GraFar - Repository of the Faculty of Civil Engineering
Faculty of Civil Engineering of the University of Belgrade
    • English
    • Српски
    • Српски (Serbia)
  • English 
    • English
    • Serbian (Cyrillic)
    • Serbian (Latin)
  • Login
View Item 
  •   GraFar
  • GraFar
  • Radovi istraživača / Researcher's publications
  • View Item
  •   GraFar
  • GraFar
  • Radovi istraživača / Researcher's publications
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Quality control plan for road bridges – Overview of COST Action TU1406 WG3 final report

Authorized Users Only
2019
Authors
Kušar, Matej
Linneberg, Poul
Amado, João Luís
Mašović, Snežana
Nikola, Tanasić
Hajdin, Rade
Conference object (Published version)
Metadata
Show full item record
Abstract
The main objective of the COST Action TU1406 is to develop a guideline for the establishment of Quality Control plans for roadway bridges. The guideline is based on conclusions of Working groups 1 and 2 of the Action and is further developed with the contributions and findings of members of Working group 3. The paper presents the overview of the developed framework, where gradual damage processes as well as sudden events are being addressed in evaluation of Key Performance Indicators. The proposed framework relies on data from design and construction phase, as well as from results from visual inspections that are used for an assessment of safety and serviceability - the primary concerns of bridge managers. Special attention is aimed at possible Failure modes and related bridge Vulnerable zones. These are, for instance high moment regions, high shear regions and constructions joints, but can also be zones of bridge conceptual weaknesses. Since there are differences in design and materia...ls for various bridge types, the suitability of the framework is tested separately for girder/frame bridges and arch bridges. Due to the specifics of sudden events, the application of the framework is given separately from gradual damage processes. Emphasis is given on flooding and scour as these are the most common culprits of bridge failures. The steps in the implementation of the framework are briefly shown and an illustrative example is presented.

Keywords:
bridge management / Quality Control
Source:
IABSE Symposium, Guimaraes 2019: Towards a Resilient Built Environment Risk and Asset Management - Report, 2019, 2019, 1298-1305
Funding / projects:
  • COST TU 1406

DOI: DOI:10.2749/guimaraes.2019.1298

[ Google Scholar ]
URI
https://grafar.grf.bg.ac.rs/handle/123456789/2657
Collections
  • Radovi istraživača / Researcher's publications
  • Катедра за материјале и конструкције
Institution/Community
GraFar
TY  - CONF
AU  - Kušar, Matej
AU  - Linneberg, Poul
AU  - Amado, João Luís
AU  - Mašović, Snežana
AU  - Nikola, Tanasić
AU  - Hajdin, Rade
PY  - 2019
UR  - https://grafar.grf.bg.ac.rs/handle/123456789/2657
AB  - The main objective of the COST Action TU1406 is to develop a guideline for the establishment of Quality Control plans for roadway bridges. The guideline is based on conclusions of Working groups 1 and 2 of the Action and is further developed with the contributions and findings of members of Working group 3. The paper presents the overview of the developed framework, where gradual damage processes as well as sudden events are being addressed in evaluation of Key Performance Indicators. The proposed framework relies on data from design and construction phase, as well as from results from visual inspections that are used for an assessment of safety and serviceability - the primary concerns of bridge managers. Special attention is aimed at possible Failure modes and related bridge Vulnerable zones. These are, for instance high moment regions, high shear regions and constructions joints, but can also be zones of bridge conceptual weaknesses. Since there are differences in design and materials for various bridge types, the suitability of the framework is tested separately for girder/frame bridges and arch bridges. Due to the specifics of sudden events, the application of the framework is given separately from gradual damage processes. Emphasis is given on flooding and scour as these are the most common culprits of bridge failures. The steps in the implementation of the framework are briefly shown and an illustrative example is presented.
C3  - IABSE Symposium, Guimaraes 2019: Towards a Resilient Built Environment Risk and Asset Management - Report, 2019
T1  - Quality control plan for road bridges – Overview of COST Action TU1406 WG3 final report
EP  - 1305
SP  - 1298
DO  - DOI:10.2749/guimaraes.2019.1298
DO  - DOI:10.2749/guimaraes.2019.1298
ER  - 
@conference{
author = "Kušar, Matej and Linneberg, Poul and Amado, João Luís and Mašović, Snežana and Nikola, Tanasić and Hajdin, Rade",
year = "2019",
abstract = "The main objective of the COST Action TU1406 is to develop a guideline for the establishment of Quality Control plans for roadway bridges. The guideline is based on conclusions of Working groups 1 and 2 of the Action and is further developed with the contributions and findings of members of Working group 3. The paper presents the overview of the developed framework, where gradual damage processes as well as sudden events are being addressed in evaluation of Key Performance Indicators. The proposed framework relies on data from design and construction phase, as well as from results from visual inspections that are used for an assessment of safety and serviceability - the primary concerns of bridge managers. Special attention is aimed at possible Failure modes and related bridge Vulnerable zones. These are, for instance high moment regions, high shear regions and constructions joints, but can also be zones of bridge conceptual weaknesses. Since there are differences in design and materials for various bridge types, the suitability of the framework is tested separately for girder/frame bridges and arch bridges. Due to the specifics of sudden events, the application of the framework is given separately from gradual damage processes. Emphasis is given on flooding and scour as these are the most common culprits of bridge failures. The steps in the implementation of the framework are briefly shown and an illustrative example is presented.",
journal = "IABSE Symposium, Guimaraes 2019: Towards a Resilient Built Environment Risk and Asset Management - Report, 2019",
title = "Quality control plan for road bridges – Overview of COST Action TU1406 WG3 final report",
pages = "1305-1298",
doi = "DOI:10.2749/guimaraes.2019.1298, DOI:10.2749/guimaraes.2019.1298"
}
Kušar, M., Linneberg, P., Amado, J. L., Mašović, S., Nikola, T.,& Hajdin, R.. (2019). Quality control plan for road bridges – Overview of COST Action TU1406 WG3 final report. in IABSE Symposium, Guimaraes 2019: Towards a Resilient Built Environment Risk and Asset Management - Report, 2019, 1298-1305.
https://doi.org/DOI:10.2749/guimaraes.2019.1298
Kušar M, Linneberg P, Amado JL, Mašović S, Nikola T, Hajdin R. Quality control plan for road bridges – Overview of COST Action TU1406 WG3 final report. in IABSE Symposium, Guimaraes 2019: Towards a Resilient Built Environment Risk and Asset Management - Report, 2019. 2019;:1298-1305.
doi:DOI:10.2749/guimaraes.2019.1298 .
Kušar, Matej, Linneberg, Poul, Amado, João Luís, Mašović, Snežana, Nikola, Tanasić, Hajdin, Rade, "Quality control plan for road bridges – Overview of COST Action TU1406 WG3 final report" in IABSE Symposium, Guimaraes 2019: Towards a Resilient Built Environment Risk and Asset Management - Report, 2019 (2019):1298-1305,
https://doi.org/DOI:10.2749/guimaraes.2019.1298 . .

DSpace software copyright © 2002-2015  DuraSpace
About the GraFar Repository | Send Feedback

OpenAIRERCUB
 

 

All of DSpaceCommunitiesAuthorsTitlesSubjectsThis institutionAuthorsTitlesSubjects

Statistics

View Usage Statistics

DSpace software copyright © 2002-2015  DuraSpace
About the GraFar Repository | Send Feedback

OpenAIRERCUB