Application of fuzzy AHP for ranking and selection of alternatives in construction project management
(Taylor and Francis Ltd., 2017)
The construction project management (CPM) is very important and large segment of entire project management (PM). Realisation of construction projects is usually long term process which requests significant financial, ...
Elementarni model za analizu i procenu troškova u građevinarstvu / Elemental Model for Cost Analysis and Estimation in Construction
(Savez građevinskih inženjera i tehničara Srbije, 1997)
U radu su kratko navedeni principi i procedure procene troškova u građevinarstvu. Posebno je ukazano na značaj rane procene troškova, koja veoma mnogo utiče na poslovnu odluku o ozbiljnijem angažovanju na projektu. Kao ...
Procena čvrstoće betona pri pritisku, korišćenjem različitih funkcija zrelosti betona: primer iz prakse / Assesment of concrete compressive strength using different maturity functions: case study
(Građevinski materijali i konstrukcije, 2018)
Čvrstoća pri pritisku jeste svojstvo koje je veoma značajno u građevinarstvu, te postoji izražena potreba da se razviju metode za praćenje prirasta čvrstoće pri pritisku betona u konstrukciji. Prema zakonskim propisima ...
Estimating residual value of heavy construction equipment using ensemble learning
(http://cedb.asce.org, 2021)
Knowing the right moment for the sale of used heavy construction equipment is important information for every construction company. The proposed methodology uses ensemble machine learning techniques to estimate the price ...
Database for management of concrete batch plant work / Baza podataka za upravljanje radom fabrike betona
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2015)
A relational database that is designed and implemented for use in one concrete batch plant, with maximal production 30 m3/h, is presented in this paper. The database is developed using programming package Microsoft Access ...
Estimation of thermal impulse response of a multi-layer building wall through in-situ experimental measurements in a dynamic regime with applications
(Elsevier Ltd, 2018)
The dynamic thermal characteristics of the components of a building have a primary influence on the energy performance of the building's envelope under real environmental conditions. In this study, a novel approach for ...
Management of bridges with shallow foundations exposed to local scour
(Taylor and Francis Ltd., 2018)
The Serbian road network includes a large portion of bridges with shallow foundations vulnerable to local scour as tragically demonstrated during the extreme flooding in May 2014. Currently, the bridge management procedures ...
Application of multiple criteria goal programming for solving some management and production problems / Primena višekriterijumskog ciljnog programiranja za rešavanje nekih problema menadžmenta i proizvodnje
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2012)
One method for solving multiple criteria fractional goal programming problem is proposed in this paper. In this method are introduced deviational variables that express increases or decreases of objective functions related ...
Modelling of bridge elements deterioration for Serbian bridge inventory
(Taylor and Francis Ltd., 2014)
In order to improve bridge management practice for public roads in Serbia, a deterioration model for bridge elements was developed using condition data collected over the last 20 years. The distribution of condition data ...