Приказ основних података о документу

dc.creatorDeretić-Stojanović, Biljana
dc.creatorStošić, Saša
dc.creatorStošić, Božidar
dc.date.accessioned2023-01-31T14:25:42Z
dc.date.available2023-01-31T14:25:42Z
dc.date.issued2003
dc.identifier.urihttps://grafar.grf.bg.ac.rs/handle/123456789/3015
dc.description.abstractIn the conception design of the bridge over the Danube by Beska, which presents the purchased work at the international competition, besides the main bridge part over the river, the access bridge parts over the river inundation should be designed. The spans between columns for the access bridge parts, according to the conditions of the competition, were defined in advance. These spans are 45.0m. The length of the right side of the access bridge part is 180.0m and the length of the left side is 1492.55m. Since these lengths are too long, especially on the left side, the authors suggested that the access bridge parts should be designed of more composite continuous girders. The analysis of this composite construction is presented in the paper.sr
dc.language.isoensr
dc.publisherMASEsr
dc.rightsopenAccesssr
dc.rights.urihttps://creativecommons.org/licenses/by-nc-nd/4.0/
dc.sourceMACEDONIAN ASSOCIATION OF STRUCTURAL ENGINEERS - MASEsr
dc.subjectBridgde designisr
dc.subjectComposite girdersr
dc.titleАnalysis of Composite Construction of the Access Bridge Parts over the Danube by Beska, Serbiasr
dc.typeconferenceObjectsr
dc.rights.licenseBY-NC-NDsr
dc.citation.epage262
dc.citation.spage257
dc.identifier.fulltexthttp://grafar.grf.bg.ac.rs/bitstream/id/11433/Deretic-StojanovicStosicSStosicB-MASE-2003-CK-6.pdf
dc.identifier.rcubhttps://hdl.handle.net/21.15107/rcub_grafar_3015
dc.type.versionpublishedVersionsr


Документи

Thumbnail

Овај документ се појављује у следећим колекцијама

Приказ основних података о документу