Претраживање
Приказ резултата 1-10 од 1408
The Analysis of Landslide Dynamics Based on Automated GNSS Monitoring-A Case Study
(Springer International Publishing, 2015)
In the past decade, there has been a gradual introduction of systematic monitoring on the largest landslides in Serbia by establishing a network of monitoring facilities. Umka landslide is complex active landslide whose ...
Time-inhomogenous Markov chains in the bridge management
(Taylor and Francis - Balkema, 2014)
Available Bridge Management Systems vary in detail, but generally they comprise a deterioration model to predict condition development and a preservation optimization model to determine the optimum preservation policy. ...
Modeling of laterally loaded piles using embedded beam elements / Model lateralno opterećenih šipova pomoću „umetnutih“ grednih elemenata
(Građevinski fakultet, Subotica, 2016)
Realistic modeling of pile groups requires the use of complex nonlinear 3D simulations, usually with full discretization of pile continuum. In order to reduce the complexity of these models, as well as the computation time, ...
Review of the methods for analysis of flat slabs / Prikaz metoda za proračun ploča direktno oslonjenih na stubove
(Građevinski fakultet Subotica, Subotica, 2016)
The paper analyzes the results of reinforced concrete flat slabs, using different methods based on the theory of elasticity and theory of plasticity. Were considered three methods: stripe method, method according to ...
ESTIMATION OF THE DEFLECTION OF VERTICAL COMPONENTS USING PRECISE LEVELLING AND GNSS MEASUREMENTS ON HIGH PRECISION LEVELLING NETWORK OF SERBIA
(19th International Multidisciplinary Scientific GeoConference SGEM 2019, 2019)
This paper presents the combined method of determining the deflection of vertical components ? and ? based on the precise levelling and GNSS measurements. In general, there are several methods, but the combined method ...
Calibration of the levelling rods using laser interferometer
(International Multidisciplinary Scientific Geoconference, 2017)
In this paper, a method of calibration of the levelling rod Carl Zeiss Jena No. 55822 was proposed. Within a method procedures we follow the requirement of the International Standard ISO/IEC 17025: 2005 and all necessary ...
Assessing the financial feasibility of availability payment PPP projects
(American Society of Civil Engineers (ASCE), 2014)
Over the last couple of decades there has been an increased contribution of the private sector to finance infrastructure projects. However, in view of the current global financial crisis, it has become more difficult for ...
Procena vibracija od saobraćaja
(Simpozijum Društva građevinskih konstruktera Srbije 2012, 2012)
U ovom radu dat je pregled postupaka za procenu vibracija izazvanih dejstvom
saobraćaja, definisanih postojećim britanskim i nemačkim propisima. Procena i
predviđanje dejstva vibracija od saobraćaja na objekte i ljude ...
PID Controllers as Data Assimilation Tool for 1D Hydrodynamic Models of Different Complexity
(Springer, 2019)
Flood risks management is based on data obtained by different forecasts. Forecasts are often based on hydrological-hydrodynamic models. These models are calibrated using selected time-series from the past. However, even ...
Water balance analysis of the karst polje by distributed hydrological modeling
(Hydro-Energy Power Plant "Dabar", TrebinjeUniversity of Belgrade, Faculty of Mining and Geology, Center for Karst Hydrogeology, 2018)
The paper presents results of the physically based, distributed hydrologic model for simulation of runoff in karst areas. The 3Dnet-HET model is developed for simulation of river Trebišnjica catchment, however, in this ...