Method in planning construction machinery replacement
Autori
Petronijević, PredragIvanišević, Nenad
Arizanović, Dragan
Marinković, Dejan
Petrović, Marija
Konferencijski prilog (Objavljena verzija)
Metapodaci
Prikaz svih podataka o dokumentuApstrakt
One basic criteria for determining the replacement time of construction
machinery is based on the age , that is, the increase in operating costs of the machine
with time. The key factor which determines and justifies replacement at a given time is
the magnitude of operating costs. This analysis will show a method for replacement
planning and sale of machines in a future time period.
Ključne reči:
Construction Machinery / Cost / Machine replacementIzvor:
6th International Conference Contemporary achievements in civil engineering, 2018, 727-Izdavač:
- Građevinski fakultet u Subotici