GraFar - Repository of the Faculty of Civil Engineering
Faculty of Civil Engineering of the University of Belgrade
    • English
    • Српски
    • Српски (Serbia)
  • English 
    • English
    • Serbian (Cyrillic)
    • Serbian (Latin)
  • Login
View Item 
  •   GraFar
  • GraFar
  • Radovi istraživača / Researcher's publications
  • View Item
  •   GraFar
  • GraFar
  • Radovi istraživača / Researcher's publications
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Estimating minimum toll rates in Public Private Partnerships

Thumbnail
2012
459.pdf (219.0Kb)
Authors
Vajdić, Nevena
Mladenović, Goran
Queiroz, Cesar
Conference object (Published version)
Metadata
Show full item record
Abstract
Public private partnership (PPP) is a project delivery method which is used in many countries. The main advantage of this method compared with traditional methods is in the allocation of private funds which are used for providing public services and delivery of projects such as hospitals, schools, roads, and bridges. Under road PPP projects, a commonly used mechanism for the repayment of the private investment is the user charge system, i.e., charging tolls to the facility users. Although the toll rate may be set by the government, there are certain constraints which the minimum toll rate has to meet. These constraints are mainly related to financial parameters such as project's financial internal rate of return (IRR) and debt service coverage ratio (DSCR) which private investors evaluate during the decision making process. In other words, there is a minimum toll rate required to attract private investments. In addition to the financial constraints, other project's parameters such as c...onstruction cost, concession life, or level of government subsidies also have an impact on toll rates. The objective of this paper is to investigate the relationship between the level of toll rates and several project technical and financial parameters. A financial model included in the Toolkit for PPP in Roads and Highways, developed by the World Bank and the Public-Private Infrastructure Advisory Facility (PPIAF), is used as a tool to calculate toll rates for various sets of input values. The approach which was chosen to test sensitivity of selected parameters to potential changes in input values (e.g., technical and financial parameters) is by estimation of elasticities.

Keywords:
Public Private Partnerships / toll rates / elasticities
Source:
Transport Research Arena 2012, 2012, 48, 3400-3407

DOI: 10.1016/j.sbspro.2012.06.1304

ISSN: 1877-0428

WoS: 000314227503043

[ Google Scholar ]
1
URI
https://grafar.grf.bg.ac.rs/handle/123456789/461
Collections
  • Radovi istraživača / Researcher's publications
  • Катедра за путеве, аеродроме и железнице
Institution/Community
GraFar
TY  - CONF
AU  - Vajdić, Nevena
AU  - Mladenović, Goran
AU  - Queiroz, Cesar
PY  - 2012
UR  - https://grafar.grf.bg.ac.rs/handle/123456789/461
AB  - Public private partnership (PPP) is a project delivery method which is used in many countries. The main advantage of this method compared with traditional methods is in the allocation of private funds which are used for providing public services and delivery of projects such as hospitals, schools, roads, and bridges. Under road PPP projects, a commonly used mechanism for the repayment of the private investment is the user charge system, i.e., charging tolls to the facility users. Although the toll rate may be set by the government, there are certain constraints which the minimum toll rate has to meet. These constraints are mainly related to financial parameters such as project's financial internal rate of return (IRR) and debt service coverage ratio (DSCR) which private investors evaluate during the decision making process. In other words, there is a minimum toll rate required to attract private investments. In addition to the financial constraints, other project's parameters such as construction cost, concession life, or level of government subsidies also have an impact on toll rates. The objective of this paper is to investigate the relationship between the level of toll rates and several project technical and financial parameters. A financial model included in the Toolkit for PPP in Roads and Highways, developed by the World Bank and the Public-Private Infrastructure Advisory Facility (PPIAF), is used as a tool to calculate toll rates for various sets of input values. The approach which was chosen to test sensitivity of selected parameters to potential changes in input values (e.g., technical and financial parameters) is by estimation of elasticities.
C3  - Transport Research Arena 2012
T1  - Estimating minimum toll rates in Public Private Partnerships
EP  - 3407
SP  - 3400
VL  - 48
DO  - 10.1016/j.sbspro.2012.06.1304
UR  - conv_1606
ER  - 
@conference{
author = "Vajdić, Nevena and Mladenović, Goran and Queiroz, Cesar",
year = "2012",
abstract = "Public private partnership (PPP) is a project delivery method which is used in many countries. The main advantage of this method compared with traditional methods is in the allocation of private funds which are used for providing public services and delivery of projects such as hospitals, schools, roads, and bridges. Under road PPP projects, a commonly used mechanism for the repayment of the private investment is the user charge system, i.e., charging tolls to the facility users. Although the toll rate may be set by the government, there are certain constraints which the minimum toll rate has to meet. These constraints are mainly related to financial parameters such as project's financial internal rate of return (IRR) and debt service coverage ratio (DSCR) which private investors evaluate during the decision making process. In other words, there is a minimum toll rate required to attract private investments. In addition to the financial constraints, other project's parameters such as construction cost, concession life, or level of government subsidies also have an impact on toll rates. The objective of this paper is to investigate the relationship between the level of toll rates and several project technical and financial parameters. A financial model included in the Toolkit for PPP in Roads and Highways, developed by the World Bank and the Public-Private Infrastructure Advisory Facility (PPIAF), is used as a tool to calculate toll rates for various sets of input values. The approach which was chosen to test sensitivity of selected parameters to potential changes in input values (e.g., technical and financial parameters) is by estimation of elasticities.",
journal = "Transport Research Arena 2012",
title = "Estimating minimum toll rates in Public Private Partnerships",
pages = "3407-3400",
volume = "48",
doi = "10.1016/j.sbspro.2012.06.1304",
url = "conv_1606"
}
Vajdić, N., Mladenović, G.,& Queiroz, C.. (2012). Estimating minimum toll rates in Public Private Partnerships. in Transport Research Arena 2012, 48, 3400-3407.
https://doi.org/10.1016/j.sbspro.2012.06.1304
conv_1606
Vajdić N, Mladenović G, Queiroz C. Estimating minimum toll rates in Public Private Partnerships. in Transport Research Arena 2012. 2012;48:3400-3407.
doi:10.1016/j.sbspro.2012.06.1304
conv_1606 .
Vajdić, Nevena, Mladenović, Goran, Queiroz, Cesar, "Estimating minimum toll rates in Public Private Partnerships" in Transport Research Arena 2012, 48 (2012):3400-3407,
https://doi.org/10.1016/j.sbspro.2012.06.1304 .,
conv_1606 .

DSpace software copyright © 2002-2015  DuraSpace
About the GraFar Repository | Send Feedback

OpenAIRERCUB
 

 

All of DSpaceInstitutions/communitiesAuthorsTitlesSubjectsThis institutionAuthorsTitlesSubjects

Statistics

View Usage Statistics

DSpace software copyright © 2002-2015  DuraSpace
About the GraFar Repository | Send Feedback

OpenAIRERCUB