dc.description.abstractThe behavior of reinforced concrete under long-term loading is an important topic when designing concrete structures. Creep and shrinkage of concrete and long-term deflections of concrete structures, mainly reinforced concrete beams, have been studied for many decades but because of the long-term nature of these tests, existing experiments are relatively scarce. More importantly, there are significant challenges when carrying out these tests. These include achieving optimal beam design to ensure a realistic stress distribution with a developed cracked state, measuring deflections from self-weight, adequately measuring elastic deflections and strains, and instantaneously applying the imposed load. The problem is exacerbated with the advent of sustainable structural concretes containing recycled and waste materials-green concretes; they possess specific properties and experimental results for these concretes are even scarcer. In this paper, an experimental setup, designed to test the structural behavior of reinforced concrete beams in a four-point bending test under long-term loading, is described. Six full-scale beams were produced from natural aggregate concrete, recycled aggregate concrete and high-volume fly ash concrete-two beams from each concrete type, one loaded after 7 and the other after 28 days. The load consisted of beam self-weight and imposed permanent load. The beam design procedure is explained, which enabled an adequate stress distribution and crack formation with a minimum imposed load. A method was developed to use geodetic equipment and measurements to determine the deflection from self-weight and a special support and loading structure were designed to enable instant imposed load application and the measurement of elastic deflections and strains. The complete test setup, equipment and procedure are explained and the advantages and deficiencies of this approach are discussed.en
dc.publisherSpringer International Publishing
dc.rightsrestrictedAccess
dc.sourceHigh Tech Concrete: Where Technology and Engineering Meet - Proceedings of the 2017 fib Symposium
dc.subjectFly ashen
dc.subjectLong-term deflectionsen
dc.subjectRecycled concrete aggregateen
dc.subjectReinforced concrete beamsen
dc.subjectTestingen
dc.titleExperimental setup for measuring long-term behavior of green reinforced concrete beamsen
dc.typeconferenceObject
dc.rights.licenseARR
dc.citation.epage2364
dc.citation.other: 2356-2364
dc.citation.spage2356
dc.identifier.doi10.1007/978-3-319-59471-2_268
dc.identifier.scopus2-s2.0-85025625082
dc.identifier.wos000550253300269
dc.type.versionpublishedVersion


Files in this item

FilesSizeFormatView

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record