Претраживање
Приказ резултата 41-50 од 54
The first municipal solid waste incinerator project in Southeast Europe
(4th International Conference on Sustainable Solid Waste Management, 23—25 June, 2016 Limassol, Cyprus, 2016)
Purpose
The City of Belgrade, the capital of Serbia, is in the project preparation phase for a publicprivate
partnership (PPP) project for the provision of services of treatment and disposal of
residual municipal solid ...
One modification of fuzzy TOPSIS method
(Emerald Group Publishing Limited, 2013)
Purpose
The purpose of this paper is to present one modification of the fuzzy TOPSIS (Technique for Order Preference by Similarity to Ideal Solution) and to develop a corresponding computer program which could be used for ...
Teaching computing for complex problems in civil engineering and geosciences using big data and machine learning: synergizing four different computing paradigms and four different management domains
(Springer, 2023)
This article describes a teaching strategy that synergizes computing and management, aimed at the running of complex projects in industry and academia, in the areas of civil engineering, physics, geosciences, and a number ...
An integrated solution for increased circularity in buidlings. A methodological framework
(15th International conference organization, technology and management in construction (OTMC), 21—24 September, 2022, Dubrovnik, Croatia, 2022)
Linking BrIM to BMS for bridges – concepts
(IABSE, 2023)
Bridge Information Model (BrIM) is currently replacing drawings as main deliverable in new bridge project.
Several use cases for BrIM over its lifetime is identified, as well as a discussion of the use case potential. ...
The Successful Delivery of Megaprojects: A Novel Research Method
(SAGE Publications Inc., 2017)
Megaprojects are often associated with poor delivery performance and poor benefits realization. This article provides a method of identifying, in a quantitative and rigorous manner, the characteristics related to project ...
Multicriteria optimizing of construction equipment selection by AHP method
(Hrvatska udruga za organizaciju građenja, 2011)
Construction equipment is a key resource in the realization of construction projects.
Correct and careful planning in the usage of construction equipment plays a vital role in the
economic success of every construction ...
COVID-19 Struggle and Post-COVID-19 Recovery: Exploring the Governance, Success, and Digital Transition in Construction Projects in Serbia
(Sustainability, 2023)
Construction, one of the largest global economic sectors, has been severely challenged by the economic uncertainties brought on by COVID-19. Since 2020, pandemic-related disruptions and remedial measures have made its ...
A digital solution for unlocking the urban mining potential of the residential building stock through the integration of BIM and GIS
(Conference on interdisciplinary and transdisciplinary research for sustainable development, 2022)
The construction industry consumes up to half of the excavated primary resources and
generates one-third of total waste annually, impacting the environment and society. To
reduce this impact, maintaining the primary ...
Geometry as a common ground for BMS and BIM
(IABSE Symposium, Prague 2022: Challenges for Existing and Oncoming Structures, 2022)
Bridge Management Systems (BMSs) are sophisticated software tools, widely used for managing bridges. Comprising a centralized database of all relevant information for the entire bridge stock and analytics to forecast ...