Приказ основних података о документу

dc.creatorLazović Radovanović, Marija
dc.creatorNikolić, Jelena
dc.creatorRadovanović, Janko
dc.creatorKostić, Svetlana M.
dc.date.accessioned2022-04-11T12:49:40Z
dc.date.available2022-04-11T12:49:40Z
dc.date.issued2022
dc.identifier.issn2076-3417
dc.identifier.urihttps://grafar.grf.bg.ac.rs/handle/123456789/2655
dc.description.abstractThe paper discusses the structural behaviour of concrete-filled steel tube columns (CFT) when applied to the top-down construction method as temporary internal supports for ceilings. Their ultimate capacity to take into account the actual boundary conditions of the column is essential for successful application in construction. The paper presents the full-scale in situ testing of four slender specimens with variable D/t ratios under concentric axial loading. The CFT columns were supported on the previously jacked concrete piles. In addition, detailed finite element numerical models in ABAQUS and PLAXIS computer programs were developed. The models include the nonlinear behaviour of materials and the nonlinear behaviour of soil. The soil–pile–column interaction and impact of the CFT column–pile connection stiffness on global column stability were considered. The numerical model was validated by comparison with the experimental results. In conclusion, the coefficient for the effective buckling length of the studied columns is proposed. Finally, the experimental results of the critical buckling forces were compared with widely used international design codes Eurocode 4-EC4, American standard-ACI and the Australian standard-AS.sr
dc.language.isoensr
dc.relationinfo:eu-repo/grantAgreement/MESTD/Integrated and Interdisciplinary Research (IIR or III)/42012/RS//sr
dc.rightsrestrictedAccesssr
dc.sourceApplied Sciencessr
dc.subjectconcrete-filled steel tubesr
dc.subjecttop-down construction methodsr
dc.subjectexperimental investigationsr
dc.subjectFEM modellingsr
dc.subjectbuckling forcesr
dc.subjecteffective buckling lengthsr
dc.titleStructural Behaviour of Axially Loaded Concrete-Filled Steel Tube Columns during the Top-Down Construction Methodsr
dc.typearticlesr
dc.rights.licenseARRsr
dc.citation.rankM22~
dc.citation.volume12(8), 3771
dc.identifier.doihttps://doi.org/10.3390/app12083771
dc.type.versionpublishedVersionsr


Документи

Thumbnail

Овај документ се појављује у следећим колекцијама

Приказ основних података о документу