GraFar - Repository of the Faculty of Civil Engineering
Faculty of Civil Engineering of the University of Belgrade
    • English
    • Српски
    • Српски (Serbia)
  • English 
    • English
    • Serbian (Cyrillic)
    • Serbian (Latin)
  • Login
View Item 
  •   GraFar
  • GraFar
  • Radovi istraživača / Researcher's publications
  • View Item
  •   GraFar
  • GraFar
  • Radovi istraživača / Researcher's publications
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Comparative Analysis of Alternative Solutions of Excavation for Section of Hydropower Tunnel HPP "Dabar"

No Thumbnail
Authors
Mirković, Uroš B.
Radovanović, Slobodan
Divac, Ljubo
Mirković, Nikola
Obradović, Nikola
Popović, Zdenka
Conference object (Published version)
Metadata
Show full item record
Abstract
The subject of this paper is a comparative analysis of the alternative solutions for the construction of the supply tunnel section of HPP "Dabar" from km 4 + 272.54 to km 12 + 125.0 with the application of TBM technology, milling machines technology and combinations of TBM technology and milling machines. Hydraulic tunnel of the HPP "Dabar" is a tunnel under the pressure with a length of 12125.0 m, which will conduct water from the reservoir Nevesinje to the machine building of the hydropower plant "Dabar" in Dabarsko polje (Republic of Srpska, Bosnia and Herzegovina). Four different construction alternatives of the mentioned tunnel section were analysed: use of milling machines, use of Gripper TBM, use of Double Shield TBM, a combination of Gripper TBM and milling machines.
Keywords:
Supply tunnel / Alternative solutions / Excavation / TBM / Analysis
Source:
International Scientific Conference Energy Management of Municipal Transportation Facilities and Tra, 2018, 692, 1055-1064
Publisher:
  • Springer Verlag

DOI: 10.1007/978-3-319-70987-1_114

ISSN: 2194-5357

WoS: 000436502300114

Scopus: 2-s2.0-85039424999
[ Google Scholar ]
URI
https://grafar.grf.bg.ac.rs/handle/123456789/933
Collections
  • Radovi istraživača / Researcher's publications
  • Катедра за грађевинску геотехнику
  • Катедра за путеве, аеродроме и железнице
Institution/Community
GraFar
TY  - CONF
AU  - Mirković, Uroš B.
AU  - Radovanović, Slobodan
AU  - Divac, Ljubo
AU  - Mirković, Nikola
AU  - Obradović, Nikola
AU  - Popović, Zdenka
PY  - 2018
UR  - https://grafar.grf.bg.ac.rs/handle/123456789/933
AB  - The subject of this paper is a comparative analysis of the alternative solutions for the construction of the supply tunnel section of HPP "Dabar" from km 4 + 272.54 to km 12 + 125.0 with the application of TBM technology, milling machines technology and combinations of TBM technology and milling machines. Hydraulic tunnel of the HPP "Dabar" is a tunnel under the pressure with a length of 12125.0 m, which will conduct water from the reservoir Nevesinje to the machine building of the hydropower plant "Dabar" in Dabarsko polje (Republic of Srpska, Bosnia and Herzegovina). Four different construction alternatives of the mentioned tunnel section were analysed: use of milling machines, use of Gripper TBM, use of Double Shield TBM, a combination of Gripper TBM and milling machines.
PB  - Springer Verlag
C3  - International Scientific Conference Energy Management of Municipal Transportation Facilities and Tra
T1  - Comparative Analysis of Alternative Solutions of Excavation for Section of Hydropower Tunnel HPP "Dabar"
EP  - 1064
SP  - 1055
VL  - 692
DO  - 10.1007/978-3-319-70987-1_114
ER  - 
@conference{
author = "Mirković, Uroš B. and Radovanović, Slobodan and Divac, Ljubo and Mirković, Nikola and Obradović, Nikola and Popović, Zdenka",
year = "2018",
abstract = "The subject of this paper is a comparative analysis of the alternative solutions for the construction of the supply tunnel section of HPP "Dabar" from km 4 + 272.54 to km 12 + 125.0 with the application of TBM technology, milling machines technology and combinations of TBM technology and milling machines. Hydraulic tunnel of the HPP "Dabar" is a tunnel under the pressure with a length of 12125.0 m, which will conduct water from the reservoir Nevesinje to the machine building of the hydropower plant "Dabar" in Dabarsko polje (Republic of Srpska, Bosnia and Herzegovina). Four different construction alternatives of the mentioned tunnel section were analysed: use of milling machines, use of Gripper TBM, use of Double Shield TBM, a combination of Gripper TBM and milling machines.",
publisher = "Springer Verlag",
journal = "International Scientific Conference Energy Management of Municipal Transportation Facilities and Tra",
title = "Comparative Analysis of Alternative Solutions of Excavation for Section of Hydropower Tunnel HPP "Dabar"",
pages = "1064-1055",
volume = "692",
doi = "10.1007/978-3-319-70987-1_114"
}
Mirković, U. B., Radovanović, S., Divac, L., Mirković, N., Obradović, N.,& Popović, Z.. (2018). Comparative Analysis of Alternative Solutions of Excavation for Section of Hydropower Tunnel HPP "Dabar". in International Scientific Conference Energy Management of Municipal Transportation Facilities and Tra
Springer Verlag., 692, 1055-1064.
https://doi.org/10.1007/978-3-319-70987-1_114
Mirković UB, Radovanović S, Divac L, Mirković N, Obradović N, Popović Z. Comparative Analysis of Alternative Solutions of Excavation for Section of Hydropower Tunnel HPP "Dabar". in International Scientific Conference Energy Management of Municipal Transportation Facilities and Tra. 2018;692:1055-1064.
doi:10.1007/978-3-319-70987-1_114 .
Mirković, Uroš B., Radovanović, Slobodan, Divac, Ljubo, Mirković, Nikola, Obradović, Nikola, Popović, Zdenka, "Comparative Analysis of Alternative Solutions of Excavation for Section of Hydropower Tunnel HPP "Dabar"" in International Scientific Conference Energy Management of Municipal Transportation Facilities and Tra, 692 (2018):1055-1064,
https://doi.org/10.1007/978-3-319-70987-1_114 . .

DSpace software copyright © 2002-2015  DuraSpace
About the GraFar Repository | Send Feedback

OpenAIRERCUB
 

 

All of DSpaceCommunitiesAuthorsTitlesSubjectsThis institutionAuthorsTitlesSubjects

Statistics

View Usage Statistics

DSpace software copyright © 2002-2015  DuraSpace
About the GraFar Repository | Send Feedback

OpenAIRERCUB