Numerical modeling of water temperature changes in reservoir Celije / Modeliranje sezonskih promena temperature vode akumulacije Ćelije
(Udruženje za tehnologiju vode i sanitarno inžinjerstvo, Beograd, 2013)
This paper presents the results of measurements and numerical modeling of water temperature changes in reservoir Celije in the period from April to October 2012. Reservoir Celije on the river Rasina, for many years attracts ...
Improvement of chemical control in the water-steam cycle of thermal power plants
(Applied Thermal Engineering, 2011)
A more effective chemical control in the water-steam cycle (WSC) of thermal power plants (TPP) is proposed in this paper. Minimization of corrosion effects by the production of ultra pure water and its strict control is ...
Field measurement of small velocities / Merenje malih brzina u terenskim uslovima
(Jugoslovensko društvo za odvodnjavanje i navodnjavanje, Beograd, 2006)
The application of 2D and 3D Computational Fluid Dynamics (CFD) modeling in open river flow is gaining in its popularity, especially in the field of sediment deposition on the river confluences and bay entrances. The ...
Uncertainties in stream gauging discharge measurements / Neizvesnosti u rezultatima hidrometrijskih merenja protoka
(Građevinski fakultet Subotica, Subotica, 2015)
Measurements, calibration of rainfall-runoff models and assessment of the return period of flooding events at urban catchment Kumodraž in Belgrade
(IWA Publishing, 2002)
For the purpose of re-design and improvement of the combined sewer system at the Kumodraz catchment in Belgrade, measurements of rainfall and runoff at the catchment were established in late 1997. Observed data are used ...
Ultrasonic flow measurement method: Working principles and use in water distribution and sewer systems / Ultrazvučna merila protoka u sistemima vodovoda i kanalizacije
(Udruženje za tehnologiju vode i sanitarno inžinjerstvo, Beograd, 2007)
Flow metering in Water Supply and Sewer Systems (WSSS) is the essential need Technical reason are the water balance control and the operational management. In the scope of inevitable privatizations (in Serbian environment) ...
Goethite nanoparticles impregnated cross-linked macroporous polymer for arsenic removal: fullscale system modeling
(Abstracts of Papers of the American Chemical Society, 2015)
Scale Modelling of the RCC Dam with Stepped Spillway / Hidraulička modelska ispitivanja brane sa stepenastim brzotokom
(Građevinski fakultet, Subotica, 2014)
Design of an RCC (roller-compacted concrete) dam had been verified using a scale model. The scale of the model was 1:40 and hydraulic parameters were scaled using Froude similarity. The aim of investigations were flood ...
Scale modeling of the Bouzina Dam flood mitigation structures
(Serbian Water Pollution Control Society, Belgrade, 2014)
The design of the RCC (roller-compacted concrete) Bouzina Dam (Batna Province, Algeria) was verified using a scale model. The length scale of the physical model was 1:40 and the hydraulic parameters were scaled applying ...
Analysis of hydrodynamic pressures in the stilling basin of an earth dam
(Serbian Water Pollution Control Society, Belgrade, 2015)
The stilling basin is one of the most frequently used energy dissipation structures due to highly-efficient energy dissipation of the main stream through the secondary turbulent flow in the hydraulic jump roller formed ...