GraFar - Repository of the Faculty of Civil Engineering
Faculty of Civil Engineering of the University of Belgrade
    • English
    • Српски
    • Српски (Serbia)
  • English 
    • English
    • Serbian (Cyrillic)
    • Serbian (Latin)
  • Login
View Item 
  •   GraFar
  • GraFar
  • Radovi istraživača / Researcher's publications
  • View Item
  •   GraFar
  • GraFar
  • Radovi istraživača / Researcher's publications
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Merenje protoka u okviru sistema za prečišćavanje otpadnih voda - sa osvrtom na greške primećene na sistemu grada Jagodine

Measuring of Discharge in Waste Water Treatment Plants - With Errors at Waste Water Treatment Plant of Jagodina Town

Thumbnail
1997
bitstream_9978.pdf (1.517Mb)
Authors
Batinić, Božidar
Milanović, Tina
Article (Published version)
Metadata
Show full item record
Abstract
U okviru sistema za prečišćavanje otpadnih vode, pored ostalih merenja, potrebno je na više mesta meriti proticaje. Ta merenja su izuzetno značajna za pravilan rad sistema, jer se na osnovu njih vrši doziranje hemikalija, kontrolišu se opterećenja sistema i rasopdela vode po pojedinim objektima. Pored merenja u samom sistemu neophodno je meriti proticaj i na izlazu iz sistema, pre upuštanja vode u recipijent, da bi se znalo opterećenje vodotoka dodatnim proticajem, koji nije u potpunosti oslobođen svih štetnih materija iz otpadne vode. U radu su analizirani razni načini merenja protoka. Istaknute su primećene greške na postrojenju za prečišćavanje otpadnih voda grada Jagodine i dati su predlozi za pravilnu primenu različitih tipova mernih objekata.
Measuring that must be taken at waste water treatment plants, among other measurings, is measuring of water discharge. These measurings are important for controlling and regular system functioning. Beside measuring in the waste water treatment plants, it is necessary to measure outflow from the system, before its flow into the recipient. Different methods of measuring discharge are presented in the paper. Errors observed at waste water treatment plant for town Jagodina are emphasized. A ways for proper projecting and using a different types of measuring objects are suggested.
Keywords:
merenje protoka / prelivi / sistemi za prečišćavanje otpadnih voda / discharge measuring / spillways / waste water treatment plants
Source:
Vodoprivreda, 1997, 29, 167-168, 217-223
Publisher:
  • Jugoslovensko društvo za odvodnjavanje i navodnjavanje

ISSN: 0350-0519

[ Google Scholar ]
URI
https://grafar.grf.bg.ac.rs/handle/123456789/2564
Collections
  • Radovi istraživača / Researcher's publications
  • Катедра за хидротехнику и водно-еколошко инжењерство
Institution/Community
GraFar
TY  - JOUR
AU  - Batinić, Božidar
AU  - Milanović, Tina
PY  - 1997
UR  - https://grafar.grf.bg.ac.rs/handle/123456789/2564
AB  - U okviru sistema za prečišćavanje otpadnih vode, pored ostalih merenja, potrebno je na više mesta meriti proticaje. Ta merenja su izuzetno značajna za pravilan rad sistema, jer se na osnovu njih vrši doziranje hemikalija, kontrolišu se opterećenja sistema i rasopdela vode po pojedinim objektima. Pored merenja u samom sistemu neophodno je meriti proticaj i na izlazu iz sistema, pre upuštanja vode u recipijent, da bi se znalo opterećenje vodotoka dodatnim proticajem, koji nije u potpunosti oslobođen svih štetnih materija iz otpadne vode. U radu su analizirani razni načini merenja protoka. Istaknute su primećene greške na postrojenju za prečišćavanje otpadnih voda grada Jagodine i dati su predlozi za pravilnu primenu različitih tipova mernih objekata.
AB  - Measuring that must be taken at waste water treatment plants, among other measurings, is measuring of water discharge. These measurings are important for controlling and regular system functioning. Beside measuring in the waste water treatment plants, it is necessary to measure outflow from the system, before its flow into the recipient. Different methods of measuring discharge are presented in the paper. Errors observed at waste water treatment plant for town Jagodina are emphasized. A ways for proper projecting and using a different types of measuring objects are suggested.
PB  - Jugoslovensko društvo za odvodnjavanje i navodnjavanje
T2  - Vodoprivreda
T1  - Merenje protoka u okviru sistema za prečišćavanje otpadnih voda - sa osvrtom na greške primećene na sistemu grada Jagodine
T1  - Measuring of Discharge in Waste Water Treatment Plants - With Errors at Waste Water Treatment Plant of Jagodina Town
EP  - 223
IS  - 167-168
SP  - 217
VL  - 29
ER  - 
@article{
author = "Batinić, Božidar and Milanović, Tina",
year = "1997",
abstract = "U okviru sistema za prečišćavanje otpadnih vode, pored ostalih merenja, potrebno je na više mesta meriti proticaje. Ta merenja su izuzetno značajna za pravilan rad sistema, jer se na osnovu njih vrši doziranje hemikalija, kontrolišu se opterećenja sistema i rasopdela vode po pojedinim objektima. Pored merenja u samom sistemu neophodno je meriti proticaj i na izlazu iz sistema, pre upuštanja vode u recipijent, da bi se znalo opterećenje vodotoka dodatnim proticajem, koji nije u potpunosti oslobođen svih štetnih materija iz otpadne vode. U radu su analizirani razni načini merenja protoka. Istaknute su primećene greške na postrojenju za prečišćavanje otpadnih voda grada Jagodine i dati su predlozi za pravilnu primenu različitih tipova mernih objekata., Measuring that must be taken at waste water treatment plants, among other measurings, is measuring of water discharge. These measurings are important for controlling and regular system functioning. Beside measuring in the waste water treatment plants, it is necessary to measure outflow from the system, before its flow into the recipient. Different methods of measuring discharge are presented in the paper. Errors observed at waste water treatment plant for town Jagodina are emphasized. A ways for proper projecting and using a different types of measuring objects are suggested.",
publisher = "Jugoslovensko društvo za odvodnjavanje i navodnjavanje",
journal = "Vodoprivreda",
title = "Merenje protoka u okviru sistema za prečišćavanje otpadnih voda - sa osvrtom na greške primećene na sistemu grada Jagodine, Measuring of Discharge in Waste Water Treatment Plants - With Errors at Waste Water Treatment Plant of Jagodina Town",
pages = "223-217",
number = "167-168",
volume = "29"
}
Batinić, B.,& Milanović, T.. (1997). Merenje protoka u okviru sistema za prečišćavanje otpadnih voda - sa osvrtom na greške primećene na sistemu grada Jagodine. in Vodoprivreda
Jugoslovensko društvo za odvodnjavanje i navodnjavanje., 29(167-168), 217-223.
Batinić B, Milanović T. Merenje protoka u okviru sistema za prečišćavanje otpadnih voda - sa osvrtom na greške primećene na sistemu grada Jagodine. in Vodoprivreda. 1997;29(167-168):217-223..
Batinić, Božidar, Milanović, Tina, "Merenje protoka u okviru sistema za prečišćavanje otpadnih voda - sa osvrtom na greške primećene na sistemu grada Jagodine" in Vodoprivreda, 29, no. 167-168 (1997):217-223.

DSpace software copyright © 2002-2015  DuraSpace
About the GraFar Repository | Send Feedback

OpenAIRERCUB
 

 

All of DSpaceInstitutions/communitiesAuthorsTitlesSubjectsThis institutionAuthorsTitlesSubjects

Statistics

View Usage Statistics

DSpace software copyright © 2002-2015  DuraSpace
About the GraFar Repository | Send Feedback

OpenAIRERCUB