GraFar - repozitorijum Građevinskog fakulteta
Građevinski fakultet Univerziteta u Beogradu
    • English
    • Српски
    • Српски (Serbia)
  • Srpski (latinica) 
    • Engleski
    • Srpski (ćirilica)
    • Srpski (latinica)
  • Prijava
Pregled rada 
  •   GraFar - repozitorijum Građevinskog fakulteta
  • GraFar
  • Radovi istraživača / Researcher's publications
  • Pregled rada
  •   GraFar - repozitorijum Građevinskog fakulteta
  • GraFar
  • Radovi istraživača / Researcher's publications
  • Pregled rada
JavaScript is disabled for your browser. Some features of this site may not work without it.

Application of fuzzy AHP for ranking and selection of alternatives in construction project management

Thumbnail
2017
860.pdf (2.829Mb)
Autori
Praščević, Nataša
Praščević, Živojin
Članak u časopisu (Objavljena verzija)
Metapodaci
Prikaz svih podataka o dokumentu
Apstrakt
The construction project management (CPM) is very important and large segment of entire project management (PM). Realisation of construction projects is usually long term process which requests significant financial, material, human and other resources to fulfil contracted obligations and achieve a good quality of works. Therefore, making good decisions with the satisfaction of various criteria is one of the main conditions to achieve planed business objectives and finish the project in contracted time with good quality. This paper proposes a new procedure for determination of the weights of criteria and alternatives in the Fuzzy analytic hierarchy process (FAHP) with trapezoidal fuzzy number using a new method for finding eigenvelues and eigenvectors of the criteria and alternatives, which is based on expected values of the fuzzy numbers and their products. Local and global fuzzy weights of the alternatives are determined using linear programming. In the paper a formula for ranking fu...zzy numbers by reduced generalized fuzzy mean is also proposed, since ranking by the coefficient of variation is not always reliable. In the presented case study, applying proposed method, from imprecise input data are obtained enough accurate and useful results for rational ranking of alternatives related to the project realization.

Ključne reči:
fuzzy AHP / trapezoidal fuzzy numbers / fuzzy eigenvalue / ranking alternatives / multi-criteria decision making / construction project management
Izvor:
Journal of Civil Engineering and Management, 2017, 23, 8, 1123-1135
Izdavač:
  • Taylor and Francis Ltd.

DOI: 10.3846/13923730.2017.1388278

ISSN: 1392-3730

WoS: 000419971800013

Scopus: 2-s2.0-85038807036
[ Google Scholar ]
24
21
URI
http://grafar.grf.bg.ac.rs/handle/123456789/862
Kolekcije
  • Radovi istraživača / Researcher's publications
  • Катедра за управљање пројектима у грађевинарству
Institucija
GraFar
TY  - JOUR
AU  - Praščević, Nataša
AU  - Praščević, Živojin
PY  - 2017
UR  - http://grafar.grf.bg.ac.rs/handle/123456789/862
AB  - The construction project management (CPM) is very important and large segment of entire project management (PM). Realisation of construction projects is usually long term process which requests significant financial, material, human and other resources to fulfil contracted obligations and achieve a good quality of works. Therefore, making good decisions with the satisfaction of various criteria is one of the main conditions to achieve planed business objectives and finish the project in contracted time with good quality. This paper proposes a new procedure for determination of the weights of criteria and alternatives in the Fuzzy analytic hierarchy process (FAHP) with trapezoidal fuzzy number using a new method for finding eigenvelues and eigenvectors of the criteria and alternatives, which is based on expected values of the fuzzy numbers and their products. Local and global fuzzy weights of the alternatives are determined using linear programming. In the paper a formula for ranking fuzzy numbers by reduced generalized fuzzy mean is also proposed, since ranking by the coefficient of variation is not always reliable. In the presented case study, applying proposed method, from imprecise input data are obtained enough accurate and useful results for rational ranking of alternatives related to the project realization.
PB  - Taylor and Francis Ltd.
T2  - Journal of Civil Engineering and Management
T1  - Application of fuzzy AHP for ranking and selection of alternatives in construction project management
EP  - 1135
IS  - 8
SP  - 1123
VL  - 23
DO  - 10.3846/13923730.2017.1388278
ER  - 
@article{
author = "Praščević, Nataša and Praščević, Živojin",
year = "2017",
url = "http://grafar.grf.bg.ac.rs/handle/123456789/862",
abstract = "The construction project management (CPM) is very important and large segment of entire project management (PM). Realisation of construction projects is usually long term process which requests significant financial, material, human and other resources to fulfil contracted obligations and achieve a good quality of works. Therefore, making good decisions with the satisfaction of various criteria is one of the main conditions to achieve planed business objectives and finish the project in contracted time with good quality. This paper proposes a new procedure for determination of the weights of criteria and alternatives in the Fuzzy analytic hierarchy process (FAHP) with trapezoidal fuzzy number using a new method for finding eigenvelues and eigenvectors of the criteria and alternatives, which is based on expected values of the fuzzy numbers and their products. Local and global fuzzy weights of the alternatives are determined using linear programming. In the paper a formula for ranking fuzzy numbers by reduced generalized fuzzy mean is also proposed, since ranking by the coefficient of variation is not always reliable. In the presented case study, applying proposed method, from imprecise input data are obtained enough accurate and useful results for rational ranking of alternatives related to the project realization.",
publisher = "Taylor and Francis Ltd.",
journal = "Journal of Civil Engineering and Management",
title = "Application of fuzzy AHP for ranking and selection of alternatives in construction project management",
pages = "1135-1123",
number = "8",
volume = "23",
doi = "10.3846/13923730.2017.1388278"
}
Praščević N, Praščević Ž. Application of fuzzy AHP for ranking and selection of alternatives in construction project management. Journal of Civil Engineering and Management. 2017;23(8):1123-1135
Praščević, N.,& Praščević, Ž. (2017). Application of fuzzy AHP for ranking and selection of alternatives in construction project management.
Journal of Civil Engineering and ManagementTaylor and Francis Ltd.., 23(8), 1123-1135.
https://doi.org/10.3846/13923730.2017.1388278
Praščević Nataša, Praščević Živojin, "Application of fuzzy AHP for ranking and selection of alternatives in construction project management" 23, no. 8 (2017):1123-1135,
https://doi.org/10.3846/13923730.2017.1388278 .

DSpace software copyright © 2002-2015  DuraSpace
O GraFaru – Repozitorijumu Građevinskog fakulteta | Pošaljite zapažanja

OpenAIRERCUB
 

 

Kompletan repozitorijumInstitucijeAutoriNasloviTemeOva institucijaAutoriNasloviTeme

Statistika

Pregled statistika

DSpace software copyright © 2002-2015  DuraSpace
O GraFaru – Repozitorijumu Građevinskog fakulteta | Pošaljite zapažanja

OpenAIRERCUB