Method in planning construction machinery replacement
Authors
Petronijević, PredragIvanišević, Nenad
Arizanović, Dragan
Marinković, Dejan
Petrović, Marija
Conference object (Published version)
Metadata
Show full item recordAbstract
One basic criteria for determining the replacement time of construction
machinery is based on the age , that is, the increase in operating costs of the machine
with time. The key factor which determines and justifies replacement at a given time is
the magnitude of operating costs. This analysis will show a method for replacement
planning and sale of machines in a future time period.
Keywords:
Construction Machinery / Cost / Machine replacementSource:
6th International Conference Contemporary achievements in civil engineering, 2018, 727-Publisher:
- Građevinski fakultet u Subotici
Collections
Institution/Community
GraFarTY - CONF AU - Petronijević, Predrag AU - Ivanišević, Nenad AU - Arizanović, Dragan AU - Marinković, Dejan AU - Petrović, Marija PY - 2018 UR - https://grafar.grf.bg.ac.rs/handle/123456789/2344 AB - One basic criteria for determining the replacement time of construction machinery is based on the age , that is, the increase in operating costs of the machine with time. The key factor which determines and justifies replacement at a given time is the magnitude of operating costs. This analysis will show a method for replacement planning and sale of machines in a future time period. PB - Građevinski fakultet u Subotici C3 - 6th International Conference Contemporary achievements in civil engineering T1 - Method in planning construction machinery replacement SP - 727 DO - 10.14415/konferencijaGFS2018.071 ER -
@conference{ author = "Petronijević, Predrag and Ivanišević, Nenad and Arizanović, Dragan and Marinković, Dejan and Petrović, Marija", year = "2018", abstract = "One basic criteria for determining the replacement time of construction machinery is based on the age , that is, the increase in operating costs of the machine with time. The key factor which determines and justifies replacement at a given time is the magnitude of operating costs. This analysis will show a method for replacement planning and sale of machines in a future time period.", publisher = "Građevinski fakultet u Subotici", journal = "6th International Conference Contemporary achievements in civil engineering", title = "Method in planning construction machinery replacement", pages = "727", doi = "10.14415/konferencijaGFS2018.071" }
Petronijević, P., Ivanišević, N., Arizanović, D., Marinković, D.,& Petrović, M.. (2018). Method in planning construction machinery replacement. in 6th International Conference Contemporary achievements in civil engineering Građevinski fakultet u Subotici., 727. https://doi.org/10.14415/konferencijaGFS2018.071
Petronijević P, Ivanišević N, Arizanović D, Marinković D, Petrović M. Method in planning construction machinery replacement. in 6th International Conference Contemporary achievements in civil engineering. 2018;:727. doi:10.14415/konferencijaGFS2018.071 .
Petronijević, Predrag, Ivanišević, Nenad, Arizanović, Dragan, Marinković, Dejan, Petrović, Marija, "Method in planning construction machinery replacement" in 6th International Conference Contemporary achievements in civil engineering (2018):727, https://doi.org/10.14415/konferencijaGFS2018.071 . .