Examples of housing rehabilitation multistory masonry buildings damaged in the earthquake in Kraljevo / Primeri sanacije višespratnih stambenih zidanih zgrada oštećenih zemljotresom u Kraljevu
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2011)
The earthquake that struck Kraljevo and its surroundings 3/11/2010. The damage was to a greater or lesser extent, many buildings. Objects that are relatively new and are designed and constructed in accordance with the ...
Flood control of tailings-dam reservoirs / Problemi evakuacije velikih voda iz jalovišnih akumulacija
(Jugoslovensko društvo za odvodnjavanje i navodnjavanje, Beograd, 2017)
This paper analyzes the problems of flood control for the tailings-dams reservoirs, having in mind the significant rise of the flow and volume of observed flood waves, and increasingly stringent criteria for safety of high ...
The old stone bridge in Mostar dedicated to the memory of prof. Dr Milan-Gile Gojkovic / Stari kameni most u Mostaru posvećeno sećanju na prof. Dr Milana - Gileta Gojkovića
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2011)
Prof. dr Milan Gojković rođen je 15.08.1926. godine u Beogradu, gde je završio osnovnu i srednju školu. Na Građevinski odsek Tehničkog fakulteta u Beogradu upisao se 1946. godine, i diplomirao u januaru 1953. godine. ...
Shrinkage of recycled aggregate concrete / Skupljanje betona na bazi recikliranog agregata
(Savez inženjera i tehničara Srbije, Beograd, 2013)
The application of recycled concrete aggregate in concrete structures is necessary for the achievement of sustainable construction and a reduction in the negative environmental impacts. This paper presents the most significant ...
Estimating double side-channel spillway capacity / Procena propusne moći dvostrukog bočnog preliva
(Udruženje za tehnologiju vode i sanitarno inžinjerstvo, Beograd, 2009)
The capacity of the double side-channel spillway, consisting of the two spillways, with channels joining into a common single branch, is estimated in this paper. For the specific site conditions, such an arrangement may ...
Estimating the capacity of double side-channel spillways / Procena propusne moći dvostrukog bočnog preliva
(Jugoslovensko društvo za odvodnjavanje i navodnjavanje, Beograd, 2009)
A double side-channel spillway consists of two spillways, with channels joining into a common single branch, noting that for some specific site conditions such arrangements may suit better than the conventional one-side-channel ...
Wind towers: Design of friction connections for assembling sections of tubular steel towers / Vetrogeneratori - proračun tarnog spoja kao montažnog nastavka cilindričnog čeličnog tornja
(Institut za istraživanja i projektovanja u privredi, Beograd, 2012)
The towers represent about 15 to 20% of the total installation costs and optimized design may therefore lead to substantial savings with regard to costs and use of materials. Some of the most interesting design and ...
Hydraulic design of morning glory spillway with a deflector upstream of the vertical bend / Određivanje dimenzija šahtnog preliva empirijskim jednačinama
(Jugoslovensko društvo za odvodnjavanje i navodnjavanje, Beograd, 2012)
Hydraulic design of shaft spillways (morning-glory spillways) with flow deflector before the vertical bend is considered. Based on the physical hydraulic model investigations of several structures and available experience ...
Stresses in the upstream cutoff zone of concrete gravity dams / Naponsko stanje u zoni uzvodnog zuba gravitacione betonske brane
(Jugoslovensko društvo za odvodnjavanje i navodnjavanje, Beograd, 2011)
Upstream cutoff in the concrete gravity dam foundation is introduced as a general stability measure in the beginning of the 20-th century. It become widely accepted in design practice in the late 50-ties. Nevertheless, ...
Uporedna analiza betonskog integralnog nadputnjaka pri različitim karakteristikama tla
(Savez inženjera i tehničara Srbije, Beograd, 2022)
U okviru rada razmatran je betonski integralni nadputnjak raspona 30 metara na magistralnom putu koji je fundiran na šipovima. Analiziran je uticaj krutosti tla na vrednosti statičkih uticaja merodavnih za dimenzionisanje ...