GraFar - Repozitorijum Građevinskog fakulteta
Građevinski fakultet Univerziteta u Beogradu
    • English
    • Српски
    • Српски (Serbia)
  • Srpski (latinica) 
    • Engleski
    • Srpski (ćirilica)
    • Srpski (latinica)
  • Prijava
Pregled zapisa 
  •   GraFar
  • GraFar
  • Radovi istraživača / Researcher's publications
  • Pregled zapisa
  •   GraFar
  • GraFar
  • Radovi istraživača / Researcher's publications
  • Pregled zapisa
JavaScript is disabled for your browser. Some features of this site may not work without it.

Hydro energy potential of cooling water at the thermal power plant

Samo za registrovane korisnike
2011
Autori
Stevanović, Vladimir
Gajić, Aleksandar
Savić, Ljubodrag
Kuzmanović, Vladan
Arnautović, Dušan
Dašić, Tina
Maslovarić, Blaženka
Prica, Sanja
Milovanović, Bojan
Članak u časopisu (Objavljena verzija)
Metapodaci
Prikaz svih podataka o dokumentu
Apstrakt
The hydro energy of the gravity water flow from the coal-fired thermal power plant units to the river in an open cooling system of turbine condensers is determined. On the basis of statistical data for a long time period, the water net head duration curve due to the river annual level change, as well as the reduction of the hydro energy potential due to the thermal power plant overhauls periods, are evaluated in the case study of the Thermal Power Plant "Nikola Tesla B" in Serbia. A small hydro power plant is designed for the utilization of this hydro energy, and the economic benefits of the project are calculated. The internal rate of returns and pay back periods are calculated in dependence of the electricity price and total investment costs. The increase of profitability is assessed, bearing in mind that the plant might be realized as the Clean Development Mechanism project according to the Kyoto protocol. The obtained results show that the project is economically attractive, and it... can be carried out with standard matured solutions of hydro turbines available at the market. Even for the relatively low electricity price from small hydro power plants in Serbia of 0.08 epsilon/kW h the internal rate of return and the pay back period are 17.5% and 5.5 years.

Ključne reči:
Hydropower / Cooling water / Thermal power plant
Izvor:
Applied Energy, 2011, 88, 11, 4005-4013
Izdavač:
  • Elsevier Ltd
Finansiranje / projekti:
  • electric company Thermal Power Plants "Nikola Tesla"
  • Napredne analitičke, numeričke i metode analize primenjene mehanike fluida i kompleksnih sistema (RS-174014)

DOI: 10.1016/j.apenergy.2011.04.003

ISSN: 0306-2619

WoS: 000293195500047

Scopus: 2-s2.0-79959858836
[ Google Scholar ]
URI
https://grafar.grf.bg.ac.rs/handle/123456789/360
Kolekcije
  • Radovi istraživača / Researcher's publications
  • Катедра за хидротехнику и водно-еколошко инжењерство
  • Катедра за материјале и конструкције
Institucija/grupa
GraFar

DSpace software copyright © 2002-2015  DuraSpace
O repozitorijumu GraFar | Pošaljite zapažanja

OpenAIRERCUB
 

 

Kompletan repozitorijumGrupeAutoriNasloviTemeOva institucijaAutoriNasloviTeme

Statistika

Pregled statistika

DSpace software copyright © 2002-2015  DuraSpace
O repozitorijumu GraFar | Pošaljite zapažanja

OpenAIRERCUB