GraFar - Repository of the Faculty of Civil Engineering
Faculty of Civil Engineering of the University of Belgrade
    • English
    • Српски
    • Српски (Serbia)
  • English 
    • English
    • Serbian (Cyrillic)
    • Serbian (Latin)
  • Login
View Item 
  •   GraFar
  • GraFar
  • Radovi istraživača / Researcher's publications
  • View Item
  •   GraFar
  • GraFar
  • Radovi istraživača / Researcher's publications
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Push-out experiments of headed shear studs in group arrangements

Authorized Users Only
2013
Authors
Spremić, Milan
Marković, Zlatko
Veljković, Milan
Buđevac, Dragan
Article (Published version)
Metadata
Show full item record
Abstract
Precast concrete slabs connected to the steel beams by headed shear studs arranged in groups may be used in high-rise office buildings to speed up construction process and improve quality by increasing the grade of industrialization. The paper presents experimental research performed on push-out tests at the Faculty of Civil Engineering University in Belgrade. The main goal has been to investigate possible reductions of shear stiffness and strength of five group arrangements consisting always of four headed shear studs, the shank diameter 16 mm and 100 mm height. A shape of group arrangement and its orientation to the applied load, and distance between the studs were variables considered. Intention was to have as small as possible holes in precast concrete slabs so the distance between studs was lower than minimum required in Eurocode 4. Comparison is made with results obtained on specimen with uniformly distributed shear studs, according to requirements of the standard arrangement. Ma...terial characteristics were obtained and push-out tests were preformed in procedures that fully comply with Eurocode 4. Experimental results were evaluated according to the design models in Eurocode 4 and available literature. Recommendations for use of the group arrangements were proposed.

Keywords:
Headed studs / Group arrangement of stud connectors / Steel-concrete composite beams / Prefabricated concrete slab
Source:
Advanced Steel Construction, 2013, 9, 2, 139-160
Funding / projects:
  • "MB steel" Ltd.
  • GEMAX Concrete Production Ltd., Belgrade

ISSN: 1816-112X

WoS: 000319720100004

[ Google Scholar ]
28
Handle
https://hdl.handle.net/21.15107/rcub_grafar_517
URI
https://grafar.grf.bg.ac.rs/handle/123456789/517
Collections
  • Radovi istraživača / Researcher's publications
  • Катедра за материјале и конструкције
Institution/Community
GraFar
TY  - JOUR
AU  - Spremić, Milan
AU  - Marković, Zlatko
AU  - Veljković, Milan
AU  - Buđevac, Dragan
PY  - 2013
UR  - https://grafar.grf.bg.ac.rs/handle/123456789/517
AB  - Precast concrete slabs connected to the steel beams by headed shear studs arranged in groups may be used in high-rise office buildings to speed up construction process and improve quality by increasing the grade of industrialization. The paper presents experimental research performed on push-out tests at the Faculty of Civil Engineering University in Belgrade. The main goal has been to investigate possible reductions of shear stiffness and strength of five group arrangements consisting always of four headed shear studs, the shank diameter 16 mm and 100 mm height. A shape of group arrangement and its orientation to the applied load, and distance between the studs were variables considered. Intention was to have as small as possible holes in precast concrete slabs so the distance between studs was lower than minimum required in Eurocode 4. Comparison is made with results obtained on specimen with uniformly distributed shear studs, according to requirements of the standard arrangement. Material characteristics were obtained and push-out tests were preformed in procedures that fully comply with Eurocode 4. Experimental results were evaluated according to the design models in Eurocode 4 and available literature. Recommendations for use of the group arrangements were proposed.
T2  - Advanced Steel Construction
T1  - Push-out experiments of headed shear studs in group arrangements
EP  - 160
IS  - 2
SP  - 139
VL  - 9
UR  - https://hdl.handle.net/21.15107/rcub_grafar_517
ER  - 
@article{
author = "Spremić, Milan and Marković, Zlatko and Veljković, Milan and Buđevac, Dragan",
year = "2013",
abstract = "Precast concrete slabs connected to the steel beams by headed shear studs arranged in groups may be used in high-rise office buildings to speed up construction process and improve quality by increasing the grade of industrialization. The paper presents experimental research performed on push-out tests at the Faculty of Civil Engineering University in Belgrade. The main goal has been to investigate possible reductions of shear stiffness and strength of five group arrangements consisting always of four headed shear studs, the shank diameter 16 mm and 100 mm height. A shape of group arrangement and its orientation to the applied load, and distance between the studs were variables considered. Intention was to have as small as possible holes in precast concrete slabs so the distance between studs was lower than minimum required in Eurocode 4. Comparison is made with results obtained on specimen with uniformly distributed shear studs, according to requirements of the standard arrangement. Material characteristics were obtained and push-out tests were preformed in procedures that fully comply with Eurocode 4. Experimental results were evaluated according to the design models in Eurocode 4 and available literature. Recommendations for use of the group arrangements were proposed.",
journal = "Advanced Steel Construction",
title = "Push-out experiments of headed shear studs in group arrangements",
pages = "160-139",
number = "2",
volume = "9",
url = "https://hdl.handle.net/21.15107/rcub_grafar_517"
}
Spremić, M., Marković, Z., Veljković, M.,& Buđevac, D.. (2013). Push-out experiments of headed shear studs in group arrangements. in Advanced Steel Construction, 9(2), 139-160.
https://hdl.handle.net/21.15107/rcub_grafar_517
Spremić M, Marković Z, Veljković M, Buđevac D. Push-out experiments of headed shear studs in group arrangements. in Advanced Steel Construction. 2013;9(2):139-160.
https://hdl.handle.net/21.15107/rcub_grafar_517 .
Spremić, Milan, Marković, Zlatko, Veljković, Milan, Buđevac, Dragan, "Push-out experiments of headed shear studs in group arrangements" in Advanced Steel Construction, 9, no. 2 (2013):139-160,
https://hdl.handle.net/21.15107/rcub_grafar_517 .

DSpace software copyright © 2002-2015  DuraSpace
About the GraFar Repository | Send Feedback

OpenAIRERCUB
 

 

All of DSpaceCommunitiesAuthorsTitlesSubjectsThis institutionAuthorsTitlesSubjects

Statistics

View Usage Statistics

DSpace software copyright © 2002-2015  DuraSpace
About the GraFar Repository | Send Feedback

OpenAIRERCUB