GraFar - Repository of the Faculty of Civil Engineering
Faculty of Civil Engineering of the University of Belgrade
    • English
    • Српски
    • Српски (Serbia)
  • English 
    • English
    • Serbian (Cyrillic)
    • Serbian (Latin)
  • Login
View Item 
  •   GraFar
  • GraFar
  • Radovi istraživača / Researcher's publications
  • View Item
  •   GraFar
  • GraFar
  • Radovi istraživača / Researcher's publications
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Critical risks in Serbian infrastructure projects

Thumbnail
2013
Rad u celosti (579.2Kb)
Authors
Mikić, Miljan
Petojević, Zorana
Ivanišević, Nenad
Conference object (Published version)
Metadata
Show full item record
Abstract
Infrastructure projects are usually followed by numerous standard, but also specific risks associated with project cost, schedule, quality, performance, health and safety aspects, environmental aspects, as well as with other, non‐tangible factors. They, if not timely identified, treated and controlled cause that project actual performance significantly varies from planned values. This paper presents results of a conducted infrastructure construction project risks survey for projects settled in Serbia. The survey includes evaluation of major risks in relation to infrastructure project cost and schedule performance and the analysis of usage, necessity and problems with construction Project Risk Management (PRM) practice in Serbia. Risks in the offered risk list were divided into: General Market Risks, Risks in Feasibility and Design Phase and Risk in Construction Phase and evaluated using Probability‐Impact matrix. Based on the results, the proposal is given for the development of an adv...ance planning cost and schedule performance prediction model.

Keywords:
Infrastructure / Risk / Project Risk Management
Source:
Proceedings of 11th International Conference: "Organization, Technology and Management in Construction", September 2013, Dubrovnik, Croatia, 2013, -307

ISBN: 978‐953‐7686‐03‐1

[ Google Scholar ]
Handle
https://hdl.handle.net/21.15107/rcub_grafar_2998
URI
https://grafar.grf.bg.ac.rs/handle/123456789/2998
Collections
  • Radovi istraživača / Researcher's publications
  • Катедра за управљање пројектима у грађевинарству
Institution/Community
GraFar
TY  - CONF
AU  - Mikić, Miljan
AU  - Petojević, Zorana
AU  - Ivanišević, Nenad
PY  - 2013
UR  - https://grafar.grf.bg.ac.rs/handle/123456789/2998
AB  - Infrastructure projects are usually followed by numerous standard, but also specific risks associated with project cost, schedule, quality, performance, health and safety aspects, environmental aspects, as well as with other, non‐tangible factors. They, if not timely identified, treated and controlled cause that project actual performance significantly varies from planned values. This paper presents results of a conducted infrastructure construction project risks survey for projects settled in Serbia. The survey includes evaluation of major risks in relation to infrastructure project cost and schedule performance and the analysis of usage, necessity and problems with construction Project Risk Management (PRM) practice in Serbia. Risks in the offered risk list were divided into: General Market Risks, Risks in Feasibility and Design Phase and Risk in Construction Phase and evaluated using Probability‐Impact matrix. Based on the results, the proposal is given for the development of an advance planning cost and schedule performance prediction model.
C3  - Proceedings of 11th International Conference: "Organization, Technology and Management in Construction", September 2013, Dubrovnik, Croatia
T1  - Critical risks in Serbian infrastructure projects
EP  - 307
UR  - https://hdl.handle.net/21.15107/rcub_grafar_2998
ER  - 
@conference{
author = "Mikić, Miljan and Petojević, Zorana and Ivanišević, Nenad",
year = "2013",
abstract = "Infrastructure projects are usually followed by numerous standard, but also specific risks associated with project cost, schedule, quality, performance, health and safety aspects, environmental aspects, as well as with other, non‐tangible factors. They, if not timely identified, treated and controlled cause that project actual performance significantly varies from planned values. This paper presents results of a conducted infrastructure construction project risks survey for projects settled in Serbia. The survey includes evaluation of major risks in relation to infrastructure project cost and schedule performance and the analysis of usage, necessity and problems with construction Project Risk Management (PRM) practice in Serbia. Risks in the offered risk list were divided into: General Market Risks, Risks in Feasibility and Design Phase and Risk in Construction Phase and evaluated using Probability‐Impact matrix. Based on the results, the proposal is given for the development of an advance planning cost and schedule performance prediction model.",
journal = "Proceedings of 11th International Conference: "Organization, Technology and Management in Construction", September 2013, Dubrovnik, Croatia",
title = "Critical risks in Serbian infrastructure projects",
pages = "307",
url = "https://hdl.handle.net/21.15107/rcub_grafar_2998"
}
Mikić, M., Petojević, Z.,& Ivanišević, N.. (2013). Critical risks in Serbian infrastructure projects. in Proceedings of 11th International Conference: "Organization, Technology and Management in Construction", September 2013, Dubrovnik, Croatia.
https://hdl.handle.net/21.15107/rcub_grafar_2998
Mikić M, Petojević Z, Ivanišević N. Critical risks in Serbian infrastructure projects. in Proceedings of 11th International Conference: "Organization, Technology and Management in Construction", September 2013, Dubrovnik, Croatia. 2013;:null-307.
https://hdl.handle.net/21.15107/rcub_grafar_2998 .
Mikić, Miljan, Petojević, Zorana, Ivanišević, Nenad, "Critical risks in Serbian infrastructure projects" in Proceedings of 11th International Conference: "Organization, Technology and Management in Construction", September 2013, Dubrovnik, Croatia (2013),
https://hdl.handle.net/21.15107/rcub_grafar_2998 .

DSpace software copyright © 2002-2015  DuraSpace
About the GraFar Repository | Send Feedback

OpenAIRERCUB
 

 

All of DSpaceCommunitiesAuthorsTitlesSubjectsThis institutionAuthorsTitlesSubjects

Statistics

View Usage Statistics

DSpace software copyright © 2002-2015  DuraSpace
About the GraFar Repository | Send Feedback

OpenAIRERCUB