznica over the Sava river", url = "https://hdl.handle.net/21.15107/rcub_grafar_1461" }
Despotović, J., Jaćimović, N., Plavšić, J., Stanić, M., Đukić, A., Todorović, A., Biondi, S.,& Sambo, F.. (2016). Bridge deck runoff control trough drainage, treatment and irrigation system: The case study of the bridge Ostruznica over the Sava river. in Novatech 2016 GRAIE, Lyon, France (FRA), Lyon.. https://hdl.handle.net/21.15107/rcub_grafar_1461
Despotović J, Jaćimović N, Plavšić J, Stanić M, Đukić A, Todorović A, Biondi S, Sambo F. Bridge deck runoff control trough drainage, treatment and irrigation system: The case study of the bridge Ostruznica over the Sava river. in Novatech 2016. 2016;. https://hdl.handle.net/21.15107/rcub_grafar_1461 .
Despotović, Jovan, Jaćimović, Nenad, Plavšić, Jasna, Stanić, Miloš, Đukić, Aleksandar, Todorović, Andrijana, Biondi, S., Sambo, F., "Bridge deck runoff control trough drainage, treatment and irrigation system: The case study of the bridge Ostruznica over the Sava river" in Novatech 2016 (2016), https://hdl.handle.net/21.15107/rcub_grafar_1461 .