GraFar - Repository of the Faculty of Civil Engineering
Faculty of Civil Engineering of the University of Belgrade
    • English
    • Српски
    • Српски (Serbia)
  • English 
    • English
    • Serbian (Cyrillic)
    • Serbian (Latin)
  • Login
View Item 
  •   GraFar
  • GraFar
  • Radovi istraživača / Researcher's publications
  • View Item
  •   GraFar
  • GraFar
  • Radovi istraživača / Researcher's publications
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Metodology for construction equipment expense calculations used by the USACE

Metodologija proračuna troškova rada građevinskih mašina prema USACE

Thumbnail
2011
362.pdf (2.403Mb)
Authors
Petronijević, Predrag
Arizanović, Dragan
Ivanišević, Nenad
Article (Published version)
Metadata
Show full item record
Abstract
Estimating expenses for Construction Equipment (CE) has a key impact on the success of civil engineering projects. The nature of these expenses is such that there is a need for a lot of assumptions during the estimating process. These assumptions are later often difficult to check. The basis for accurately estimating CEcosts is accepting an appropriate methodology for calculation. The paper describes the basis of the methodology of calculation of CE costs used by the USACE and the possibility of its application outside United States.
Proračun očekivanih troškova rada mehanizacije ima ključni uticaj na uspešnost građevinskih projekata. Priroda ovih troškova je takva da se pri njihovom određivanju usvaja dosta pretpostavki čija je kasnija provera često problematična. Osnova za precizno prognoziranje troškova mehanizovanog rada je usvajanje kvalitetne metodologije proračuna. U radu je prikazana osnova metodologije proračuna troškova rada građevinskih mašina koju koristi USACE kao i mogućnost njene primene van SAD.
Keywords:
construction equipment / cost / USACE / građevinske mašine / troškovi / USACE
Source:
Izgradnja, 2011, 65, 1-2, 17-27
Publisher:
  • Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd

ISSN: 0350-5421

[ Google Scholar ]
Handle
https://hdl.handle.net/21.15107/rcub_grafar_364
URI
https://grafar.grf.bg.ac.rs/handle/123456789/364
Collections
  • Radovi istraživača / Researcher's publications
  • Катедра за управљање пројектима у грађевинарству
Institution/Community
GraFar
TY  - JOUR
AU  - Petronijević, Predrag
AU  - Arizanović, Dragan
AU  - Ivanišević, Nenad
PY  - 2011
UR  - https://grafar.grf.bg.ac.rs/handle/123456789/364
AB  - Estimating expenses for Construction Equipment (CE) has a key impact on the success of civil engineering projects. The nature of these expenses is such that there is a need for a lot of assumptions during the estimating process. These assumptions are later often difficult to check. The basis for accurately estimating CEcosts is accepting an appropriate methodology for calculation. The paper describes the basis of the methodology of calculation of CE costs used by the USACE and the possibility of its application outside United States.
AB  - Proračun očekivanih troškova rada mehanizacije ima ključni uticaj na uspešnost građevinskih projekata. Priroda ovih troškova je takva da se pri njihovom određivanju usvaja dosta pretpostavki čija je kasnija provera često problematična. Osnova za precizno prognoziranje troškova mehanizovanog rada je usvajanje kvalitetne metodologije proračuna. U radu je prikazana osnova metodologije proračuna troškova rada građevinskih mašina koju koristi USACE kao i mogućnost njene primene van SAD.
PB  - Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd
T2  - Izgradnja
T1  - Metodology for construction equipment expense calculations used by the USACE
T1  - Metodologija proračuna troškova rada građevinskih mašina prema USACE
EP  - 27
IS  - 1-2
SP  - 17
VL  - 65
UR  - https://hdl.handle.net/21.15107/rcub_grafar_364
ER  - 
@article{
author = "Petronijević, Predrag and Arizanović, Dragan and Ivanišević, Nenad",
year = "2011",
abstract = "Estimating expenses for Construction Equipment (CE) has a key impact on the success of civil engineering projects. The nature of these expenses is such that there is a need for a lot of assumptions during the estimating process. These assumptions are later often difficult to check. The basis for accurately estimating CEcosts is accepting an appropriate methodology for calculation. The paper describes the basis of the methodology of calculation of CE costs used by the USACE and the possibility of its application outside United States., Proračun očekivanih troškova rada mehanizacije ima ključni uticaj na uspešnost građevinskih projekata. Priroda ovih troškova je takva da se pri njihovom određivanju usvaja dosta pretpostavki čija je kasnija provera često problematična. Osnova za precizno prognoziranje troškova mehanizovanog rada je usvajanje kvalitetne metodologije proračuna. U radu je prikazana osnova metodologije proračuna troškova rada građevinskih mašina koju koristi USACE kao i mogućnost njene primene van SAD.",
publisher = "Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd",
journal = "Izgradnja",
title = "Metodology for construction equipment expense calculations used by the USACE, Metodologija proračuna troškova rada građevinskih mašina prema USACE",
pages = "27-17",
number = "1-2",
volume = "65",
url = "https://hdl.handle.net/21.15107/rcub_grafar_364"
}
Petronijević, P., Arizanović, D.,& Ivanišević, N.. (2011). Metodology for construction equipment expense calculations used by the USACE. in Izgradnja
Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd., 65(1-2), 17-27.
https://hdl.handle.net/21.15107/rcub_grafar_364
Petronijević P, Arizanović D, Ivanišević N. Metodology for construction equipment expense calculations used by the USACE. in Izgradnja. 2011;65(1-2):17-27.
https://hdl.handle.net/21.15107/rcub_grafar_364 .
Petronijević, Predrag, Arizanović, Dragan, Ivanišević, Nenad, "Metodology for construction equipment expense calculations used by the USACE" in Izgradnja, 65, no. 1-2 (2011):17-27,
https://hdl.handle.net/21.15107/rcub_grafar_364 .

DSpace software copyright © 2002-2015  DuraSpace
About the GraFar Repository | Send Feedback

OpenAIRERCUB
 

 

All of DSpaceCommunitiesAuthorsTitlesSubjectsThis institutionAuthorsTitlesSubjects

Statistics

View Usage Statistics

DSpace software copyright © 2002-2015  DuraSpace
About the GraFar Repository | Send Feedback

OpenAIRERCUB