Претраживање
Приказ резултата 1-3 од 3
Measurements, calibration of rainfall-runoff models and assessment of the return period of flooding events at urban catchment Kumodraž in Belgrade
(IWA Publishing, 2002)
For the purpose of re-design and improvement of the combined sewer system at the Kumodraz catchment in Belgrade, measurements of rainfall and runoff at the catchment were established in late 1997. Observed data are used ...
Radiological and material characterization of high volume fly ash concrete
(Journal of Environmental Radioactivity, 2016)
The main goal of research presented in this paper was the material and radiological characterization of high volume fly ash concrete (HVFAC) in terms of determination of natural radionuclide content and radon emanation and ...
The Successful Delivery of Megaprojects: A Novel Research Method
(SAGE Publications Inc., 2017)
Megaprojects are often associated with poor delivery performance and poor benefits realization. This article provides a method of identifying, in a quantitative and rigorous manner, the characteristics related to project ...