The Successful Delivery of Megaprojects: A Novel Research Method
(SAGE Publications Inc., 2017)
Megaprojects are often associated with poor delivery performance and poor benefits realization. This article provides a method of identifying, in a quantitative and rigorous manner, the characteristics related to project ...
Method in planning construction machinery replacement
(Građevinski fakultet u Subotici, 2018)
One basic criteria for determining the replacement time of construction
machinery is based on the age , that is, the increase in operating costs of the machine
with time. The key factor which determines and justifies ...
Standard in project management - ANSI/PMI 99-001- 2008 brief presentation
(Univerzitet Crne Gore, Građevinski fakultet, 2012)
Project management has evolved over time, becoming the principal mean of dealing with change in modern organizations. Best practices have occurred as a result of business evolution and of practicing project management at ...
Uvođenje BIM-а u nastavu na Građevinskom fakultetu Univerziteta u Beogradu
(iNDiS, 2018)
Ogroman napredak informacionih tehnologija i sredstava komunikacije poslednjih decenija prožima mnoge sfere društva. U građevinskoj industriji, koju sve više zahvata proces digitalizacije, promene se odslikavaju u načinu ...
Review of the method for extension of time on project with a case study
(14th International Scientific Conference “iNDiS 2018”, Novi Sad, November 21-23, 2018, 2018)
Tokom realiazacije projekta česta su kašnjenja od strane svih učesnika na projektu. Analiza kašnjenja ima za cilj ne samo kvantifikaciju ukupnog kašnjenja na projektu, već i determinaciju i raspodelu uticaja svakog od ...
Determination of the temperature transfer function of building constructions based on measurement data
(Materials Research Society of Serbia, 04-01-2015)
In this paper a method of determination of transfer function for temperature measured inside and outside residential building in Belgrade is presented. The instantaneous measurements of indoor temperature inside a living ...
The impact of architectural conceptual design on profit / Značaj arhitektonskog koncepta za rentabilnost projekata
(Građevinski fakultet, Subotica, 2014)
2010 Kraljevo Earthquake Recovery Process Metrics Derived from Recorded Reconstruction Data
(16th European Conference on Earthquake Engineering, 2018)
Earthquake resilience starts with a sudden drop of performance when an earthquake strikes followed by a relatively long recovery phase. The dynamics and volume of investment directly affect the rate and level of recovery. ...
Određivanje opterećenja loma dvopojasnih sistema primenom fuzzy (rasplinutih) brojeva
(Savez građevinskih inženjera Srbije, 2019)
U ovome radu se prikazano određivanja faktora graničnog opterećenja loma dvopojasnih nosača od betona i čelika pomoću fuzzy linearnog programiranja sa nepreciznim ulaznim podacima.. Problem je analiziran za eksperimentalne ...
Information system for planing and control of project realization
(Brno University of Technology, Faculty of Civil Engineering, 2010)
Project realization includes a lot of participants and information. Collecting and storing a huge amount of information is not an easy process. Integrated system for project management can make the process of collecting ...