Comparative Analysis of Alternative Solutions of Excavation for Section of Hydropower Tunnel HPP "Dabar"
Нема приказа
Аутори
Mirković, Uroš B.Radovanović, Slobodan
Divac, Ljubo
Mirković, Nikola
Obradović, Nikola
Popović, Zdenka
Конференцијски прилог (Објављена верзија)
Метаподаци
Приказ свих података о документуАпстракт
The subject of this paper is a comparative analysis of the alternative solutions for the construction of the supply tunnel section of HPP "Dabar" from km 4 + 272.54 to km 12 + 125.0 with the application of TBM technology, milling machines technology and combinations of TBM technology and milling machines. Hydraulic tunnel of the HPP "Dabar" is a tunnel under the pressure with a length of 12125.0 m, which will conduct water from the reservoir Nevesinje to the machine building of the hydropower plant "Dabar" in Dabarsko polje (Republic of Srpska, Bosnia and Herzegovina). Four different construction alternatives of the mentioned tunnel section were analysed: use of milling machines, use of Gripper TBM, use of Double Shield TBM, a combination of Gripper TBM and milling machines.
Кључне речи:
Supply tunnel / Alternative solutions / Excavation / TBM / AnalysisИзвор:
International Scientific Conference Energy Management of Municipal Transportation Facilities and Tra, 2018, 692, 1055-1064Издавач:
- Springer Verlag
DOI: 10.1007/978-3-319-70987-1_114
ISSN: 2194-5357
WoS: 000436502300114
Scopus: 2-s2.0-85039424999
Колекције
Институција/група
GraFarTY - CONF AU - Mirković, Uroš B. AU - Radovanović, Slobodan AU - Divac, Ljubo AU - Mirković, Nikola AU - Obradović, Nikola AU - Popović, Zdenka PY - 2018 UR - https://grafar.grf.bg.ac.rs/handle/123456789/933 AB - The subject of this paper is a comparative analysis of the alternative solutions for the construction of the supply tunnel section of HPP "Dabar" from km 4 + 272.54 to km 12 + 125.0 with the application of TBM technology, milling machines technology and combinations of TBM technology and milling machines. Hydraulic tunnel of the HPP "Dabar" is a tunnel under the pressure with a length of 12125.0 m, which will conduct water from the reservoir Nevesinje to the machine building of the hydropower plant "Dabar" in Dabarsko polje (Republic of Srpska, Bosnia and Herzegovina). Four different construction alternatives of the mentioned tunnel section were analysed: use of milling machines, use of Gripper TBM, use of Double Shield TBM, a combination of Gripper TBM and milling machines. PB - Springer Verlag C3 - International Scientific Conference Energy Management of Municipal Transportation Facilities and Tra T1 - Comparative Analysis of Alternative Solutions of Excavation for Section of Hydropower Tunnel HPP "Dabar" EP - 1064 SP - 1055 VL - 692 DO - 10.1007/978-3-319-70987-1_114 ER -
@conference{ author = "Mirković, Uroš B. and Radovanović, Slobodan and Divac, Ljubo and Mirković, Nikola and Obradović, Nikola and Popović, Zdenka", year = "2018", abstract = "The subject of this paper is a comparative analysis of the alternative solutions for the construction of the supply tunnel section of HPP "Dabar" from km 4 + 272.54 to km 12 + 125.0 with the application of TBM technology, milling machines technology and combinations of TBM technology and milling machines. Hydraulic tunnel of the HPP "Dabar" is a tunnel under the pressure with a length of 12125.0 m, which will conduct water from the reservoir Nevesinje to the machine building of the hydropower plant "Dabar" in Dabarsko polje (Republic of Srpska, Bosnia and Herzegovina). Four different construction alternatives of the mentioned tunnel section were analysed: use of milling machines, use of Gripper TBM, use of Double Shield TBM, a combination of Gripper TBM and milling machines.", publisher = "Springer Verlag", journal = "International Scientific Conference Energy Management of Municipal Transportation Facilities and Tra", title = "Comparative Analysis of Alternative Solutions of Excavation for Section of Hydropower Tunnel HPP "Dabar"", pages = "1064-1055", volume = "692", doi = "10.1007/978-3-319-70987-1_114" }
Mirković, U. B., Radovanović, S., Divac, L., Mirković, N., Obradović, N.,& Popović, Z.. (2018). Comparative Analysis of Alternative Solutions of Excavation for Section of Hydropower Tunnel HPP "Dabar". in International Scientific Conference Energy Management of Municipal Transportation Facilities and Tra Springer Verlag., 692, 1055-1064. https://doi.org/10.1007/978-3-319-70987-1_114
Mirković UB, Radovanović S, Divac L, Mirković N, Obradović N, Popović Z. Comparative Analysis of Alternative Solutions of Excavation for Section of Hydropower Tunnel HPP "Dabar". in International Scientific Conference Energy Management of Municipal Transportation Facilities and Tra. 2018;692:1055-1064. doi:10.1007/978-3-319-70987-1_114 .
Mirković, Uroš B., Radovanović, Slobodan, Divac, Ljubo, Mirković, Nikola, Obradović, Nikola, Popović, Zdenka, "Comparative Analysis of Alternative Solutions of Excavation for Section of Hydropower Tunnel HPP "Dabar"" in International Scientific Conference Energy Management of Municipal Transportation Facilities and Tra, 692 (2018):1055-1064, https://doi.org/10.1007/978-3-319-70987-1_114 . .