Current Serbian design codes: Transferring from a deterministic to a semi- probabilistic approach / Trenutni srpski propisi za proračun - prelazak sa determinističkog na polu-probabilistički pristup
(Savez inženjera i tehničara Srbije, Beograd, 2015)
The Serbian design code for reinforced concrete structures is somewhat out-of-date in its approach to structural design. In this paper, a study into the possible transition to a semi-probabilistic approach is presented. ...
Application of fuzzy AHP for ranking and selection of alternatives in construction project management
(Taylor and Francis Ltd., 2017)
The construction project management (CPM) is very important and large segment of entire project management (PM). Realisation of construction projects is usually long term process which requests significant financial, ...
Claim management according to PMI standard
(XX Internacionalni simpozijum iz projektnog menadžmenta ''Značaj projektnog menadžmenta prvih 30 godina YUPMA i 50 godina IPMA'', 2016)
S obzirom na to da je svaki građevinski projekat unikatan, često dolazi do neslaganja između ugovorenih i planiranih parametara realizacije posla. Takva situacija obično dovodi do nastanka odštetnog zahteva. Izuzetno je ...
Ground improvement - mixed in place (MIP) technique
(Macedonian Association of Structural Engineers, Skopje, 2015)
Application of geosyntetics in the function of environmental protection
(Zbornik radova 5. međunarodne konferencije Savremena dostignuća u građevinarstvu 2017, 2017)
The processes of industrialization and urbanization, apart from positively reflecting on the overall progress of a society, also have the increase of communal waste as a consequence. At the same time, these processes ...
Application of modified fuzzy TOPSIS method for multicriteria decisions in civil engineering / Primena modifikovanog rasplinutog TOPSIS metoda za višekriterijumske odluke u građevinarstvu
(Društvo za ispitivanje i istraživanje materijala i konstrukcija Srbije, Beograd, 2014)
In this paper is presented and applied one fuzzy TOPSIS method for the multicriteria ranking of objects for reconstruction and maintenance. At the beginning is given short review on the genesis and development of this ...
Kvalitativna analiza rizika sa mogućim uticajem na finansijsku, ekonomsku, društvenu i ekološku održivost projekta studija slučaja izgradnje autoputa E-80, Niš-Dimitrovgrad
(Srpsko društvo za puteve ''Via-Vita'', Beograd, 2016)
Previous research shows that, despite the importance of large infrastructure projects, their implementation is often unsuccessful, both in terms of failure to meet the traditional project success criteria (cost, time, ...
Information systems in construction industry / Informacioni sistemi u građevinarstvu
(Savez građevinskih inženjera Srbije, Beograd, 2014)
Information system for planning and control of project realization in construction industry is analyzed in the paper. Application of information technology in the construction industry is emphasized at the beginning of ...